CALCULATION SHEET
FOR
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd.
And its use is conditioned upon the users agreement not to reproduce the document in whole or in part. Nor the material described
thereon nor to use the document for any purpose other than specifically permitted in writing by Samsung Engineering Co., Ltd.
_______________________________________________________________________________________________________________
Samsung Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 2 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
TABLE OF CONTENTS
_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 3 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1. DESIGN CRITERIA
1) Wind Load
- The detail Calculation procedure of wind load is shown on "APPENDIX-I"
- W = Wind Load (In accordance with UBC-97)
_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 4 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 5 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
Normal
Design Load Erection Test Maintenance Empty
Operation
DL 1.0 1.0 1.0 1.0 1.0
LL 1.0 1.0 1.0 1.0
EF 1.0 1.0
EE 1.0
ET 1.0
EO 1.0
TL 1.0
SL
WL 1.0 (*) 0.5 1.0 (*) 0.33 1.0 (*)
EL 1.0 (*) 1.0 (*) 1.0 (*)
ML 1.0
IL 1.0
VL
HL
FL
(*) Wind loads or Earthquake load whichever is greater
_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 6 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1) Reinforcing Bars
(ref. 8015-0151-SECL-00-000-CI-SP-00003, Provision 4.1.2)
Deformed reinforcing steel bar (ASTM A 615) : fy = 420 MPa (Grade 60)
fc = 25 MPa
_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 7 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1) Overturning
-All case S.F = 1.5
2) Sliding
-All case S.F = 1.5
3) Buoyancy
-All case S.F = 1.2
_____________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 8 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1.10
0.80
5.00
1.20
0.30
(Hp)
1.00
0.80
1.80
0.70
(Hs)
(Ht)
1.10
0.80
(Hf)
SECTION PLAN
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 9 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 10 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 11 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1) Dead Load, DL
Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
- - 38.72 - -
2) Wind Load, WL
Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
56.40 - - - 735.80
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 12 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
- 98.32 - 1282.68 -
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 13 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1) Terzaghi Method
Qult = 1.3 x c x Nc + x Df x Nq + 0.4 x x B x Nr
kpr c Nc Nq Nr r
10 14.7 35 9.6 2.7 - 8
2) Reaction
2 x V
q(MAX) = Mu
LxX
2.000 x 870.552
=
5.00 x 2.80
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 14 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1) Bottom Slab
X - Direction Y - Direction
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 15 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
X - Direction Y - Direction
Strength Design
THK. Appied
Section Direction
(m) Vu Mu Location
( kN) ( kN-m )
49.29 Bottom bar
X - Direction 144.55
Mw at Top -50.71 Top bar
0.80
of Pedestal 79.86 Bottom bar
Y - Direction 29.28
-72.45 Top bar
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 16 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
2) Re-bar Design
2ea- L-150x12
- T = Mu / (2 x Aleg x D) - Vu/4
(3) Calculation As
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 17 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
- Rebar Design (ref. ACI-318M-08, Provision 7.12.2, 9.3, 10.3 & 10.5)
- Bottom bar
6
Mu 49.29 x 10
Required Rn = = 2
= 0.11177 N/mm
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 1 - 2 X 0.11177
= 1- 1- = 1- = 0.000267
fy 0.85 f'c 420 0.85 X 25
Selected As = 720 mm
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 18 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
- Top bar
6
Mu 50.71 x 10
Required Rn = = 2
= 0.11499 N/mm2
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 2 X 0.11499
= 1- 1- = 1- 1- = 0.000275
fy 0.85 f'c 420 0.85 X 25
Selected As = 720 mm
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 19 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
- Bottom bar
6
Mu 79.86 x 10
Required Rn = = 2
= 0.18109 N/mm
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 1 - 2 X 0.18109
= 1- 1- = 1- = 0.000433
fy 0.85 f'c 420 0.85 X 25
Selected As = 720 mm
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 20 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
- Top bar
6
Mu 72.45 x 10
Required Rn = = 2
= 0.16429 N/mm2
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 2 X 0.16429
= 1- 1- = 1- 1- = 0.000393
fy 0.85 f'c 420 0.85 X 25
Selected As = 720 mm
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 21 of 35
DOC. TITLE CALCULATION SHEET FOR 132kv Gantry CPF & Cluster
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
D 16 @ 150 D 16 @ 150
SECTION
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 22 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1.10
0.80
5.00
1.20
0.30
(Hp)
1.00
0.80
1.80
0.70
(Hs)
(Ht)
1.10
0.80
(Hf)
SECTION PLAN
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 23 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 24 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 25 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1) Dead Load, DL
Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
- - 38.72 - -
2) Wind Load, WL
Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
56.40 - - - 735.80
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 26 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
Appied Load
Fx Fy Fz Mx My
SUPPORT
(kN) (kN) (kN) (kN.m) (kN.m)
- 98.32 - 1282.68 -
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 27 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1) Terzaghi Method
Qult = 1.3 x c x Nc + x Df x Nq + 0.4 x x B x Nr
kpr c Nc Nq Nr r
5 12.2 35 7.3 1.6 - 18
2) Reaction
2 x V
q(MAX) = Mu
LxX
2.000 x 870.552
=
5.00 x 2.80
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 28 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
1) Bottom Slab
X - Direction Y - Direction
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 29 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
X - Direction Y - Direction
Strength Design
THK. Appied
Section Direction
(m) Vu Mu Location
( kN) ( kN-m )
49.29 Bottom bar
X - Direction 144.55
Mw at Top -50.71 Top bar
0.80
of Pedestal 79.86 Bottom bar
Y - Direction 29.28
-72.45 Top bar
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 30 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
2) Re-bar Design
2ea- L-150x12
- T = Mu / (2 x Aleg x D) - Vu/4
(3) Calculation As
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 31 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
- Rebar Design (ref. ACI-318M-08, Provision 7.12.2, 9.3, 10.3 & 10.5)
- Bottom bar
6
Mu 49.29 x 10
Required Rn = = 2
= 0.11177 N/mm
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 1 - 2 X 0.11177
= 1- 1- = 1- = 0.000267
fy 0.85 f'c 420 0.85 X 25
Selected As = 720 mm
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 32 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
- Top bar
6
Mu 50.71 x 10
Required Rn = = 2
= 0.11499 N/mm2
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 2 X 0.11499
= 1- 1- = 1- 1- = 0.000275
fy 0.85 f'c 420 0.85 X 25
Selected As = 720 mm
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 33 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
- Bottom bar
6
Mu 79.86 x 10
Required Rn = = 2
= 0.18109 N/mm
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 1 - 2 X 0.18109
= 1- 1- = 1- = 0.000433
fy 0.85 f'c 420 0.85 X 25
Selected As = 720 mm
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 34 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
- Top bar
6
Mu 72.45 x 10
Required Rn = = 2
= 0.16429 N/mm2
bd 0.90 x 1,000 x 700
0.85 f'c 2 X Rn 0.85 X 25 2 X 0.16429
= 1- 1- = 1- 1- = 0.000393
fy 0.85 f'c 420 0.85 X 25
Selected As = 720 mm
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd
West Qurna Field 2nd
Phase Project
Page 35 of 35
DOC. TITLE 0
Rev 0
DOC. NO. 8015-0151-82-PO-45-0009-9784-S03-12054 Job No. SO2476
D 16 @ 150 D 16 @ 150
SECTION
_________________________________________________________________________________________________________Samsung
Engineering Co., Ltd