EXECUTION
BJ-PVD JV Co Ltd
LW-BLENDED CEMENT
PROCEDURE
PET R O IE T NA M
PV Drilling
BJ - PV Dril li ng J V
CEMENTING
EXECUTION
MATERIALS
1. Lot numbers of bulk cement and all additives must be recorded on the blend
sheet.
2. This batch number must coincide with that used in laboratory testing.
3. Additives must be of the same lot or batch number as used in laboratory tests.
4. Any substandard or suspect material (chunks, lumps, rocks, wet) is not to be
used.
PREPARATION
1. Air compressor and/or vacuum system must be checked for proper
operation and drained of any moisture.
2. Lot numbers of bulk cement and all additives to be used must be
recorded.
1. Maximum of three- complete pneumatic bulk plant transfers are required for
lightweight cement blends. It is imperative to minimize the amount of transfers
with LW-6 blends, as the lightweight particles segregate easily from the
heavier cement.
2. Percolating air through the blend WILL NOT be accepted as a replacement
method.
3. LW-6 Blend
These steps should be repeated until the required quantities have been cut and
blended.
Detailed blending procedure shall be fine tune based on actual of storage silo
available.
Precautions that should be taken to minimize the loss of LW-6 through the vent lines,
and to ensure a homogeneous blend, including:
Transfer air pressures should be regulated to between 20 psi while
loading the supply boat.
Transfer from the boat to the rig should be achieved with 25- 30 psi air
pressure (do not fluff the blend on the supply boat prior to transfer).
The rig silo should be pressurized to 20 psi from above and then raised
to 25 psi through the fluffing system (20 psi air pressure must
PET R O IE T NA M
PV Drilling
BJ - PV Dril li ng J V
CEMENTING
EXECUTION
SAMPLING
PET R O IE T NA M
PV Drilling
BJ - PV Dril li ng J V
CEMENTING
EXECUTION
PET R O IE T NA M
PV Drilling
BJ - PV Dril li ng J V