Vous êtes sur la page 1sur 1

67826 Federal Register / Vol. 67, No.

216 / Thursday, November 7, 2002 / Notices

DEPARTMENT OF DEFENSE capacity due to vegetation growth and U.S. Coast Guard; Natural Resources
sediment accumulation, thereby Conservation Service; U.S. Forest
Department of the Air Force requiring major maintenance. Corrective Service; U.S. Environmental Protection
maintenance actions will require Agency; U.S. Fish and Wildlife Service;
HQ USAF Scientific Advisory Board; extensive channel cleanout, channel Mississippi Department of
Meeting clearing, and snagging within the Big Environmental Quality; and Mississippi
AGENCY: Department of the Air Force, Sunflower channel system. Department of Wildlife, Fisheries and
DoD. FOR FURTHER INFORMATION CONTACT: Parks. Federally recognized Indian
ACTION: Notice of meeting. Questions about the proposed action Tribes will also be invited to cooperate.
and Draft Supplemental Environmental These agencies and tribes will be asked
SUMMARY: Pursuant to Public Law 92– Impact Statement (DSEIS) should be to participate in the review of study data
463, notice is hereby given of the directed to: Mr. Marvin Cannon, and the DSEIS.
forthcoming meeting of the 311th Vicksburg District Corps of Engineers, 4. Upon completion, the DSEIS will
Human Systems Wing Advisory Group. 4155 Clay Street, CEMVK–PP–PQ, be distributed for agency and public
The purpose of the meeting is to provide Vicksburg, MS 39183–3435 or telephone review and comment. Additionally, a
technical advice and assessment to the (601) 631–5437. public meeting will be held to present
Commander, 311th Human System SUPPLEMENTARY INFORMATION: This results of the DSEIS evaluations and the
Wing. Because classified and contractor- project is authorized by the Flood recommended plan.
proprietary information will be Control Act (FCA) of December 22, 1944 5. The DSEIS is estimated to be
discussed, this meeting will be closed to (House Document [HD] 516–78–2), as completed in November 2003.
the public. amended by FCAs of July 24, 1946, and Frederick L. Clapp, Jr.,
DATES: November 24–27, 2002. May 17, 1950, October 23, 1962 (HD– Colonel, Corps of Engineers, District Engineer.
ADDRESSES: Brooks City Base, San 358–89–2), and October 27, 1965 (HD– [FR Doc. 02–28358 Filed 11–6–02; 8:45 am]
Antonio, Texas. 308–88–2). BILLING CODE 3710–PU–M
FOR FURTHER INFORMATION CONTACT: 1. A Final Environmental Impact
Major John Pernot, Air Force Scientific Statement (FEIS), Flood Control,
Advisory Board Secretariat, 1180 Air Mississippi River and Tributaries, DEPARTMENT OF DEFENSE
Force Pentagon, Room 5D982, Yazoo Basin, Mississippi, was
Washington DC 20330–1180, (703) 697– completed in December 1975, covering Department of Army; Corps of
4811. the original flood control project on Big Engineers
Sunflower River. A Final Supplemental
Pamela D. Fitzgerald, No. 2 to the FEIS, Flood Control, Intent To Prepare A Joint
Air Force Federal Register Liaison Officer. Mississippi River and Tributaries, Environmental Impact Statement/
[FR Doc. 02–28285 Filed 11–6–02; 8:45 am] Yazoo Basin, Mississippi, Big Sunflower Environmental Impact Report for the
BILLING CODE 5001–5–P River Maintenance Project was Peninsula Beach Feasibility Study,
completed in July 1996, for maintenance Long Beach, Los Angeles County, CA
of the original flood control project on
AGENCY: Department of the Army, U.S.
DEPARTMENT OF DEFENSE the Big Sunflower River. A Draft
Army Corps of Engineers, DoD.
Environmental Assessment (EA) was
Department of the Army; Corps of prepared in February 2002 to ACTION: Notice of Intent.
Engineer supplement the information contained SUMMARY: The U.S. Army Corps of
in Supplement No. 2 to the FEIS, Flood Engineers (Corps) and the city of Long
Intent To Prepare a Draft Supplemental
Control, Mississippi River and Beach propose to assess the feasibility of
Environmental Impact Statement for
Tributaries, Yazoo Basin, Mississippi, providing additional storm damage
the Big Sunflower River Maintenance
Big Sunflower River Maintenance protection for a portion of the Peninsula
Feasibility Report
Project. The Draft EA was circulated for Beach between the Alamitos Bay west
AGENCY: Department of the Army, U.S. agency and public review and comment. jetty and approximately 54th Place.
Army Corps of Engineer, DoD. To ensure the environmental
DATES: A scoping meeting will be held
ACTION: Notice of Intent. sustainability of this project, the District
Engineer has decided to prepare a on November 13, 2002, at 6:30 p.m., in
SUMMARY: Authorized channel DSEIS No. 3 to the FEIS, Flood Control, the Belmont Plaza Pool, 4000 Olympic
improvements in the Big Sunflower Mississippi River and Tributaries, Plaza, Long Beach, California.
River Basin began in the 1940s and were Yazoo Basin, Mississippi, Big River FOR FURTHER INFORMATION CONTACT:
completed in the 1960s. The work Maintenance Project. Questions regarding the scoping process
consisted of channel improvements on a 2. The proposed action involves or preparation of the Environmental
number of streams including the Big evaluating several non-structural and Impact Statement/Environmental
Sunflower and Little Sunflower Rivers structural alternatives of channel Impact Report (EIS/EIR) may be directed
and Bogue Phalia; channel cleanout of sediment and debris from to Mr. Paul Rose, Chief, Environmental
improvements consisted primarily of the channel bottoms and channel Resources Branch, U.S. Army Corps of
clearing and snagging, with some clearing and snagging to restore the Engineers, PO Box 532711, Los Angeles,
channel enlargement and channel project channels to authorized design CA 90053–2325, (213) 452–3840.
cleanout. The Big Sunflower River Basin capacities. SUPPLEMENTARY INFORMATION:
has experienced extensive flooding to 3. A public scoping meeting will be 1. Proposed Action: Peninsula Beach
agricultural land and urban areas in held in December 2002 in Rolling Fork, is a chronically narrow beach that has
recent years. Results of surveys taken MS. Significant issues identified during undergone repeat nourishment projects
and engineering data collected indicated this scoping process will be analyzed in by the City of Long Beach to provide an
the lower reaches of the project streams depth in the DSEIS. The following adequate beach width for protection of
had experienced loss of designed agencies are invited to cooperate: The homes and beach facilities, and

VerDate 0ct<31>2002 16:18 Nov 06, 2002 Jkt 200001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:\FR\FM\07NON1.SGM 07NON1

Vous aimerez peut-être aussi