Vous êtes sur la page 1sur 4

LIST OF EXPERIMENTS

LEVEL 2

1. Wiring and trouble shooting of single phase and three phase connection using megger

and multimeter.

2. Wiring of single phase induction motor with ICDP and DOL starter using PVC conduit.

3. Rewinding of 3 and 1 induction motor.

4. Wiring of 3 induction motor using DOL starter.

5. Wiring of 3 induction motor using star-delta starter.

6. Wiring of 3 energy meter with ICTP using PVC conduit.

7. 3 wiring of office building using MCB, ELCB (RCCB) with casing and capping.

8. Rewinding of fan and mixer.

9. Wiring of inverter (650 VA, 850 VA) for home.

10. Wiring for air conditioner with metal clad 3 pin socket (30 A).
Experiment No.1: Wiring and trouble shooting of single phase and three phase connection
using megger and multimeter.

S.No Material required Quantity Availability


(Yes / No)
1. Multimeter 1 Yes
2. Megger 1 Yes
3. PVC pipe , screw, wire (2.5 sq.mm) As per yes
requirement

Experiment No.2: Wiring of single phase induction motor with ICDP and DOL starter using
PVC conduit.

S.No Material required Quantity Availability


(Yes / No)
1. ICDP switch 1 Yes
2. DOL starter (1 ph) 1 No
3. PVC pipe , screw, wire (2.5 sq.mm) As per yes
requirement
Experiment No.3: Rewinding of 3ph and 1 induction motor.

S.No Material required Quantity Availability


(Yes / No)
1. Rewinding machine (3phase) 1 No
2. Copper wire ( for 3 ph and 1 ph motor) 1 Kg No
3. Insulation material (millimax 7mm) 2m No
4. Varnish 2L No
5 Empire cloth 2m No
6 Cotton tape (1 inch) 2 roll No
7. Cotton thread 4 roll No
8. Scissor (stainless steel) 10mm No
Experiment No.4: Wiring of 3 induction motor using DOL starter.

S.No Material required Quantity Availability


(Yes / No)
1. 3 ph. Induction motor 1 No
2. DOL starter (3ph) 10A 1 No
3. PVC pipe , screw, wire (2.5 sq.mm) As per yes
requirement

Experiment No.5: Wiring of 3ph induction motor using star-delta starter.

S.No Material required Quantity Availability


(Yes / No)
1. Star Delta starter (15 A) 1 No
2. PVC pipe , screw, wire (4 sq.mm) As per requirement yes

Experiment No.6: Wiring of 3ph energy meter with ICTP using PVC conduit.

S.No Material required Quantity Availability


(Yes / No)
1. 3 phase energy meter (Analog) 1 No
2. ICTP (30 A) 1 No

3. PVC pipe and screw As per requirement yes


4 wire (4 sq.mm) Red, Yellow, Blue, Green and black 1 roll each No

Experiment No.7: 3 wiring of office building using MCB, ELCB (RCCB) with casing and
capping.

S.No Material required Quantity Availability


(Yes / No)
1. MCB (40A), 3 phase 1 No
2. MCCB (60 A ), 3 Phase 1 No
3. RCCB (63A) 1 No
4. PVC pipe , screw, wire (4 sq.mm) As per requirement yes
Experiment No.8: Rewinding of fan and mixer.

S.No Material required Quantity Availability


(Yes / No)
1. Rewinding machine (for FAN) 1 No
2. Copper wire (36 SWG ) 1 Kg No
3. Insulation material (millimax 7mm) 2m No
4. Varnish 2L No
5 Empire cloth 2m No
6 Cotton tape (1/2 )inch 2 roll No
7. Cotton thread 4 roll No
8. Scissor (stainless steel) 10mm No

Experiment No.9: Wiring of inverter (650 VA, 850 VA) for home.

S.No Material required Quantity Availability


(Yes / No)
1. Inverter (650 VA) 1 No
2. Battery (100 ah) 1 No
PVC pipe , screw, wire (4 sq.mm) and tools As per yes
requirement

Experiment No.10: Wiring for air conditioner with metal clad 3 pin socket (30 A).

S.No Material required Quantity Availability


(Yes / No)
1. 30 A Metal clad set (for air conditioner) 2 No
2. Wire (4 mm) 3 Roll Yes