Vous êtes sur la page 1sur 8

Internal Safety Inspection Report

Inspection Area/Activity : Maintenance Workshop ADR Date of inspection : June 28, 2017

Inspection Team : Kresna Yasha and Febri Arwan Location : ADR

No Findings Action Taken/Recommendation PIC Status Target Date


1 Put sign for Maintenance Workshop Febri Arwan Open 12 July 2017
ADR

No sign for building

2 Positive and
good findings

Fire Extinguisher
available, pressure
OK and routine
inspection was
done.
Internal Safety Inspection Report

3 Rubbish not Carry out housekeeping and notify Febri Arwan Closed 29 June 2017
collected for few Enviro or PBU for collection.
days and scattered
by dogs or cats.

4 Make drainage and put more gravel in Arsyad Tunru Open 21 July 2017
the area.

Area in front of
and in back of
w/shop is muddy
because there is
no drainage
Internal Safety Inspection Report

5 Carry out housekeeping for all work Setyo Yudho Closed 30 June 2017
shop and tidy up all materials ex
projects.

Materials Scattered
and not tidy

6 Electric Panel well Positive and


marked and good findings
locked, there is
also grounding
available.

7 Improper storage Move the Ladders and find better Arsyad Tunru Open 12 July 2017
of Tools/Ladders. storage.
Internal Safety Inspection Report

8 Make Lid and secure the Acetylene + Febri Arwan Open 12 July 2017
Oxygen bottle.

Need to secure the


Need Cover lid so Acetylene and
not accommodate Oxygen storage.
water
9 Positive and
good findings

Notice board available

10 No small bucket, Order to PBU Febri Arwan Open 7 July 2017


use a helmet.
Internal Safety Inspection Report

11 Order fire extinguisher to safety or ERT Arsyad Tunru Positive and 7 July 2017
good findings

Welding area accommodate with


welding curtain but we still need fire
extinguisher in the area.

12 Make a proper Safety harness storage Open 28 July 2017

Need to proper store Safety harness to


minimized damage.
Internal Safety Inspection Report

13 Positive and
good findings

Good storage of small parts and need to


be more well organized.

14 There is an Positive and


exit lamp good findings
sign and Eye
wash
available and
fill with fresh
clean water
ready to go.
Need sign for
the Eye wash
station.
Internal Safety Inspection Report

15 Check with Environment for right SOP to Arsyad Tunru Open 14 July 2017
store and discharge Oil.

Oil storage not have special bunded


area.
16 Some of Electrical Check and Tag the equipment Febri Arwan Closed 1 July 2017
Portable and fixed accordingly
equipment did not
have Appliance
Test Tag.
Internal Safety Inspection Report

17 Positive and
good findings

Emergency Lights available in the office