SHILPA MEDICARE LTD, UNIT-IV

STANDARD OPERATING PROCEDURE


Document No.: SOP/ENG/PMT/038-00 Effective date :
Review date :
Supersedes : Nil
ENGINEERING Page 1 of 5
TITLE: Procedure for Preventive Maintenance of High shear mixer granulator

1.0 Purpose:

To lay down a Procedure for Preventive maintenance of High shear mixer granulator.

2.0 Scope:

This procedure applies to GEA Make High shear mixer granulator Installed at Shilpa
Medicare Limited, Unit-IV, Jadcherla.

3.0 Definitions: NA

4.0 Responsibility:

4.1 Asst. Manager/ Sr. Executive Engineering Shall co-ordinate with user dept to
make the equipment available for preventive maintenance purpose.

4.2 Executive/ Officer Engineering Shall perform Preventive maintenance activity.

4.3 Concern department shall ensure the cleanliness of the place.

4.4 Head of Engineering/Designee shall ensure its compliance.


5.0 Procedure:

5.1 Precautions:

5.1.1 Use Electrical hand gloves where ever necessary.

5.1.2 Follow electrical safety before starting the job. In case of electric shock
follow resuscitation first aid chart

5.1.3 Label the equipment with tag UNDER PREVENTIVE MAINTENANCE as


in Annexure ENG/GEN/003/A03.

5.2 Check the limit switches of the lid for safety and replace if not working properly.
5.3 Check all motors and gear box base bolts and tighten them if required.
5.4 Check the V belts for proper tension and alignment.
5.5 Check the pulley for its position on the shaft and tighten if required.
5.6 Check the earthling of the equipment.
5.7 Check all pneumatic interlocks.

Prepared by Reviewed by Approved by


Name
Designation

Sign & Date


QAD/OPC/001/F01-00
SHILPA MEDICARE LTD, UNIT-IV
STANDARD OPERATING PROCEDURE
Document No.: SOP/ENG/PMT/038-00 Effective date :
Review date :
Supersedes : Nil
ENGINEERING Page 2 of 5
TITLE: Procedure for Preventive Maintenance of High shear mixer granulator

5.8 Check the discharge cylinder condition and lubricate if required.


5.9 Replace the O rings if worn out.
5.10 Ensure the function of the purging.
5.16 Check the gearbox for any leakages and abnormal sound.
5.17 Check he oil level in gearbox and top up to 3/4th level if required.
5.18 Check and clean the solenoid valves.
5.19 Check the condition of all gaskets and replace if worn out.
5.20 Check the chopper gland and if required replace.
5.21 Clean the electrical panel using vacuum or air blower and tighten all electrical
connections.
5.22 Replace the discharge cylinder seal kit.
5.23 Replace the chopper bearings and seals.
5.24 Check the worm shaft & impeller shaft for any play or abnormal sound and
replace the bearings and seals if necessary.
5.25 Tighten all motor terminals and check the load current
5.26 Verify that Instrument calibration status is within its validity limit
6 Abbreviations:

6.1 SOP : Standard Operating Procedure.


6.2 PLC : Programmable Logic Controller
7 References:

7.1 SOP No. SOP/ENG/GEN/001: Electrical safety

7.2 SOP No. SOP/ENG/GEN/003: Preventive Maintanance

8 Annexure:

8.1 Annexure ENG/PMT/038/A01: Preventive


Maintenance Check sheet for High shear mixer
granulator

Prepared by Reviewed by Approved by


Name
Designation

Sign & Date


QAD/OPC/001/F01-00
SHILPA MEDICARE LTD, UNIT-IV
STANDARD OPERATING PROCEDURE
Document No.: SOP/ENG/PMT/038-00 Effective date :
Review date :
Supersedes : Nil
ENGINEERING Page 3 of 5
TITLE: Procedure for Preventive Maintenance of High shear mixer granulator

8.2

ANEXURE ENG/PMT/038/A01

Shilpa Medicare Limited, Unit-IV.


Jadcherla.

PREVENTIVE MAINTENANCE CHECKLIST FOR HIGH SHEAR MIXER GRANULATOR


(Ref. SOP No. - SOP/ENG/PMT/038)

Equipment Name :

Equipment No: Location:


Done
Users
Description FREQ By/ Remark
Sr.No. Sign
Date
Check the limit switches of the
1 lid for safety and replace if not QLY
working properly.

Check all motors and gear


2 box base bolts and tighten QLY
them if required.

Check the V belts for proper


3 QLY
tension and alignment.

Check the pulley for its


4 position on the shaft and QLY
tighten if required.

Check the earthling of the


5 QLY
equipment.

6 Clean the Air Vent polish Filter QLY

Check all pneumatic


7 HLF
interlocks.

Prepared by Reviewed by Approved by


Name
Designation

Sign & Date


QAD/OPC/001/F01-00
SHILPA MEDICARE LTD, UNIT-IV
STANDARD OPERATING PROCEDURE
Document No.: SOP/ENG/PMT/038-00 Effective date :
Review date :
Supersedes : Nil
ENGINEERING Page 4 of 5
TITLE: Procedure for Preventive Maintenance of High shear mixer granulator

Check the discharge cylinder


8 condition and lubricate if HLF
required.

Replace the O rings if worn


9 HLF
out.

Ensure the function of the


10 HLF
purging.

Check the gearbox for any


11 HLF
leakages and abnormal sound

Check he oil level in gearbox


12 and top up to 3/4th level if HLF
required.

Check and clean the solenoid


13 HLF
valves.

Check the condition of all


14 gaskets and replace if worn HLF
out.

Check the chopper gland and


15 HLF
if required replace.

Clean the electrical panel


using vacuum or air blower
16 YLY
and tighten all electrical
connections.

Replace the discharge


17 YLY
cylinder seal kit.

Replace the chopper bearings


18 YLY
and seals.

Prepared by Reviewed by Approved by


Name
Designation

Sign & Date


QAD/OPC/001/F01-00
SHILPA MEDICARE LTD, UNIT-IV
STANDARD OPERATING PROCEDURE
Document No.: SOP/ENG/PMT/038-00 Effective date :
Review date :
Supersedes : Nil
ENGINEERING Page 5 of 5
TITLE: Procedure for Preventive Maintenance of High shear mixer granulator

Check the worm shaft &


impeller shaft for any play or
19 abnormal sound and replace YLY
the bearings and seals if
necessary.

Tighten all motor terminals


20 YLY
and check the load current

Verify that Instrument


21 calibration status is within its YLY
validity limit

QLY: Quarterly HLF: Half Yearly

YLY: Yearly

End of the Document

Prepared by Reviewed by Approved by


Name
Designation

Sign & Date


QAD/OPC/001/F01-00