Vous êtes sur la page 1sur 2

What is the definition of work study?

3
What are the duties & responsibilities of IE officer? 7

What are the techniques of work study? 3


What is the basic procedure of work study? 4

What is the purpose & benefits of capacity study, production study & time study? 6
What is non-productive time? 1
Write down its categories? 3

What is the definition of method study? 2


Write down the objective & procedure of method study? 6

Write down the principle of motion study? 3


What is work measurement? 2
Write down the advantage & techniques of work measurement? 2+3

Write down the procedure of capacity study, production study& time study? 5
What is the difference between production & productivity? 2

Write down the Stitch types as per ISO? 2


What is the difference between chain & lock stitch? 2

What is the definition of SMV? 2


Write down the SMV related calculation? 5
What are the types of allowance? 2

Which factorys productivity & efficiency are high & why? 7

Say,
I. Factory 1 I. Factory 2
Produced 1000 Produced 1200
garments per day garments per day
with 50 operators with 65 operators

Note: Garments & Time are same for each factory.

How to improve the productivity? 2


What is the way to achieve high productivity? 2

What is SOP? 2
What are the steps of SOP? 5
Write down the name of garments wash? 2
Write down the major defects of a garments? 3
What is 4-point system? 1

What is Reactive & Disperse dyeing, Do discuss? 4


What is vatting? 1

Write down the following fabric construction? 3


i.2*2 Rib, ii.3*2 Plain weave, iii.Any types of Twill weave.
What is color fastness & properties of fastness? 1+2

Vous aimerez peut-être aussi