PROJECT ARTESIA MID RISE BUILDING (G+28) ON PLOT NO.676-5408(E006)
Date 7/26/2017
Job No
PROJECT ARTESIA MID RISE BUILDING (G+28) ON PLOT NO.676-5408(E006)
Date 7/26/2017
B= 22 m A= -2.00
A= b/4 = 5.5 m (B/4) B= -1.40
LENGTH = 2.2 m (B/10) C= -0.70
D= -0.20
UPWARD (Pressure):
ZONE - A = (-2-0.2)*2.5 = 5.50 kN/m2
ZONE - B = (-1.4-0.2)*2.5 = 4.00 kN/m2 COEFFICIENT = +0.2
ZONE - C = (-0.7-0.2)*2.5 = 2.25 kN/m2
ZONE - D = (-0.2-0.2)*2.5 = 1.00 kN/m2
DOWNWARD (Suction):
B= 35 m A= -2.00
A= b/4 = 8.75 m (B/4) B= -1.40
LENGTH = 3.5 m (B/10) C= -0.70
D= -0.20
UPWARD [PRESSURE]:
ZONE - A = (-2-0.2)*2.5 = 5.50 kN/m2
ZONE - B = (-1.4-0.2)*2.5 = 4.00 kN/m2 COEFFICIENT = +0.2
ZONE - C = (-0.7-0.2)*2.5 = 2.25 kN/m2
ZONE - D = (-0.2-0.2)*2.5 = 1.00 kN/m2
DOWNWARD [SUCTION]: