Vous êtes sur la page 1sur 8

VARIOUS DPWH PROPOSED PROJECTS

(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)

STANDARD THREE-STOREY
SCHOOL BUILDING
(9, 12, & 15 - CLASSROOMS)

JOINT VENTURE OF
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
MANILA, PHILIPPINES

VARIOUS DPWH PROPOSED PROJECTS


(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD THREE-STOREY
SCHOOL BUILDING
(9, 12, 15 - CLASSROOMS)

REVIEWED: RECOMMENDING APPROVAL: APPROVED : CONCURRED :

MARIANO C. DEL CASTILLO GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON ARMIN A. LUISTRO
OIC, BUILDINGS DIVISION, BOD DIRECTOR IV, BOD UNDERSECRETARY SECRETARY SECRETARY
DEPARTMENT OF EDUCATION
ARCHITECTURAL
PERSPECTIVE
TABLE OF CONTENTS
GENERAL ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL
G-1 BILL OF QUANTITIES A - 10 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER S-1 GENERAL NOTES P-1 GROUND FLOOR, TYPICAL SECOND & EE - 1 GENERAL NOTES, LEGEND, FLUORESCENT LIGHT
G-2 BILL OF QUANTITIES CEILING, CONCRETE SUNBREAKER DETAIL, THIRD FLOOR PLUMBING LAYOUT FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
PERSPECTIVE, SECTION & SPOT DETAIL OF CEILING, S-2 GENERAL NOTES PANEL BOARD DIAGRAM AND ELECTRICAL RISER
G-3 BILL OF QUANTITIES
PLAN & SECTION OF VENTILATION P-2 ISOMETRIC SEWER LINE LAYOUT DIAGRAM ( 9-CL )
G-4 BILL OF QUANTITIES S-3 FOUNDATION PLAN, TYPICAL SECOND FLOOR &
G-5 BILL OF QUANTITIES THIRD FLOOR FRAMING PLAN
A - 11 STAIR DETAILS P-3 GROUND FLOOR, TYPICAL SECOND & EE - 2 POWER LAYOUT ( 9-CL )
G-6 BILL OF QUANTITIES S-4 COLUMN SCHEDULE, SCHEDULE OF FOOTING, THIRD FLOOR WATER LINE LAYOUT
A - 12 DETAIL BAY SECTION (ALONG TOILET) SCHEDULE FOOTING BEAMS, TYPICAL FOOTING DETAIL, EE - 3 LIGHTING LAYOUT ( 9-CL )
ARCHITECTURAL DETAIL BAY SECTION (ALONG CORRIDOR) ELEVATION OF COLUMN & DETAIL OF WALL FOOTINGS P-4 ISOMETRIC WATER LINE LAYOUT
DETAIL PLAN & SECTION OF TOILET, EE - 1 LOAD SCHEDULE, FLUORESCENT LIGHT FIXTURE
A-1 PERSPECTIVE, TABLE OF CONTENTS DETAIL OF COUNTER SINK S-5 PLAN FOOTING F-3, ELEVATION FOOTING F-3, P-5 ISOMETRIC DRAINAGE LINE LAYOUT MOUNTING DETAIL, ELECTRICAL RISER DIAGRAM,
PLAN FOOTING CF-1 & TYPICAL ELEVATION OF MICRO-PILE
PANEL BOARD DIAGRAM, GENERAL NOTES AND
A-2 KEY PLAN A - 13 DETAIL PLAN & SECTION OF TOILET, P-6 ROOF DRAIN LAYOUT, DETAIL SECTION LEGEND ( 12-CL )
S-6 SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY BEAMS,
DETAIL OF COUNTER SINK SCHEDULE OF SLABS, TYPICAL SLAB ELEVATION, OF DRAIN PIPE AND SPOT DETAIL
A-3 GROUND FLOOR PLAN, SECOND FLOOR PLAN & EE - 2 POWER LAYOUT ( 12-CL )
TYPICAL BEAM ELEVATION & TYPE OF STIRRUPS
SCHEDULE OF FLOOR FINISH A - 14 DETAILS OF BLACKBOARD P-7 PLAN SEPTIC TANK, LONGITUDINAL
S-7 DETAIL OF STAIR, RAMP DETAIL, DETAIL OF DC-1, SECTION, CROSS SECTION, COVER DETAIL, EE - 3 LIGHTING LAYOUT ( 12-CL )
A-4 THIRD FLOOR PLAN & FRONT ELEVATION DETAIL OF STAIR ON GRADE & DETAIL OF WALL ON FTB CATCH BASIN DETAIL, PLUMBING NOTES
AND LEGEND EE - 1 LOAD SCHEDULE, FLUORESCENT LIGHT FIXTURE
A-5 REAR, LEFT & RIGHT ELEVATIONS, CROSS SECTION S-8 ROOF FRAMING PLAN
MOUNTING DETAIL, PANEL BOARD DIAGRAM,
S-9 ELEVATION OF END WALL FRAME, DETAIL SECTION OF PC-1, SINGLE LINE DIAGRAM, GENERAL NOTES AND
A-6 LONGITUDINAL SECTION &GROUND FLOOR REFLECTED LEGEND ( 15-CL )
CONNECTION OF PURLINS TO RG-4,
CEILING PLAN
CONCRETE SUN BREAKER DETAIL
EE - 2 POWER LAYOUT ( 15-CL )
A-7 SECOND & THIRD FLOOR REFLECTED CEILING PLAN S - 10 TRUSS DETAILS CONNECTION DETAILS
EE - 3 LIGHTING LAYOUT ( 15-CL )
A-8 ROOF PLAN, SPOT DETAIL PLAN AND SECTION OF 1 & 2, S - 11 BASE PLATE DETAILS, ANCHOR BOLT DETAIL,
DOOR FRAME TYPICAL PLAN & SECTION DETAIL, ROOF PANEL SIDE LAP DETAIL, J-BOLT TO PURLIN
GLASS JALOUSIE TYPICAL DETAIL PLANS, GLASS JALOUSIE CONNECTION DETAIL, J-BOLT SPACING, PURLIN
TYPICAL DETAIL SECTIONS CONNECTION DETAIL, SECTION, TRUSS DETAIL AT
GUTTER END
A-9 SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN, ELEVATION &
SECTION OF RAMP, SPOT DETAILS

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
PERSPECTIVE, 7
NOTE : STANDARD THREE-STOREY TABLE OF CONTENTS A-1
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 47
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 15-CLASSROOMS )
( 12-CLASSROOMS ) ( 9-CLASSROOMS )
THIRD FLOOR PLAN THIRD FLOOR PLAN

( 12-CLASSROOMS ) ( 9-CLASSROOMS )
SECOND FLOOR PLAN SECOND FLOOR PLAN

( 12-CLASSROOMS ) ( 9-CLASSROOMS )
GROUND FLOOR PLAN GROUND FLOOR PLAN
K E Y P L A N

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 8
NOTE : STANDARD THREE-STOREY KEY PLAN A-2
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 47
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 9, 12 & 15-CLASSROOMS )
SCHEDULE OF FINISH

SECOND FLOOR PLAN

GROUND FLOOR PLAN

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
GROUND FLOOR PLAN, 9
NOTE : STANDARD THREE-STOREY SECOND FLOOR PLAN, A-3
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON SCHEDULE OF FINISH 47
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 15-CLASSROOMS )
FRONT ELEVATION

THIRD FLOOR PLAN

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
THIRD FLOOR PLAN & 10
NOTE : STANDARD THREE-STOREY FRONT ELEVATION A-4
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 47
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 15-CLASSROOMS )
RIGHT SIDE ELEVATION LEFT SIDE ELEVATION CROSS SECTION

REAR ELEVATION

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
REAR, LEFT & RIGHT ELEVATION, 11
NOTE : STANDARD THREE-STOREY CROSS SECTION A-5
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 47
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 15-CLASSROOMS )

Vous aimerez peut-être aussi