I.- VISION
II.- OBJETIVOS
IV.I. OBSERVACIONES:
Actividad Equipo Metro Perforado ene-16 feb-16 mar-16 abr-16 may-16 jun-16
B-20 Boltec S 5,339 4,466 3,722 4,193 4,233 5,752
R-27 Robolt 4,763 6,409 4,888 5,012 3,686 3,192
sostenimiento
B-28 Boltec S 3,756 4,769 5,278 595 2,934 6,817
R-14 Robolt 4,186 5,219 4,391
J-13 Boomer 282 15,857 14,413 15,200 12,889 15,870 15,603
J-14 S1D 7,152
J-18 S1D 10,650 11,854 10,309 12,486 14,120 11,625
frontonero
J-22 S1D 13,630 13,577 10,301 8,028 8,417 7,120
J-23 S1D 254 4,103 6,382 3,593 14,383
J-24 S1D 9,579 8,882 7,819 7,172 7,007 11,409
SIMBA-10 S7D 6,537 5,742 7,430 7,931 1,396
SIMBA-15 S7D 9,247 12,847 12,660 9,707 12,026 10,681
SIMBA-18 S7D 7,779 10,554 10,240 8,145 8,028 10,532
produccion
SIMBA-20 S7D 4,635 7,914 8,283 9,945 8,210 11,109
SIMBA-21 simba 1254 8,369 11,146 9,143 8,886 8,938 9,832
SIMBA-22 S7D 3,148 11,127 11,373 10,713 12,666
total metros perforados 100,393 115,720 120,503 116,931 121,542 135,112
ACP RDT CMP JCR EL BROCAL
VI.- RENDIMIENTOS
Se necesita el apoyo para solicitar que JRC evite la rotacin continua de sus
operadores en los diferentes equipos de perforacin, dicha practica complica la labor
de control de aceros (barras y shank adapter y brocas).
IX.- REQUERIMIENTOS
Atentamente