Académique Documents
Professionnel Documents
Culture Documents
Brand Features
Item Description
Type 1 Surge Arrester, 3 Phase 120/208V WYE, or 3 Phase Delta 240V, UL 1449 3rd
Ed. Polycarbonate Enclosure with UV Inhibitors.
Technical Information
Electrical Specifications Mechanical Specifications
Voltage: 120/208V 3PY, 240V 3 Phase Enclosure Type: NEMA 3R
UPC Code: 07847752559 Delta Connection Type: Parallel Connection:
Frequency: 50/60Hz Hardwired via 10AWG wire
Country of Origin: Mexico - *Eligible for
ARRA funded projects > $7,443,000 Surge Technology: TPMOV Diagnostics: Protection Status LEDs &
Audible Alarm
Environmental Specifications
Performance Data
Flammability: Rated V-2 per UL94
MCOV: 150V
Operating Temperature: -10C to 60C
Nominal Discharge Current Rating:
Storage Temperature: -20C to 85C 20kA
Maximum Surge Current, Per Mode
(Per Phase): 50kA (50kA)
Material Specifications
Voltage Protection Rating (VPR)
Enclosure: Polycarbonate with UV (Clamping) L-N/L-L: 600V/800V
inhibitors
Warranty
Product Warranty: Limited Lifetime
Connected Equipment Coverage: Up to
$10,000
Leviton Manufacturing Co., Inc.
201 North Service Road, Melville, NY 11747
Telephone: 1-800-323-8920 FAX: 1-800-832-9538 Tech Line (8:30AM-7:30PM E.S.T. Monday-Friday): 1-800-824-3005
*Buy American Compliant Logo -- The American Recovery And Reinvestment Act of 2009 (ARRA) provides federal grants
and loans for projects throughout the country. Section 1605 of the Act, named the Buy American provision, requires that
certain materials and manufactured products used in projects funded by the Act be manufactured in the United States. The
appearance of the Recovery Act Logo in relation to a Leviton product is only intended to reflect that such product may be
used in an ARRA funded project. It does not mean that such product or Leviton is sponsored or endorsed by, or that Leviton
receives funds from, the federal government or the Recovery Accountability and Transparency Board. Nothing in Levitons
use of the logo is intended to suggest anything regarding the requirements for funding under ARRA.