Design of the Steel Beam for Jail Building

Given:
M1= 201 kNm F y = 248 MPa
M2= 187 kNm Lb = 2000 mm
Assume compact section,
Fb =0.66 F y

Fb =0.66 ( 248 ) tf

Fb =163.68 MPa

201
S required = 6
=1228 103 mm3
163.68 10
Try section W21X44

3 3
S x =1337.210 mm
kg
W beam=66 9.81=0.6475 kNm
m
2
wL
M beam=
12

0.6475 20002
M beam=
12
M beam=.216 kNm

M recomputed=201+.216=201.216 kNm

201.216
S recomputed = 6
=1229 103 mm 3
163.68 10
S x > Srecomputed

use section W 21 44
Verification of Fb, laterally supported
Lb=2000 mm

200b f
Lc =
Fy
200 165.1
Lc = =2096.77 mm
248
Lb < Lc

use F b=0.6 F y =148.8 MPa


Design of the Steel Beam for Administration Building

Given:
M1= 229 kNm F y = 248 MPa
M2= 145 kNm Lb = 4000 mm
Assume compact section,
Fb =0.66 F y

Fb =0.66 ( 248 )

Fb =163.68 MPa

229
S required = 6
=1399 103 mm3
163.68 10
Try section W21X50

3 3
S x =1548.210 mm
kg
W beam=74.6 9.81=0.7318 kNm
m
2
wL
M beam=
12

0.7318 40002
M beam=
12
M beam=.976 kNm

M recomputed=229+ .976=229.976 kNm

229.976
S recomputed = 6
=1405 103 mm 3
163.68 10
S x > Srecomputed

use section W 21 50

Verification of Fb , laterally supported

Lb=4000 mm

200b f
Lc =
Fy
200 165.9
Lc = =2106.93 mm
248
Lb > Lc

L 4000
= =98.43 mm
r t 40.64
2
M M
Cb =1.75+1.05 2 +0.3 22 2.3
M1 M1

145+ .976 ( 145+.976 )2


Cb =1.75+1.05 + 0.3 2
=1.22
229+ .976 ( 229+.976 )
Cb =1.22 2.3

C b=1.22
Allowable bending stress in compression:

703270 C b
Fy
=

703270 1.22
248
=58.82
3516330 C b
Fy
=

3516330 1.22
248
=131.52

2 82740 Cb

( )
L

Fb 1 =
2

Fy
() rt
F y 0.60 F y
Fb 3 =
L d
( )
0.6 F y

3 10.55 106 Cb Af

82740 1.22
4000 2 Fb 3 = =107.61 MPa
2
(
Fb 1 =
248
40.64 (
3 10.55 106 1.22
)
248=118.82 MPa ) 4000 529.1
165.9 13.60 ( )
Fb 3 <0.6 F y

use F b=0.6 F y =148.8 MPa

Design of the Steel Beam for Infirmary Building

Given:
M1= 132 kNm F y = 248 MPa
M2= 126 kNm Lb = 2000 mm
Assume compact section,
Fb =0.66 F y

Fb =0.66 ( 248 )

Fb =163.68 MPa

132
S required = 6
=806.5 103 mm3
163.68 10
Try section W18X35

3 3
S x =944.3 10 mm
kg
W beam=52.3 9.81=0.5131 kNm
m

w L2
M beam=
12

0.5131 20002
M beam=
12
M beam=.171 kNm

M recomputed=132+.171=132.171kNm
132.171
S recomputed = 6
=807.5 103 mm3
163.68 10
S x > Srecomputed

use section W 18 35

Verification of Fb , laterally supported

Lb=2000 mm

200b f
Lc =
Fy
200 152.4
Lc = =1935.5 mm
248
Lb > Lc

L 2000
= =52.84 mm
r t 37.85
2
M2 M2
Cb =1.75+1.05 +0.3 2 2.3
M1 M1
2
132+.171 ( 132+.171 )
Cb =1.75+1.05 +0.3 2
=0.98
126+ .171 ( 126+.171 )
Cb =0.98 2.3

C b=0.98

Allowable bending stress in compression:

703270 C b
Fy
=

703270 0.98
248
=52.72
3516330 C b
Fy
=

3516330 0.98
248
=117.88

2 2

( ) ( )
L 2000
2
Fb 1 =
Fy
()
rt
F y 0.60 F y Fb 1 =
2

248 ( 37.85 )
248=148.72 MPa
3 10.55 106 Cb 3 10.55 106 0.98
82740 Cb 82740 0.98
Fb 3 = 0.6 F y Fb 3 = =149.79 MPa
2000 449.6
( LAd )
f
( )
152.4 10.90

Fb 3 >0.6 F y

use F b 3=149.79 MPa

Design of the Steel Beam for Workshop Building

Given:
M1= 180 kNm F y = 248 MPa
M2= 104 kNm Lb = 4000 mm
Assume compact section,
Fb =0.66 F y

Fb =0.66 ( 248 )

Fb =163.68 MPa

180 3 3
S required = 6
=1099.71 10 mm
163.68 10
Try section W18X40

3 3
S x =1314.6 10 mm
kg
W beam=59.9 9.81=0.5876 kNm
m

w L2
M beam=
12
2
0.5876 4000
M beam=
12
M beam=.7835 kNm

M recomputed=180+ .7835=180.7835 kNm

180.7835 3 3
S recomputed = 6
=1104.5 10 mm
163.68 10
S x > Srecomputed

use section W 18 40

Verification of Fb , laterally supported

Lb=4000 mm

200b f
Lc =
Fy
200 152.8
Lc = =1940.56 mm
248
Lb > Lc

L 4000
= =103.6 mm
r t 38.61
2
M2 M2
Cb =1.75+1.05 +0.3 2 2.3
M1 M1
2
180+.7835 ( 180+.7835 )
Cb =1.75+1.05 + 0.3 2
=0.83
104 +.7835 (104 +.7835 )
Cb =0.83 2.3

Cb =0.83

Allowable bending stress in compression:

703270 C b
Fy
=

703270 0.83
248
=48.51
3516330 C b
Fy
=
3516330 0.83
248
=108.48
2 82740 Cb

( )
L

Fb 1 =
2

Fy
()rt
F y 0.60 F y
Fb 3 =
L d
( )
0.6 F y

3 10.55 106 Cb Af

82740 0..83
2 Fb 3 = =76.78 MPa

( )
4000
Fb 1 =
2

248 (
38.61 )
248=89.59 MPa
4000 454.7
(152.9 13.3 )
3 10.55 106 0.83
Fb 1 <0.6 F y

F b=0.6 F y =148.8 MPa

Comparison of Reinforced Concrete Beam and Steel Beam


Instead of using hot rolled I-beam as a structural member, Reinforced concrete

beam will be used . After structural analysis, the summary of the results are as follows.

Building RCB Size Cost of RCB Hot-rolled Cost of Hot-

per linear I-beam size rolled I-beam

meter per linear meter


Administration 300 x 450mm Php. 1084.50 W 21 x 44 Php. 8448.00
Infirmary 250 x 400mm Php. 962.00 W 21 x 50 Php. 9548.80
Workshop & 300 x 500mm Php. 1137.00 W 18 x3 5 Php. 7112.8

A.L.S. Building
Jail 300 x 500mm Php. 1137.00 W 18 x 40 Php. 8146.8

Compare with the linear meter cost of the Reinforced Concrete Beam (RCB),

Hot-rolled I-beam is very costly, as shown in the table above.