Vous êtes sur la page 1sur 1

UMM WU'AL PHOSPHATE PROJECT UTILITIES & INFRASTRUCTURE

Part - 1
NOTICE-REQUEST FOR INSPECTION RFI NO: MD-512-0G00-CN-CV-RFI-KB64-00
`
Project Title : UMM WU'AL PHOSPHATE PROJECT Asset Group Name: SEG

Plant/Unit No.: U&I PROJECT Plant/Package Name : UMM WU'AL PHOSPHATE PROJECT

To: JACOBS Inspection Team/Mr. : D. Ayles/AlSubha

Civil/Structural Mechanicall Piping Plumbing HVAC Electrical Instrumentation Telecom.

Inspection is required on (date) : 5-Jul-16 at time: 10:00 AM item to be inspected


Witness of crushing of concrete cylinders 28 days samples of precast
bollards -111 nos

Location and/or Equipment : Witness Hold Surveillance


Alwan Laydown

Work Permit Required: Yes No

Inspection Activity and Test Plan Checklist: N/A

Contractor has verified that the work is complete and Contractor : SEG
inspected in compliance the following specification
QA/QC Name : Shamshuddin

Specs/Standards: MD-101-SMEM-EG-ST-SPC-0005 Signature :

Drawing(s) : N/A Date : 5-Jul-15 594359668

Part II

This RFI was received by the undersigned QA/QC person

Name: ARSHAD Signature: Date: Time:

Attended : Yes No

Accepted Rejected Not Ready Log book entry:

Inspector 's Comment

Date of Inspection Inspector's Name D. Ayles Badge No:

"JACOBS Confidential - Do Not Share Without Permission"

Vous aimerez peut-être aussi