Vous êtes sur la page 1sur 8

540 HC-L 12

Luffing Boom Tower Crane

213 ft (65m)
24'-7"
10,580 lbs
59'-1" (18m)

7.5m
4 800 kg

197 ft (60m)
14,550 lbs
6 600 kg
8'-10"
2.7m

180 ft (55m)
18,520 lbs
8 400 kg

164 ft (50m)
23,150 lbs
10 500 kg

148 ft (45m)
7 x 19'-0" (5.8m) = 133'-2" (40.6m)

550 HC std. tower sections

26,460 lbs
12 000 kg

129 ft (39.4m)
31,085 lbs
174'-10" (53.3m)

14 100 kg

113 ft (34.4m)
38,140 lbs
17 300 kg
550 HC long section
38'-1" (11.6m)

96 ft (29.4m)
48,060 lbs
21 800 kg
500 HC-L or 540 HC-L base
40'-9" (12.42m)

Contact Morrow
for undercarriage
information.

32'-10"
Configuration III 10 m
with 550 HC Tower on Rail-mounted Undercarriage
500 HC-L or 540 HC-L Base 32'-10" (10 m) Gauge

Stationary Travelling

MEC-MKT-1316
02/10/17

1
540 HC-L 12

33' 16' 0' 16' 33' 49' 66' 82' 98' 115' 131' 148' 164' 180' 197' 213' Grid: 1 meter x 1 meter Centerline of
10m 5m 0m 5m 10m 15m 20m 25m 30m 35m 40m 45m 50m 55m 60m 65m
machine deck Boom
230' (70m)
Boom Tip Radius
NOTE: Minimum hook reach: 13'-1" (4m).
Length @ 70
213' (65m)
213 ft 65m 86 ft 26.1m
197 ft 60m 80 ft 24.3m
180 ft 55m 74 ft 22.5m 197' (60m)
164 ft 50m 69 ft 20.7m
148 ft 45m 63 ft 19m 180' (55m)
129 ft 39.4m 57 ft 17.2m
113 ft 34.4m 51 ft 15.4m 164' (50m)
96 ft 29.4m 45 ft 13.7m Machine
NOTE: Out of operation boom deck
position varies with crane 148' (45m)
configuration.
Structure
131' (40m)
12'-3" 8'-10"
3.75m 2.7m
115' (35m)

CLEARANCE
98' (30m)
REQUIREMENTS
82' (25m)
Plan View
NOTE: Allow for clearance between
66' (20m) crane machine deck and any adjacent
structure when climbing crane up or
down. Above view illustrates minimum
49' (15m)
crane-to-structure clearances for both
89
sides of machine deck.
33' (10m)
45.9 ft
14m
41.7 ft
12.7m

Boom
37.1 ft
11.3m
32.8 ft
10m

16' (5m)
27.9 ft
8.5m
7.3m
24 ft
19.7 ft
14.8 ft

6m

15
4.5m

0' (0m)
Machine
deck
8 ft
2.45m
outside to 24'-7"
outside
7 x 19'-0" (5.8m) = 133'-2" (40.6m) maximum

7.5m
8 x 19'-0" (5.8m) = 152'-3" (46.4m) maximum
8 x 19'-0" (5.8m) = 152'-3" (46.4m) maximum
for 55m, 60m and 65m booms ONLY!

TAIL SWING
for 30m, 35m, 40m, 45m and 50m booms ONLY!
8 x 19'-0" (5.8m) = 152'-3" (46.4m) maximum

for 40m, 45m, 50m, 55m, 60m and 65m booms ONLY!
5.8m
19 ft

7 x 19'-0" (5.8m) = 133'-2" (40.6m) maximum


7 x 19'-0" (5.8m) = 133'-2" (40.6m) maximum

RADIUS
550 HC standard tower sections

550 HC standard tower sections

for 30m and 35m booms ONLY!


for 30m and 35m booms ONLY!
6 x 19'-0" (5.8m) = 114'-2" (34.8m) maximum

for 40m, 45m and 50m booms ONLY!

PLAN VIEW showing tail swing


550 HC std. tower sections

radius for crane configuration using


5 x 19'-0" (5.8m) = 95'-2" (29m) maximum

for 55m and 60m booms ONLY!

steel ballast blocks. Please consult


Morrow for additional information.
for 65m boom ONLY!

11'-0" x 11'-0"
Top climbing unit 3.35m x 3.35m
(lowered)

SLAB OPENING
40'-9" (12.42m)
40'-9" (12.42m)

500 HC-L base


630 EC-H base

540 HC-L or

Configuration I Recommended
NOTE: Recommended slab opening
for erection and dismantlement. For
other factors including tower deflec-
tion, contact Morrow engineering.
Configuration II Configuration III

MEC-MKT-1316
02/10/17

2
540 HC-L 12

Foundation Details on concrete footing


8'-0" (2.45m) 8'-0" (2.45m) 8'-0" (2.45m)
outside to outside outside to outside outside to outside
550 HC or 500 HC-L 500 HC-L or 550 HC 500 HC-L or 550 HC
tower section tower section tower section

550 HC or 500 HC-L 630 EC-H 500 HC-L or 540 HC-L


tower section base section base section
Reinforcing Reinforcing Reinforcing
Pin connection steel each way Bolt connection steel each way Bolt connection steel each way

Foundation Foundation Foundation


anchors (4) 7'-3" o.c. anchors (4) 7'-3" o.c. anchors (4) 7'-3" o.c.
2.2m o.c. 2.2m o.c. 2.2m o.c.
Reinforcing Reinforcing Reinforcing
steel each way steel each way steel each way
2.2m o.c.
7'-3" o.c.

7'-3" o.c.
2.2m o.c.
2.2m o.c.
7'-3" o.c.
.c.

.c.

.c.
"o

"o

"o
.
'-3

'-3

'-3
.

.
o.c

o.c

o.c
10

10

10
1m

1m

1m
3.1

3.1

3.1
with 550 HC or 500 HC-L with 630 EC-H with 500 HC-L
Tower Section Base Section or 540 HC-L Base Section

Tower Heights
Configuration I Configuration II Configuration III
Tower Base Std. 550 HC 630 EC-H 500 HC-L or 12'-3" (8'-10") *
12'-3" (8'-10") *
Components or 500 HC-L Base Section 540 HC-L
3.75m (2.7m) 3.75m (2.7m)
Tower Section Base
Section
12'-3" (8'-10") *
3.75m (2.7m) 12.42m
12.42m

40'-8"
40'-8"
19'-0"
5.8m

0.28m
0.28m
0.4m
1'-4"

11"
11"

No. of Tower Boom Length Boom Length Boom Length


Sections 98 ft 164 ft 98 ft 30m 131 ft 40m 180 ft 55m
30m 50m 180 ft 213 ft 55m 65m 115 ft 35m 164 ft 50m 197 ft 60m 213 ft 65m 98 ft 115 ft 30m 35m 131 ft 213 ft 40m 65m
0 1.3 ft 0.4m 1.3 ft 0.4m 41.6 ft 12.7m 41.6 ft 12.7m 41.6 ft 12.7m 41.6 ft 12.7m 41.6 ft 12.7m 41.6 ft 12.7m
1 20.3 ft 6.2m 20.3 ft 6.2m 60.7 ft 18.5m 60.7 ft 18.5m 60.7 ft 18.5m 60.7 ft 18.5m 60.7 ft 18.5m 60.7 ft 18.5m
2 39.4 ft 12m 39.4 ft 12m 79.7 ft 24.3m 79.7 ft 24.3m 79.7 ft 24.3m 79.7 ft 24.3m 79.7 ft 24.3m 79.7 ft 24.3m
3 58.4 ft 17.8m 58.4 ft 17.8m 98.8 ft 30.1m 98.8 ft 30.1m 98.8 ft 30.1m 98.8 ft 30.1m 98.8 ft 30.1m 98.8 ft 30.1m
4 77.4 ft 23.6m 77.4 ft 23.6m 117.8 ft 35.9m 117.8 ft 35.9m 117.8 ft 35.9m 117.8 ft 35.9m 117.8 ft 35.9m 117.8 ft 35.9m
5 96.5 ft 29.4m 96.5 ft 29.4m 136.8 ft 41.7m 136.8 ft 41.7m 136.8 ft 41.7m 136.8 ft 1,2 41.7m 1,2 136.8 ft 41.7m 136.8 ft 41.7m
6 115.5 ft 35.2m 115.5 ft 35.2m 155.8 ft 47.5m 155.8 ft 47.5m 155.8 ft 1,2 47.5m 1,2 155.8 ft 47.5m 155.8 ft 47.5m
7 134.5 ft 41m 134.5 ft 1,2 41m 1,2 174.9 ft 53.3m 174.9 ft 1,2 53.3m 1,2 174.9 ft 53.3m 174.9 ft 1,2 53.3m 1,2
8 153.5 ft 1,2 46.8m 1,2 193.9 ft 1,2 59.1m 1,2 193.9 ft 1,2 59.1m 1,2
* See Clearance Requirements illustration on previous page.
1
Lower top climbing unit to base of crane prior to operating.
2
Out of operation boom position from 15 to 70. Out-of-operation boom position varies according to boom NOTE: Alternate tower combinations possible.
length and number of tower sections installed. Refer to Operations Manual for specific information.
Contact Morrow for additional information.

MEC-MKT-1316
02/10/17

3
540 HC-L 12

Radius and Capacities


Hook Maximum ft 13* 66 98 107 115 123 131 139 148 156 164 172 180 189 197 205 213
Reach Capacity Radius m 4* 20 30 32.5 35 37.5 40 42.5 45 47.5 50 52.5 55 57.5 60 62.5 65
213 ft 26,460 lbs 127 ft lbs 26,460 26,460 26,460 26,460 26,460 26,460 25,245 22,155 20,945 19,160 17,550 16,115 14,795 13,625 12,520 11,530 10,580
65m 12 000 kg 38.8m kg 12 000 12 000 12 000 12 000 12 000 12 000 11 450 10 410 9 500 8 690 7 960 7 310 6 710 6 180 5 680 5 230 4 800
197 ft 26,460 lbs 136 ft lbs 26,460 26,460 26,460 26,460 26,460 26,460 26,460 24,440 23,345 21,495 19,820 18,320 16,955 15,720 14,550
60m 12 000 kg 41.4m kg 12 000 12 000 12 000 12 000 12 000 12 000 12 000 11 540 10 590 9 750 8 990 8 310 7 690 7 130 6 600
180 ft 26,460 lbs 144 ft lbs 26,460 26,460 26,460 26,460 26,460 26,460 26,460 26,460 25,395 23,415 21,625 20,020 18,520
55m 12 000 kg 43.8m kg 12 000 12 000 12 000 12 000 12 000 12 000 12 000 12 000 11 520 10 620 9 810 9 080 8 400
164 ft 26,460 lbs 150 ft lbs 26,460 26,460 26,460 26,460 26,460 26,460 26,460 26,460 26,460 25,065 23,150
50m 12 000 kg 45.8m kg 12 000 12 000 12 000 12 000 12 000 12 000 12 000 12 000 12 000 11 370 10 500
148 ft 26,460 lbs 148 ft lbs 26,460 26,460 26,460 26,460 26,460 26,460 26,460 26,460 26,460
45m 12 000 kg 45m kg 12 000 12 000 12 000 12 000 12 000 12 000 12 000 12 000 12 000
131 ft 26,460 lbs 131 ft lbs 26,460 26,460 26,460 26,460 26,460 26,460 26,460
40m 12 000 kg 40m kg 12 000 12 000 12 000 12 000 12 000 12 000 12 000
115 ft 26,460 lbs 115 ft lbs 26,460 26,460 26,460 26,460 26,460
35m 12 000 kg 35m kg 12 000 12 000 12 000 12 000 12 000
98 ft 26,460 lbs 98 ft lbs 26,460 26,460 26,460
30m 12 000 kg 30m kg 12 000 12 000 12 000 *Minimum hook reach. 1-PART OPERATION
NOTE: Lifting capacities vary depending on the amount of hoist rope installed. The figures in the chart above are for hook heights up to 328 feet (100m). For capacity charts for
hook heights exceeding 328 feet (100m), refer to the Liebherr 540 HC-L 12 Litronic Operation Manual or contact Morrow Equipment.

Capacity

26,460 lbs/12 000 kg *Minimum hook reach. 26,460 lbs (12 000 kg) 1-PART OPERATION
23,150 lbs
24,250 lbs/11 000 kg 10 500 kg

22,045 lbs/10 000 kg


18,520 lbs
19,840 lbs/9 000 kg 8 400 kg

17,640 lbs/8 000 kg


14,550 lbs
15,430 lbs/7 000 kg 6 600 kg

13,230 lbs/6 000 kg


10,580 lbs
4 800 kg
11,025 lbs/5 000 kg

8,820 lbs/4 000 kg

6,615 lbs/3 000 kg

4,410 lbs/2 000 kg

2,205 lbs/1 000 kg

0
Hook Radius in ft 0 13 20 30 40 50 60 70 80 90 98 115 131 148 164 180 197 213
in meters 0 4 6.1 9.1 12.2 15.2 18.3 21.3 24.4 27.4 30 35 40 45 50 55 60 65

MEC-MKT-1316
02/10/17

4
540 HC-L 12

Radius and Capacities


Boom Hook Maximum ft 13* 82 90 97 107 113 123 129 139 146 156 162 172 179 189 195
Length Reach Capacity Radius m 4* 25 27.5 29.4 32.5 34.4 37.5 39.4 42.5 44.4 47.5 49.4 52.5 54.4 57.5 59.4
197 ft 195 ft 52,910 lbs 71 ft lbs 52,910 43,650 38,490 34,195 30,690 27,645 25,090 22,860 20,920 19,180 17,635 16,270 15,035 13,890 12,850 12,125
60m 59.4m 24 000 kg 21.6m kg 24 000 19 800 17 460 15 510 13 920 12 540 11 380 10 370 9 490 8 700 8 000 7 380 6 820 6 300 5 830 5 500
180 ft 179 ft 52,910 lbs 75 ft lbs 52,910 47,530 42,020 37,480 33,730 30,510 27,780 25,400 23,325 21,495 19,840 18,365 17,040 16,095
55m 54.4m 24 000 kg 23m kg 24 000 21 560 19 060 17 000 15 300 13 840 12 600 11 520 10 580 9 750 9 000 8 330 7 730 7 300
164 ft 162 ft 52,910 lbs 80 ft lbs 52,910 51,060 45,280 40,500 36,550 33,200 30,335 27,820 25,640 23,680 21,935 20,725
50m 49.4m 24 000 kg 24.3m kg 24 000 23 160 20 540 18 370 16 580 15 060 13 760 12 620 11 630 10 740 9 950 9 400
148 ft 146 ft 52,910 lbs 84 ft lbs 52,910 52,910 48,125 43,055 38,870 35,295 32,230 29,565 27,205 25,575
45m 44.4m 24 000 kg 25.5m kg 24 000 24 000 21 830 19 530 17 630 16 010 14 620 13 410 12 340 11 600
131 ft 129 ft 52,910 lbs 86 ft lbs 52,910 52,910 49,580 44,400 40,100 36,420 33,270 31,085
40m 39.4m 24 000 kg 26.1m kg 24 000 24 000 22 490 20 140 18 190 16 520 15 090 14 100
115 ft 113 ft 52,910 lbs 88 ft lbs 52,910 52,910 50,990 45,660 41,160 38,140
35m 34.4m 24 000 kg 26.7m kg 24 000 24 000 23 130 20 710 18 670 17 300
98 ft 97 ft 52,910 lbs 89 ft lbs 52,910 52,910 51,985 48,060
30m 29.4m 24 000 kg 27.2m kg 24 000 24 000 23 580 21 800 *Minimum hook reach. 2-PART OPERATION
NOTE: Lifting capacities vary depending on the amount of hoist rope installed. The figures in the chart above are for hook heights up to 328 feet (100m). For capacity charts for
hook heights exceeding 328 feet (100m), refer to the Liebherr 540 HC-L 12 Litronic Operation Manual or contact Morrow Equipment.

Capacity

52,910 lbs/24 000 kg


*Minimum hook reach. 52,910 lbs (24 000 kg) 2-PART OPERATION
48,060 lbs
48,500 lbs/22 000 kg 21 800 kg

44,090 lbs/20 000 kg


38,140 lbs
17 300 kg
39,685 lbs/18 000 kg

35,275 lbs/16 000 kg 31,085 lbs


14 100 kg
30,865 lbs/14 000 kg
25,275 lbs
26,460 lbs/12 000 kg 11 600 kg
20,725 lbs
22,045 lbs/10 000 kg 9 400 kg
16,095 lbs
17,640 lbs/8 000 kg 7 300 kg
12,125 lbs
13,230 lbs/6 000 kg 5 500 kg

8,820 lbs/4 000 kg

4,410 lbs/2 000 kg

0
Hook Radius in ft 0 13 20 30 40 50 60 70 80 90 97 113 129 146 162 179 195
in meters 0 4 6.1 9.1 12.2 15.2 18.3 21.3 24.4 27.4 29.4 34.4 39.4 44.4 49.4 54.4 59.4

MEC-MKT-1316
02/10/17

5
540 HC-L 12

Tie-in Configurations
IMPORTANT: Please consult crane operation manual before
erecting, operating, climbing, servicing and dismantling. * Lower the top climbing unit to
the uppermost tie-in prior to
operating crane at maximum
tower configuration.

C * Hydraulic Top
Climbing Unit

[Site conditions
Tie-In
Centerline dependent] Assembly
of tower

Face of Anchor shoe


structure

when climbing.
Direction of boom

E B

[Site conditions
dependent]
* Hydraulic Top
Climbing Unit
1st Tie-In
Assembly
Tie-In Tie-in
Assembly Tie-in struts (3)
collar Connection plates
8'-10" (2.7m) min by contractor

D TIE-IN ASSEMBLY
A
Plan View
NOTE: The tie-in assembly shown is an example of a Base of
Base of typical installation. Please note, however, that factors Crane
Crane
determining the installation of tie-in assemblies may
vary due to project specific conditions. Please contact
TOP CLIMBING Morrow for information regarding dimensions, reaction TOP CLIMBING
with 550 HC Tower Sections forces and tie-in locations. with 550 HC Tower Sections
Tied to structure with 1 tie-in Tied to structure with 2 tie-ins

Tower sections required with 1 tie-in


Boom Length 213' 180' (65m 55m) 164' 131' (50m 40m) 115' 98' (35m 30m)

Above uppermost tie-in (E) 6 max 3 min 7 max 3 min 8 max 3 min
Base to 1st tie-in assembly (D) 7 max 4 min 8 max 4 min 9 max 4 min

Tower sections required with 2 or more tie-ins


Boom Length 213' 180' (65m 55m) 164' 131' (50m 40m) 115' 98' (35m 30m)

Above uppermost tie-in (C) 5 max 3 min 6 max 3 min 7 max 3 min
Between tie-in assemblies (B) 6 max 4 min 7 max 4 min 8 max 4 min
Base to 1st tie-in assembly (A) 7 max 4 min 8 max 4 min 9 max 4 min
NOTE: Data above applies only to 540 HC-L 12 configurations with 550 HC tower. Contact Morrow for information regarding alternate tower configurations.

MEC-MKT-1316
02/10/17

6
540 HC-L 12

Hoist Speed and Capacity


Hoist Unit WiW 300 VZ 405 1-Part Line
147 hp (110 kW) FC hoist unit Speed Capacity Hook Speed Capacity Hook Speed
Variable frequency drive (VFD) up to 26,460 lbs @ 0 - 148 fpm up to 12 000 kg @ 0 - 45m/min
3-speed electromagnetic gear shifting 1
up to 11,680 lbs @ 0 - 272 fpm up to 5 300 kg @ 0 - 83m/min
up to 13,890 lbs @ 0 - 256 fpm up to 6 300 kg @ 0 - 78m/min
2
up to 4,630 lbs @ 0 - 472 fpm up to 2 100 kg @ 0 - 144m/min
up to 6,610 lbs @ 0 - 430 fpm up to 3 000 kg @ 0 - 131m/min
3 up to 660 lbs @ 0 - 787 fpm up to 300 kg @ 0 - 240m/min
2-Part Line
up to 52,910 lbs @ 0 - 75 fpm up to 24 000 kg @ 0 - 23m/min
1
up to 24,690 lbs @ 0 - 138 fpm up to 11 200 kg @ 0 - 42m/min
up to 29,100 lbs @ 0 - 128 fpm up to 13 200 kg @ 0 - 39m/min
2 up to 12,350 lbs @ 0 - 236 fpm up to 5 600 kg @ 0 - 72m/min
up to 15,650 lbs @ 0 - 213 fpm up to 7 100 kg @ 0 - 65m/min
1P-4L435 3 up to 5,070 lbs @ 0 - 394 fpm up to 2 300 kg @ 0 - 120m/min
2P-4L217

NOTE: Capacities and hook speeds indicated will vary depending on the amount of hoist rope installed. This crane model may be equipped with a hoist unit other than that
specified in the data above. To verify, check the serial number of the crane and refer to the Liebherr 540 HC-L 12 Litronic Operation Manual for additional information.

Motor Information
Drive Unit Horsepower Kilowatts Speed
Luffing (Variable Frequency Drive) 147 hp 110 kW 1.9 min

Swing (VFD) 2 x 14.7 hp 2 x 11 kW 0.6 rpm

Travelling Information available upon request

Counterweights
Boom Length 213' 164' (65m 50m) 148' 131' (45m 40m) 115' 98' (35m 30m)

Number of steel blocks required 11 10 9

Total weight 119,075 lbs 108,250 lbs 97,425 lbs

Total weight 54 010 kg 49 100 kg 44 190 kg


NOTE: Weight of the steel counterweight blocks are 10,825 lbs (4 910 kg) each. It is recommended that the weight of each counterweight be verified before installation.
Counterweight figures displayed in the chart above are for crane with hoist unit WiW 300 VZ 405. If another hoist unit is installed, refer to the 540 HC-L 12 Litronic Operation
Manual or contact Morrow Equipment for additional information.

Power Requirements
Power supply: 3-phase 480 V, 60 Hz; 3-wire plus ground; no Neutral.
480 V phase-phase, 277 V each phase to ground with 120 phase shift between phases.
Service size: 400 Amperes
NOTES:
1. For electric power provided by an electric utility, do not use open Delta transformers.
2. For electric power provided by a generator, the minimum generator size required is 1200 kW. Verify the generator provided is suitable for use with variable frequency drives (VFDs).
A properly sized generator is critical to the safe operation of the crane.

MEC-MKT-1316
02/10/17

7
540 HC-L 12

Component List

Description Dimensions Weight Description Dimensions Weight


LxWxH LxWxH
Slewing Ring Support H 9-4 x 7-5 x 6-7 16,760 lbs Butt Section H 32-10 x 6-5 x 6-3 6,615 lbs
L W 2.85m x 2.27m x 2m 7 600 kg 611 L W
10.0m x 1.96m x 1.9m 3 000 kg

Connection Plates (2) H 10-10 x 2-0 x 3-7 3,415 lbs Boom Section H 12-8 x 6-3 x 6-3 2,315 lbs
(each) L W 3.3m x 0.6m x 1.1m 1 550 kg 612 L W
3.85m x 1.9m x 1.9m 1 050 kg

Slewing Platform 1 H 9-10 x 7-5 x 8-4 23,810 lbs Boom Section H 34-9 x 6-3 x 6-11 5,730 lbs
plus swing motors L W
3m x 2.25m x 2.53m 10 800 kg 621 L W
10.6m x 1.9m x 2.1m 2 600 kg

Machine Deck H 22-2 x 7-3 x 8-4 20,280 lbs Boom Section H 34-9 x 6-3 x 6-3 5,070 lbs
with electrical panels L
6.75m x 2.22m x 2.53m 9 200 kg 631 L W 10.6m x 1.9m x 1.9m 2 300 kg
W

Hoist Gear (VFD) 2 H 12-10 x 7-6 x 6-7 12,680 lbs Boom Section H 18-0 x 6-3 x 6-11 2,755 lbs
147 hp (110 kW) L W
3.9m x 2.28m x 2m 5 750 kg 622 L W 5.5m x 1.9m x 2.1m 1 250 kg

Luffing Gear (VFD) 2 H 10-2 x 7-7 x 5-3 9,920 lbs Tip Section H
37-9 x 6-7 x 8-4 7,275 lbs
147 hp (110 kW) L
3.1m x 2.32m x 1.6m 4 500 kg 641 L W
11.5m x 2.0m x 2.55m 3 300 kg
W

Operators Cab H 19-8 x 7-3 x 8-5 4,410 lbs Top Climbing Unit 4 H 41-4 x 9-8 x 5-9 17,415 lbs
with access platform L W
6m x 2.2m x 2.57m 2 000 kg Panels (2) L W 12.6m x 2.95m x 1.75m 7 900 kg

Platforms (2) H 21-4 x 3-11 x 3-3 1,170 lbs Top Climbing Unit 4 6,835 lbs
(each) L W 6.5m x 1.2m x 1m 530 kg Hydraulics 3 100 kg

Gantry 3 H 39-4 x 7-6 x 8-5 22,270 lbs Boom Assembly Part 1 5 78-5 x 6-5 x 6-11 18,740 lbs
(complete) L W 12m x 2.28m x 2.56m 10 100 kg for 213-ft 148-ft booms 23.9m x 1.96m x 2.1m 8 500 kg

Auxiliary Crane H 14-5 x 2-11 x 2-0 1,545 lbs Boom Assembly Part 2 6 139-7 x 6-7 x 8-4 25,575 lbs
with Support 4.4m x 0.9m x 0.6m 700 kg for 213-ft (65.0m) boom 42.6m x 2m x 2.55m 11 600 kg
L W

Base Section H 40-9 x 8-8 x 8-8 31,010 lbs Boom Assembly Part 2 6 122-7 x 6-7 x 8-4 22,710 lbs
630 EC-H 12.42m x 2.65m x 2.65m 14 065 kg for 197-ft (60.0m) boom
37.4m x 2m x 2.55m 10 300 kg
L W

Base Section H 40-9 x 8-10 x 8-10 37,855 lbs Boom Assembly Part 2 6 105-8 x 6-7 x 8-4 19,840 lbs
500 HC-L 12.42m x 2.68m x 2.68m 17 170 kg for 180-ft (55.0m) boom
32.2m x 2m x 2.55m 9 000 kg
L W

Base Section H 40-9 x 8-10 x 8-10 31,880 lbs Boom Assembly Part 2 6 88-8 x 6-7 x 8-4 16,975 lbs
540 HC-L 12.42m x 2.68m x 2.68m 14 460 kg for 164-ft (50.0m) boom
27m x 2m x 2.55m 7 700 kg
L W

Std Tower Section H 20-7 x 8-0 x 8-0 14,285 lbs Boom Assembly Part 2 6 71-8 x 6-7 x 8-4 14,110 lbs
550 HC 6.28m x 2.45m x 2.45m 6 480 kg for 148-ft (45.0m) boom 21.8m x 2m x 2.55m 6 400 kg
L W

Long Section 39'-8 x 8-0 x 8-0 23,480 lbs Boom Assembly Complete 7 132-5 x 6-7 x 8-4 29,540 lbs
550 HC 12.1m x 2.45m x 2.45m 10 650 kg 131-ft (40.0m) boom
40.4m x 2m x 2.55m 13 400 kg

Tower Section H 20-7 x 8-0 x 8-0 17,900 lbs Boom Assembly Complete 7 115-5 x 6-7 x 8-4 26,675 lbs
500 HC-L 6.28m x 2.45m x 2.45m 8 120 kg 115-ft (35.0m) boom
35.2m x 2m x 2.55m 12 100 kg
L W

Hook Block H 7-10 x 3-11 x 2-9 3,415 lbs Boom Assembly Complete 7 98-5 x 6-7 x 8-4 22,930 lbs
2.4m x 1.2m x 0.85m 1 550 kg 98-ft (30.0m) boom
30.0m x 2m x 2.55m 10 400 kg
L W

Luffing Rope Sheave Block H 4-11 x 3-11 x 3-7 1,325 lbs Counterweight (11) H 14-9 x 2-11 x 0-8 10,825 lbs
L W
1.5m x 1.2m x 1.1m 600 kg Steel (each) L W
4.5m x 0.9m x 0.2m 4 910 kg

NOTE: Weights and dimensions are approximate. Scale components before lifting. Consult operation manual before erecting, operating, servicing and dismantling crane.
1
Slewing platform can be split into two parts: Part A at 18,960 lbs (8 600 kg) and Part B at 4,850 lbs (2 200 kg).
2
Does not include wire rope. To calculate wire rope weight: 2.37 lb/ft (3.53 kg/m). Luffing and hoisting rope is 27mm dia.
3
Gantry (boom retaining frame) can be split in three parts: Part A at 9,920 lbs (4 500 kg), Part B at 5,510 lbs (2 500 kg) and Part C at 6,835 lbs (3 100 kg).
4
Top climbing unit complete includes front panel, rear panel, hydraulic system, ladders and platforms with a total weight of 24,250 lbs (11 000 kg).
5
Boom assembly Part 1 includes boom sections #1, #2 and #3 and erection wire rope.
6
Boom assembly Part 2 includes boom sections and pendent bars.
7
Complete boom assemblies can be split into two parts.

MEC-MKT-1316 02/10/17

Morrow Equipment Company, LLC


3218 Pringle Road SE, P O Box 3306, Salem OR 97302-0306 USA
Tel: +1 503.585.5721, Fax: +1 503.363.1172
USA CANADA MEXICO AUSTRALIA NEW ZEALAND www.morrow.com, info@morrow.com
8

Vous aimerez peut-être aussi