213 ft (65m)
24'-7"
10,580 lbs
59'-1" (18m)
7.5m
4 800 kg
197 ft (60m)
14,550 lbs
6 600 kg
8'-10"
2.7m
180 ft (55m)
18,520 lbs
8 400 kg
164 ft (50m)
23,150 lbs
10 500 kg
148 ft (45m)
7 x 19'-0" (5.8m) = 133'-2" (40.6m)
26,460 lbs
12 000 kg
129 ft (39.4m)
31,085 lbs
174'-10" (53.3m)
14 100 kg
113 ft (34.4m)
38,140 lbs
17 300 kg
550 HC long section
38'-1" (11.6m)
96 ft (29.4m)
48,060 lbs
21 800 kg
500 HC-L or 540 HC-L base
40'-9" (12.42m)
Contact Morrow
for undercarriage
information.
32'-10"
Configuration III 10 m
with 550 HC Tower on Rail-mounted Undercarriage
500 HC-L or 540 HC-L Base 32'-10" (10 m) Gauge
Stationary Travelling
MEC-MKT-1316
02/10/17
1
540 HC-L 12
33' 16' 0' 16' 33' 49' 66' 82' 98' 115' 131' 148' 164' 180' 197' 213' Grid: 1 meter x 1 meter Centerline of
10m 5m 0m 5m 10m 15m 20m 25m 30m 35m 40m 45m 50m 55m 60m 65m
machine deck Boom
230' (70m)
Boom Tip Radius
NOTE: Minimum hook reach: 13'-1" (4m).
Length @ 70
213' (65m)
213 ft 65m 86 ft 26.1m
197 ft 60m 80 ft 24.3m
180 ft 55m 74 ft 22.5m 197' (60m)
164 ft 50m 69 ft 20.7m
148 ft 45m 63 ft 19m 180' (55m)
129 ft 39.4m 57 ft 17.2m
113 ft 34.4m 51 ft 15.4m 164' (50m)
96 ft 29.4m 45 ft 13.7m Machine
NOTE: Out of operation boom deck
position varies with crane 148' (45m)
configuration.
Structure
131' (40m)
12'-3" 8'-10"
3.75m 2.7m
115' (35m)
CLEARANCE
98' (30m)
REQUIREMENTS
82' (25m)
Plan View
NOTE: Allow for clearance between
66' (20m) crane machine deck and any adjacent
structure when climbing crane up or
down. Above view illustrates minimum
49' (15m)
crane-to-structure clearances for both
89
sides of machine deck.
33' (10m)
45.9 ft
14m
41.7 ft
12.7m
Boom
37.1 ft
11.3m
32.8 ft
10m
16' (5m)
27.9 ft
8.5m
7.3m
24 ft
19.7 ft
14.8 ft
6m
15
4.5m
0' (0m)
Machine
deck
8 ft
2.45m
outside to 24'-7"
outside
7 x 19'-0" (5.8m) = 133'-2" (40.6m) maximum
7.5m
8 x 19'-0" (5.8m) = 152'-3" (46.4m) maximum
8 x 19'-0" (5.8m) = 152'-3" (46.4m) maximum
for 55m, 60m and 65m booms ONLY!
TAIL SWING
for 30m, 35m, 40m, 45m and 50m booms ONLY!
8 x 19'-0" (5.8m) = 152'-3" (46.4m) maximum
for 40m, 45m, 50m, 55m, 60m and 65m booms ONLY!
5.8m
19 ft
RADIUS
550 HC standard tower sections
11'-0" x 11'-0"
Top climbing unit 3.35m x 3.35m
(lowered)
SLAB OPENING
40'-9" (12.42m)
40'-9" (12.42m)
540 HC-L or
Configuration I Recommended
NOTE: Recommended slab opening
for erection and dismantlement. For
other factors including tower deflec-
tion, contact Morrow engineering.
Configuration II Configuration III
MEC-MKT-1316
02/10/17
2
540 HC-L 12
7'-3" o.c.
2.2m o.c.
2.2m o.c.
7'-3" o.c.
.c.
.c.
.c.
"o
"o
"o
.
'-3
'-3
'-3
.
.
o.c
o.c
o.c
10
10
10
1m
1m
1m
3.1
3.1
3.1
with 550 HC or 500 HC-L with 630 EC-H with 500 HC-L
Tower Section Base Section or 540 HC-L Base Section
Tower Heights
Configuration I Configuration II Configuration III
Tower Base Std. 550 HC 630 EC-H 500 HC-L or 12'-3" (8'-10") *
12'-3" (8'-10") *
Components or 500 HC-L Base Section 540 HC-L
3.75m (2.7m) 3.75m (2.7m)
Tower Section Base
Section
12'-3" (8'-10") *
3.75m (2.7m) 12.42m
12.42m
40'-8"
40'-8"
19'-0"
5.8m
0.28m
0.28m
0.4m
1'-4"
11"
11"
MEC-MKT-1316
02/10/17
3
540 HC-L 12
Capacity
26,460 lbs/12 000 kg *Minimum hook reach. 26,460 lbs (12 000 kg) 1-PART OPERATION
23,150 lbs
24,250 lbs/11 000 kg 10 500 kg
0
Hook Radius in ft 0 13 20 30 40 50 60 70 80 90 98 115 131 148 164 180 197 213
in meters 0 4 6.1 9.1 12.2 15.2 18.3 21.3 24.4 27.4 30 35 40 45 50 55 60 65
MEC-MKT-1316
02/10/17
4
540 HC-L 12
Capacity
0
Hook Radius in ft 0 13 20 30 40 50 60 70 80 90 97 113 129 146 162 179 195
in meters 0 4 6.1 9.1 12.2 15.2 18.3 21.3 24.4 27.4 29.4 34.4 39.4 44.4 49.4 54.4 59.4
MEC-MKT-1316
02/10/17
5
540 HC-L 12
Tie-in Configurations
IMPORTANT: Please consult crane operation manual before
erecting, operating, climbing, servicing and dismantling. * Lower the top climbing unit to
the uppermost tie-in prior to
operating crane at maximum
tower configuration.
C * Hydraulic Top
Climbing Unit
[Site conditions
Tie-In
Centerline dependent] Assembly
of tower
E B
[Site conditions
dependent]
* Hydraulic Top
Climbing Unit
1st Tie-In
Assembly
Tie-In Tie-in
Assembly Tie-in struts (3)
collar Connection plates
8'-10" (2.7m) min by contractor
D TIE-IN ASSEMBLY
A
Plan View
NOTE: The tie-in assembly shown is an example of a Base of
Base of typical installation. Please note, however, that factors Crane
Crane
determining the installation of tie-in assemblies may
vary due to project specific conditions. Please contact
TOP CLIMBING Morrow for information regarding dimensions, reaction TOP CLIMBING
with 550 HC Tower Sections forces and tie-in locations. with 550 HC Tower Sections
Tied to structure with 1 tie-in Tied to structure with 2 tie-ins
Above uppermost tie-in (E) 6 max 3 min 7 max 3 min 8 max 3 min
Base to 1st tie-in assembly (D) 7 max 4 min 8 max 4 min 9 max 4 min
Above uppermost tie-in (C) 5 max 3 min 6 max 3 min 7 max 3 min
Between tie-in assemblies (B) 6 max 4 min 7 max 4 min 8 max 4 min
Base to 1st tie-in assembly (A) 7 max 4 min 8 max 4 min 9 max 4 min
NOTE: Data above applies only to 540 HC-L 12 configurations with 550 HC tower. Contact Morrow for information regarding alternate tower configurations.
MEC-MKT-1316
02/10/17
6
540 HC-L 12
NOTE: Capacities and hook speeds indicated will vary depending on the amount of hoist rope installed. This crane model may be equipped with a hoist unit other than that
specified in the data above. To verify, check the serial number of the crane and refer to the Liebherr 540 HC-L 12 Litronic Operation Manual for additional information.
Motor Information
Drive Unit Horsepower Kilowatts Speed
Luffing (Variable Frequency Drive) 147 hp 110 kW 1.9 min
Counterweights
Boom Length 213' 164' (65m 50m) 148' 131' (45m 40m) 115' 98' (35m 30m)
Power Requirements
Power supply: 3-phase 480 V, 60 Hz; 3-wire plus ground; no Neutral.
480 V phase-phase, 277 V each phase to ground with 120 phase shift between phases.
Service size: 400 Amperes
NOTES:
1. For electric power provided by an electric utility, do not use open Delta transformers.
2. For electric power provided by a generator, the minimum generator size required is 1200 kW. Verify the generator provided is suitable for use with variable frequency drives (VFDs).
A properly sized generator is critical to the safe operation of the crane.
MEC-MKT-1316
02/10/17
7
540 HC-L 12
Component List
Connection Plates (2) H 10-10 x 2-0 x 3-7 3,415 lbs Boom Section H 12-8 x 6-3 x 6-3 2,315 lbs
(each) L W 3.3m x 0.6m x 1.1m 1 550 kg 612 L W
3.85m x 1.9m x 1.9m 1 050 kg
Slewing Platform 1 H 9-10 x 7-5 x 8-4 23,810 lbs Boom Section H 34-9 x 6-3 x 6-11 5,730 lbs
plus swing motors L W
3m x 2.25m x 2.53m 10 800 kg 621 L W
10.6m x 1.9m x 2.1m 2 600 kg
Machine Deck H 22-2 x 7-3 x 8-4 20,280 lbs Boom Section H 34-9 x 6-3 x 6-3 5,070 lbs
with electrical panels L
6.75m x 2.22m x 2.53m 9 200 kg 631 L W 10.6m x 1.9m x 1.9m 2 300 kg
W
Hoist Gear (VFD) 2 H 12-10 x 7-6 x 6-7 12,680 lbs Boom Section H 18-0 x 6-3 x 6-11 2,755 lbs
147 hp (110 kW) L W
3.9m x 2.28m x 2m 5 750 kg 622 L W 5.5m x 1.9m x 2.1m 1 250 kg
Luffing Gear (VFD) 2 H 10-2 x 7-7 x 5-3 9,920 lbs Tip Section H
37-9 x 6-7 x 8-4 7,275 lbs
147 hp (110 kW) L
3.1m x 2.32m x 1.6m 4 500 kg 641 L W
11.5m x 2.0m x 2.55m 3 300 kg
W
Operators Cab H 19-8 x 7-3 x 8-5 4,410 lbs Top Climbing Unit 4 H 41-4 x 9-8 x 5-9 17,415 lbs
with access platform L W
6m x 2.2m x 2.57m 2 000 kg Panels (2) L W 12.6m x 2.95m x 1.75m 7 900 kg
Platforms (2) H 21-4 x 3-11 x 3-3 1,170 lbs Top Climbing Unit 4 6,835 lbs
(each) L W 6.5m x 1.2m x 1m 530 kg Hydraulics 3 100 kg
Gantry 3 H 39-4 x 7-6 x 8-5 22,270 lbs Boom Assembly Part 1 5 78-5 x 6-5 x 6-11 18,740 lbs
(complete) L W 12m x 2.28m x 2.56m 10 100 kg for 213-ft 148-ft booms 23.9m x 1.96m x 2.1m 8 500 kg
Auxiliary Crane H 14-5 x 2-11 x 2-0 1,545 lbs Boom Assembly Part 2 6 139-7 x 6-7 x 8-4 25,575 lbs
with Support 4.4m x 0.9m x 0.6m 700 kg for 213-ft (65.0m) boom 42.6m x 2m x 2.55m 11 600 kg
L W
Base Section H 40-9 x 8-8 x 8-8 31,010 lbs Boom Assembly Part 2 6 122-7 x 6-7 x 8-4 22,710 lbs
630 EC-H 12.42m x 2.65m x 2.65m 14 065 kg for 197-ft (60.0m) boom
37.4m x 2m x 2.55m 10 300 kg
L W
Base Section H 40-9 x 8-10 x 8-10 37,855 lbs Boom Assembly Part 2 6 105-8 x 6-7 x 8-4 19,840 lbs
500 HC-L 12.42m x 2.68m x 2.68m 17 170 kg for 180-ft (55.0m) boom
32.2m x 2m x 2.55m 9 000 kg
L W
Base Section H 40-9 x 8-10 x 8-10 31,880 lbs Boom Assembly Part 2 6 88-8 x 6-7 x 8-4 16,975 lbs
540 HC-L 12.42m x 2.68m x 2.68m 14 460 kg for 164-ft (50.0m) boom
27m x 2m x 2.55m 7 700 kg
L W
Std Tower Section H 20-7 x 8-0 x 8-0 14,285 lbs Boom Assembly Part 2 6 71-8 x 6-7 x 8-4 14,110 lbs
550 HC 6.28m x 2.45m x 2.45m 6 480 kg for 148-ft (45.0m) boom 21.8m x 2m x 2.55m 6 400 kg
L W
Long Section 39'-8 x 8-0 x 8-0 23,480 lbs Boom Assembly Complete 7 132-5 x 6-7 x 8-4 29,540 lbs
550 HC 12.1m x 2.45m x 2.45m 10 650 kg 131-ft (40.0m) boom
40.4m x 2m x 2.55m 13 400 kg
Tower Section H 20-7 x 8-0 x 8-0 17,900 lbs Boom Assembly Complete 7 115-5 x 6-7 x 8-4 26,675 lbs
500 HC-L 6.28m x 2.45m x 2.45m 8 120 kg 115-ft (35.0m) boom
35.2m x 2m x 2.55m 12 100 kg
L W
Hook Block H 7-10 x 3-11 x 2-9 3,415 lbs Boom Assembly Complete 7 98-5 x 6-7 x 8-4 22,930 lbs
2.4m x 1.2m x 0.85m 1 550 kg 98-ft (30.0m) boom
30.0m x 2m x 2.55m 10 400 kg
L W
Luffing Rope Sheave Block H 4-11 x 3-11 x 3-7 1,325 lbs Counterweight (11) H 14-9 x 2-11 x 0-8 10,825 lbs
L W
1.5m x 1.2m x 1.1m 600 kg Steel (each) L W
4.5m x 0.9m x 0.2m 4 910 kg
NOTE: Weights and dimensions are approximate. Scale components before lifting. Consult operation manual before erecting, operating, servicing and dismantling crane.
1
Slewing platform can be split into two parts: Part A at 18,960 lbs (8 600 kg) and Part B at 4,850 lbs (2 200 kg).
2
Does not include wire rope. To calculate wire rope weight: 2.37 lb/ft (3.53 kg/m). Luffing and hoisting rope is 27mm dia.
3
Gantry (boom retaining frame) can be split in three parts: Part A at 9,920 lbs (4 500 kg), Part B at 5,510 lbs (2 500 kg) and Part C at 6,835 lbs (3 100 kg).
4
Top climbing unit complete includes front panel, rear panel, hydraulic system, ladders and platforms with a total weight of 24,250 lbs (11 000 kg).
5
Boom assembly Part 1 includes boom sections #1, #2 and #3 and erection wire rope.
6
Boom assembly Part 2 includes boom sections and pendent bars.
7
Complete boom assemblies can be split into two parts.