4. Name of First Up, Main Protections & protection on which GCB tripped:
Boiler Tripped On:- Turbine Tripped.
Turbine Tripped On:- Hand Tripped.
5. A) Observations :- Set withdrawn for Boiler validity extension.
5. B) Remedial Action/work done I
I NA
9. Crtr" Anrlytit r M
Root
Tveventive action suggested (Short Term) NA
8. Preventive action suggested (Long Terrn) NA
9A. lmplementation Status of Long Term/Short Term measures stated at sr No 9:- NA.
Chief Engin-eer
Khaperkheda TPS
CElDyCE(Works)
*HO Code will be given by Works Section,
I
I
Doc. No.
KHAPERKHEDA T.P.S. Rev. No.
Rev" date :
A) TO BE RECORpED BY Om
1> EVENT r$rfE: ] L' 17 DATE: L-2-^ I Lt w(7
2> OPERATING CONDI|qNSATT|ME OF EVENT :
t(77
"=:= W ryu
-L9AD(MW)
.. lAtlz-D'E,.F.c W
MVAR I
E> BRINGING BACK THE SET ON BAR (rN CASE OF SET TRtpplNG):
BOILER LIGHT UP .
TIME: Zo lr f llW DATE- L+- l?^ ry(-
TG SET SYNCHRONISATION TIME: &+-eZ*
Kyt DATE; 2*T - tL - Ze(r
1o' pRoBLEM FAcED DURTNG BRTNGING BAcK THE sET oN BAR / NoRMeltsnrtoN
.a
SHIFT INCI'IARGE r
3>
coRRECTtVE ACTTON TO AVOTD REOCCURRENCE OF ABOVE : RESPONSIBILITY TARGET DATE
Fr 1f \l_ 1(\\d
>
E.E.( TESTINc-ll-f E.E.( C&l)}y)
NAME:- V, A. De &6a -r
NAME:- V,A . Dcg.p'.r
a
) i
c) To BE RECORDED BY MAINTENANCE SECTION :
1> ANALYSIS OF TRIPPING & PROBLEM FACED DURING LIGHT
UP & SYNCHRONISATION :-
e.e.( en-nt'l'
E.E.( E
9. . Sa,T'u 3<-
D> REMARKS:
s.E. ( OP-ll )
.r a
WORK CARRIED OUT DURING SHUT DOWN DTD. 22.I2.I5TO 24.L2.I5
Sr.
Work Description
No,
T APH - A & B water washing by F/F water done.
7 At Soot Blower Station pressure guage issolating valve replacement done. 3 Nos. valve replaced.
9 Boiler door at 55 Mtr. Coil & Door repairing done at LHS & RHS (Refrcatory Pouring)
1_0 All Boiler peep hole - Asbestos rope fitting / sealing done.
11 SB - 59 & its issolating valve gland leakage attended.
15 SD- 7 & B, RO- 64, S-L47 , L4B, L49,150 gland tight done.
22 *t (t)t.".*t*-t*.-
23 APH - B steam leakage near SB drain line near pnumatic valve attended
25 LUR reject silo inside accumulated reject removed. (RHS side partial) &bag filter clean.
During Shut down for Boiler validity extension following leakhges observed,
same is attended & hydraulic test carried out The detait is as bellow
Location T
1st Pass Front Water Wall Corner No. 4 GH Elevation.
Primary Failure r
1. At 35 Mtr. at W.W. burner panel corner No. 4 (Looking frorn inside
of furnace first tube adjacent to front W.W. panel.
Secondary Failure - 1. At 35 Mtr. starting from burner panel corner No. 4 (Looking from
inside of furnace first tube of front W.W. panel).
Corfective & - All puncture & worn out tube replaced. Tube Thickness survey
Preventive Action analysis will be carried out during AOH. Sample will be sent'for
metallurgical analysis to detect exact root cause of failure.
A
rl{.1
Reg. No. U-40100 MH 2005 PuC iigOaS Email - cqge,nKR hd@ mflha,ge nco'i 4
i
Date: 2911212015
TURBINE MAINTENAIICB.STAGE.II
UNIT Np. i,q$lJT qowN,RpPgRr
2
ii
cleaning, welding done.
' : : ': ;=:':::;::: ;: qrauls ;:::::;;ttlle
Hpfaater 68 drip manual drain valve replaced with new valve [ul-rbuuJ. tfs orlp
3
choke up removed.
I
qrarn varv' I ePr':rueu-I I a t_
ilgfp-A Conical strainer cleaning & box up done wim new gaSKeE 6t I1s
4
with new one.
I I !
5 fngpp-R turbine casing drain line online clamp removeo & welsmg trone on reaKaBer PuurL'
n PumP mechanical seal filters & coolers cleaning
6
done.
r
seal inlet pipe welomg qone on teaKate Puurt'
I
TDBFP A & B MCV & I/H COnVertOr spool, governlng luDe oll
9
done.
1.0 fUgpp-g gland seal Station (meChanical Seal Cooling inleu lme welqmg sQnE on rea,.d't Pu'r'
LI
L2
13 TF
L4 HPH-6A venwalve gland replaced with new one'
15 HPtt{B root valte gland leakage attended.
L6
L7
ed with new one' i
o
1B
Primary water pUmp-B alignment done & Coupllng Sploef feplaceo wlul
20
found ok.
2L Cal oit systerfiir side cooler No' 2 cleaned'
ken' No leakages observed'
22
23 trtOf tuUe oil duplex'filters cleaned'
24
31,
Seal oil system air side DPR adjusted from DP EE/TE 1.53/L.54 to L.72 / L.7L and ring relief
pressure. TE/EE 3.67 / 4.95 to 5.27 / 5.27. W Cmz
EXV-13 checked. Manual operating lever not getting engaged. Valve iamming removed. EXV-13
32
made free for electrical operation.
M. ,t
&u\\e-
Dy.Ex. Addl. Ex. Enginber (TM-II)
":K,!:1f"7
500MW TPS, Khaperkheda 500MW TPS, Khaperkheda
(P$,l*dri re-
Executive Engiheer (TM-II)
500MW TPS, Khaperkheda 500MW TPS, Khaperkheda
7 LPBP-I Stop valve limit switch mounting plate was dislocated from its
loction,plate welding carried out by T/M ,limit switches adjusted , trial Trial Ok
ta ke n.
8 HBPE-L valve servovalve cleaned, oil filter on oil supply line replaced.All
Trial Ok
HP bypass valve trial taken.
9 HP Bypass oil supply unit-l filter oil leakage attended.
10 Air Heater-A & B air motor solenoid checked & solenoid trial taken. Trial Ok
LL TDBFP-A EHTC primary DPU replaced, DPU changeover from primary to
Trial Ok
secondary & secondary to primary trial taken.
L2 TDBFP-A oil pressure transmitter oil leakage attended.
13
ESP Hopper Ash level high sensors
\,,/ DIH4,A4H3 was da maged
A1 H3,A1 H2,A2H8,A3 H4,BLH4,B2 H6, 83 H5,
L4 ESP hopper C & D pass Ash level high sensors checked. found OK.
15 ESP hopper B pass Ash high level sensors checked. found OK.
L6 ESP hopperA pass Ash high level sensors checked. found OK.
L7
AHP PLC panel power supply checking work.
18
L2 channel recorder installed at FOPH for monitoring the parameters.
(o
zelb
EE ( C&t-il
1x500MW Khaperkheda TPS
Boiler MCCa/C L,2 & B/C:- Control Ckt. Modification and Protection
L Trial OK.
relay logic modification done.
A Pass B/S -2Outlet Gate:- DOL modified JB installed &
2 Trial OK.
commissioned. Limit setting done.
B Pass B/S-1 and B/S-2 lnlet and Outlet Gate :-Close and open limit
3 Trial OK.
switch setting done.
4 C Pass B/S-1 lnlet Gate:-Close and open limit switch setting done. Trial OK.
D Pass B/S-1 and B/S-2 lnlet and Outlet Gate:-Close and open limit
5 Trial OK.
switch setting done.
6 C Pass B/S-2 Field No.5 and 8:- OCC Test carried out Trial OK.
7 WWSB No.55:- Control circuit checked and trial taken. Trial OK.
8 SMV 22:- New actuator mounted and limit switch setting done. Trial OK.
9 SOP 1 & 2 :-Current Transducer connection done at CRE Panel. Trial OK.
$OO"Srw l{hffitsrlrhe da HPs
Work cat'riecl t:ut 1:y* HM-II cluring shut dollt.
Ilat e : 22.12,20 I 5 to 24 ,12 .2{} 1 5
Remark
Cornptrctcd..
iclclne.
i
I
i
:l
:t
livlPrimaryWater# R l\,fotcr
i I ..r A ,.-r r-t -, ... AI Y'1 rr 1r'-
i I vlAC $canner Air: Fnr.r Motr:r
r
l{a
i
i clane,
ilPA lan tr:r: -A fk B
i
i
',t
I
iil Fn Fan Mr:l*r *A tk B
iii) I\{DBFP h4ator
ir') trlf Fan fu'trctr;r 5A 8s 5ts
L{
Executive Bngintr !nnA-U1