HERVE Training objectives & scope
BARON

To get familiar with how Oil & Gas facilities Projects are developed

To get familiar with how Oil & Gas facilities design is conducted

To get familiar with the work of each Engineering discipline

2015 Herv Baron


HERVE Training Agenda
BARON

Project development phases

Engineering: Organisation, Documents

Plant design overview

The engineering disciplines


o PROCESS
o PLANT LAYOUT
o EQUIPMENT
o SAFETY & ENVIRONMENT
o CIVIL
o PIPING
o PIPELINE

2015 Herv Baron


o INSTRUMENTATION
o ELECTRICAL
HERVE Training Agenda
BARON

Project development phases

Engineering: Organisation, Documents

Plant design overview

The engineering disciplines


o PROCESS
o PLANT LAYOUT
o EQUIPMENT
o SAFETY & ENVIRONMENT
o CIVIL
o PIPING
o PIPELINE

2015 Herv Baron


o INSTRUMENTATION
o ELECTRICAL
HERVE Project development phases
BARON

Step 1

Pre-Project/Conceptual

Objective: Define the


business opportunity, select
technology, estimate cost

Content: technical
assessment, develop process
design, milestone schedule,
cost estimate

Deliverables: Functional
requirements, Process
design, +/-30% cost

2015 Herv Baron


estimate, milestone
schedule

By: Company
HERVE Project development phases
BARON

Step 1 gate

Pre-Project/Conceptual

Objective: Define the


business opportunity, select
technology, estimate cost

Content: technical
assessment, develop process
design, milestone schedule,
cost estimate

Deliverables: Functional
requirements, Process
design, +/-30% cost

2015 Herv Baron


estimate, milestone
schedule

By: Company
HERVE Project development phases
BARON

Step 1 gate Step 2

Pre-Project/Conceptual Front End Engineering Design


(FEED)

Objective: Define the Objective: refine cost estimate,


business opportunity, select prepare EPC phase
technology, estimate cost

Content: technical Content: Develop Plant design


assessment, develop process (P&IDs, layout etc.)
design, milestone schedule,
cost estimate

Deliverables: Functional Deliverables: +/-10% cost


requirements, Process estimate, Technical exhibits of
design, +/-30% cost EPC Contract, Project schedule

2015 Herv Baron


estimate, milestone
schedule

By: Company By: Contractor


HERVE Project development phases
BARON

Step 1 gate Step 2 gate

Pre-Project/Conceptual Front End Engineering Design


(FEED)

Objective: Define the Objective: refine cost estimate,


business opportunity, select prepare EPC phase
technology, estimate cost

Content: technical Content: Develop Plant design


assessment, develop process (P&IDs, layout etc.)
design, milestone schedule,
cost estimate

Deliverables: Functional Deliverables: +/-10% cost


requirements, Process estimate, Technical exhibits of
design, +/-30% cost EPC Contract, Project schedule

2015 Herv Baron


estimate, milestone
schedule

By: Company By: Contractor


HERVE Project development phases
BARON

Step 1 gate Step 2 gate Step 3

Pre-Project/Conceptual Front End Engineering Design Project Execution (EPC)


(FEED)

Objective: Define the Objective: refine cost estimate, Objective: Delivery of the Plant
business opportunity, select prepare EPC phase ready for Start-Up
technology, estimate cost

Content: technical Content: Develop Plant design Content: Detail Engineering,


assessment, develop process (P&IDs, layout etc.) Procurement, Construction
design, milestone schedule,
cost estimate

Deliverables: Functional Deliverables: +/-10% cost Deliverables: Mechnically


requirements, Process estimate, Technical exhibits of completed Plant, ready for Start-
design, +/-30% cost EPC Contract, Project schedule Up

2015 Herv Baron


estimate, milestone
schedule

By: Company By: Contractor By: Contractor


HERVE Project development phases
BARON

Step 1 gate Step 2 gate Step 3

Pre-Project/Conceptual Front End Engineering Design Project Execution (EPC)


(FEED)

Objective: Define the Objective: refine cost estimate, Objective: Delivery of the Plant
business opportunity, select prepare EPC phase ready for Start-Up
technology, estimate cost

Content: technical Content: Develop Plant design Content: Detail Engineering,


assessment, develop process (P&IDs, layout etc.) Procurement, Construction
design, milestone schedule,
cost estimate

Deliverables: Functional Deliverables: +/-10% cost Deliverables: Mechnically


requirements, Process estimate, Technical exhibits of completed Plant, ready for Start-
design, +/-30% cost EPC Contract, Project schedule Up

2015 Herv Baron


estimate, milestone
schedule

By: Company By: Contractor By: Contractor


HERVE Project execution overall view
BARON

Design Procurement Manufacturing Shipping

Construction &
Installation Inspection & tests Hand-over
erection

2015 Herv Baron


HERVE Training Agenda
BARON

Project development phases

Engineering: Organisation, Documents

Plant design overview

The engineering disciplines

2015 Herv Baron


2015 Herv Baron
BARON
HERVE
2015 Herv Baron
BARON
HERVE
HERVE Engineering organisation
BARON

Engineering

Process

Safety

Equipment / Mechanical

Plant Layout

Piping

Civil

2015 Herv Baron


Instrumentation and Control
Electrical
HERVE Training Agenda
BARON

Project development phases: the role of Engineering

Engineering: Organisation, Documents

Plant design overview

The engineering disciplines

2015 Herv Baron


HERVE Engineering document register
BARON
Document number Document title Document
revision

A 1 48104 Service building instrument. rooms cables routing B

A 2 48102 Trouble shooting diagrams D

A 3 48134 F&G system architecture drawing E

A 4 50100 Instrument index B

A 7 50003 Spec for instrument installation works and service C

A 8 50960 Instrument Data sheets for temperature switches B

A 9 50110 Requisition for pressure relief valves B

M 1 62059 General plot plan B

M 2 62020 Piping details standard C

M 2 62070 Piping general arrangement Area 1 D

M 4 60100 Special items list D

M 5 62250 Piping isometrics booklet C

M 6 60000 Pipes and fittings thickness calculation A

M 6 62351 Calculation note CN1 - piping stress analysis A

M 7 60001 General piping specification C

2015 Herv Baron


M 8 60103 Data sheets for station piping material B

M 9 60200 Requisition for pipes F


HERVE Engineering document codification
BARON
Discipline code
A Instrumentation & Control
C Civil engineering
Document number Document title Document
revision Revision index E Electrical
Serial number
G Project general documents
A 1 48104 Service building instrument. rooms cables routing B J Mechanical
A 2 48102 Trouble shooting diagrams D K Safety
A 3 48134 F&G system architecture drawing E M Piping & Layout

A 4 50100 Instrument index B


P Processes
S Steel Structures
A 7 50003 Spec for instrument installation works and service C
V Vessels Heat exchangers
A 8 50960 Instrument Data sheets for temperature switches B
W Materials Welding
A 9 50110 Requisition for pressure relief valves B

M 1 62059 General plot plan B


Document type
M 2 62020 Piping details standard C
1 Installation drawings
M 2 62070 Piping general arrangement Area 1 D
2 Detail drawings
M 4 60100 Special items list D
3 Diagrams
M 5 62250 Piping isometrics booklet C
4 Lists Bill of Quantities
M 6 60000 Pipes and fittings thickness calculation A 5 Isometrics

2015 Herv Baron


M 6 62351 Calculation note CN1 - piping stress analysis A 6 Calculation notes
M 7 60001 General piping specification C 7 Specifications
M 8 60103 Data sheets for station piping material B 8 Data sheets

M 9 60200 Requisition for pipes F


9 Requisitions
HERVE The common engineering deliverables
BARON

2015 Herv Baron


HERVE Training Agenda
BARON

Project development phases: the role of Engineering

Engineering: Organisation, Documents

Plant design overview

The engineering disciplines

2015 Herv Baron


HERVE Plant Design
BARON

Business case

2015 Herv Baron


HERVE Plant Design
BARON

Business case

Process
Simulations
PFD,
HMB

2015 Herv Baron


HERVE Process Design, PFD, HMB
BARON

2015 Herv Baron


HERVE Plant Design
BARON

Business case

Process
Simulations
Process
PFD,
Equipment
HMB
sizing /
specification

2015 Herv Baron


HERVE Process Equipment sizing & Data Sheet
BARON

2015 Herv Baron


HERVE Process Equipment sizing & Data Sheet
BARON

2015 Herv Baron


HERVE Plant Design
BARON

Business case

Process
Simulations
Process
PFD,
Equipment
HMB
sizing /
specification Equipment design by
vendors

2015 Herv Baron


HERVE Plant Design
BARON

Business case

Process
Simulations
Process
PFD,
Equipment
HMB
sizing /
specification Equipment design by
vendors

2015 Herv Baron


Fluids composition Material selection and
& conditions specifications
HERVE Plant Design
BARON

Business case

Process
Simulations
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by
vendors

2015 Herv Baron


Fluids composition Material selection and
& conditions specifications
HERVE Plant Design
BARON

2015 Herv Baron


HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process
Simulations
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by
vendors

2015 Herv Baron


Fluids composition Material selection and
& conditions specifications
HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process Electrical power


Simulations generation & distribution
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by
vendors

2015 Herv Baron


Fluids composition Material selection and
& conditions specifications
HERVE Electrical design
BARON

2015 Herv Baron


HERVE Electrical design
BARON

2015 Herv Baron


HERVE Electrical design
BARON

Turbogenerator

Switchgear

Transformer

2015 Herv Baron


HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process Electrical power


Simulations generation & distribution
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by Civil design
vendors

2015 Herv Baron


Fluids composition Material selection and
& conditions specifications
HERVE Civil Foundation Drawings
BARON

2015 Herv Baron


HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process Electrical power


Simulations generation & distribution
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by Civil design
vendors

2015 Herv Baron


Fluids composition Material selection and
& conditions specifications
HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process Electrical power


Simulations generation & distribution
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by Civil design
vendors

P&IDs

2015 Herv Baron


Fluids composition Material selection and
& conditions specifications
HERVE P&ID
BARON

Compare the
information shown on

2015 Herv Baron


the PFD and the P&ID
HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process Electrical power


Simulations generation & distribution
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by Civil design
vendors

Piping Routing
P&IDs

2015 Herv Baron


Fluids composition Material selection and
& conditions specifications
HERVE Piping isometric drawing
BARON

2015 Herv Baron


HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process
Simulations
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by Civil design
vendors

Piping Routing
P&IDs
Instrumentation &

2015 Herv Baron


Control design

Fluids composition Material selection and


& conditions specifications
HERVE Instrumentation design
BARON

2015 Herv Baron


HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process
Simulations
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by Civil design
vendors

Structural steel
Piping Routing
design
P&IDs
Instrumentation &

2015 Herv Baron


Control design

Fluids composition Material selection and


& conditions specifications
HERVE Structural steel design
BARON

2015 Herv Baron


HERVE Structural steel design drawings
BARON

2015 Herv Baron


HERVE Plant Design
BARON
Utility Units Design
Business case
Utility consumption

Process
Simulations
Process Plant Layout
PFD,
Equipment
HMB
sizing /
specification Equipment design by Civil design
vendors

Structural steel
Piping Routing
design
P&IDs
Instrumentation &

2015 Herv Baron


Control design

Fluids composition Material selection and


& conditions specifications
HERVE Training Agenda
BARON

Project development phases

Engineering: Organisation, Documents

Plant design overview

The engineering disciplines


o PROCESS
o PLANT LAYOUT
o EQUIPMENT
o SAFETY & ENVIRONMENT
o CIVIL
o PIPING
o PIPELINE

2015 Herv Baron


o INSTRUMENTATION
o ELECTRICAL