TABLE OF CONTENTS
5 Sub-Contractor 3
6 Tools & Equipment 3
7 Prior Activities 3
8 Safety 4
8.1 Emergency Procedure 6
9 Responsibilities 7
10 Documentation and Reporting 8
11 Post Work Operation 8
12 Attachments 8
Procedure title :
Manual Excavation to Locate Existing
Services Page 5 of 12
13 Distribution 9
Procedure title :
Manual Excavation to Locate Existing
Services Page 6 of 12
Procedure title :
Manual Excavation to Locate Existing
Services Page 7 of 12
1.0 Scope:
1.1 This Method Statement covers the various steps involved in general excavation.
2.0 References:
a) Contract Specifications
b) Approved Construction Drawings
3.0 Definitions:
MS : Method Statement
Procedure title :
Manual Excavation to Locate Existing
Services Page 8 of 12
e) Provision of all PPE will be distributed to all the workforce and strict
adherence with safety and wearing the PPE at all times will be monitored and
evaluated at all times.
b) All waste will be bagged, removed from site and disposed of in accordance
with the Environmental Management Plan.
12.0 Attachments:-
1. ITP (to be submitted for Engineers review and approval) work shall
commence only after obtaining the Engineers approval.
2. Quality Control Inspection Checklist (to be submitted for Engineers
review and approval) work shall commence only after obtaining the
Engineers approval
Procedure title :
Manual Excavation to Locate Existing
Services Page 10 of 12
Procedure title :
Manual Excavation to Locate Existing
Services Page 11 of 12
Procedure title :
Manual Excavation to Locate Existing
Services Page 12 of 12