E.W Excavation
E.W Excavation
Abutment - A2 /
Abutment - A1 /
Abutment - A1 /
Abutment - A2 /
Pier - P3 / Inner
Pier - P1 / Inner
Pier - P2 / Inner
Pier - P4 / Inner
Pier - P2 /Inner
Pier - P4 /Inner
Pier - P3 /Inner
Pier - P1 /Inner
Abutment/Pier
Abutment cap
Back Filling &
Crash Barrier
anc
Arrangement
Filter Media
Filter Media
Bed Block
Bed Block
Deck Slab
Deck Slab
Chainage
Dirt Wall
Dirt Wall
Ext Wall
Ext Wall
Ext Wall
Ext Wall
y
S. No
PCC
PCC
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
cap
Raft
Raft
Ser
vice
s
Span
for
4
1
lani 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
ng
1 3x5.70 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 313+651 1 1 1 1 1 1 1 1 1 5 5
of
Sol
2 2x16.30 5 5 2 1 5 1 1 1 1 1 1 1 321+352 5 5 5 5 5 5 5 5 5 5 5 5
apu
r-
3 1x22.00 (UBP) 5 5 5 5 5 1 1 1 1 1 1 327+650 1 1 1 1 1 1 5 5 5 5 5
MH
/KA 7x4.50 (UBP)
4 5 5 1 1 1 1 1 1 1 1 1 1 1 328+677 1 1 1 1 1 1 1 1 5 5
Boa B Type
rde
5 2x3.90 1 1 1 1 1 1 1 1 333+438 1 1 5 5 5 5 5 5 5 5 5 5 5 5 5
r
sec 2x10.00 (Abt)
6
tion 1 1 1 1 1 1 1 1 1 1 335+019 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
1x10.15 (Pier)
of
7
NH- 2x7.00 1 1 1 1 1 1 1 1 1 335+138 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
09
8 4x.12.0 5 5 5 1 1 1 1 1 1 1 1 1 335+218 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
fro
m9 3x7.0 (B Type) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 343+304 1 1 1 1 1 1 1 1 1 2
(K
10
m. 2x4.90 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 345+098 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
249
11 2x5.00 1 1 1 1 1 1 1 1 346+155 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
+0
00
12 3x14.00 5 2 1 5 2 1 1 1 1 1 1 1 1 346+322 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
to
Km.
349 1 Work Completed 2 Work In Progress 3 Not Applicable 4 Widening Portion 5 Not Yet Started
+0
00)
in
the
Sta
te
of
Ma
har
ash
tra
on
DB