CANASINO CONSTRUCTION CORPERATION

Item: Support System


Project: Olypia City
Date: 21/7/2017

Material List for First Layer Support System

Code Items Unit Quantity Length Total Length Code Items Unit Quantity Length Total Length Code Items Unit Quantity Length Total Length
H1 DB20 m 4 7.64 30.56 H1 DB12 m 20 0.20 4.00 H1 DB10 m 8 0.20 1.60
H2 DB20 m 4 7.50 30.00 H2 DB12 m 20 0.20 4.00 H2 DB10 m 8 0.20 1.60
H3 DB20 m 4 7.25 29.00 H3 DB12 m 20 0.20 4.00 H3 DB10 m 8 0.20 1.60
H4 DB20 m 4 4.41 17.64 H4 DB12 m 8 0.20 1.60 H4 DB10 m 8 0.20 1.60
H5 DB20 m 4 4.54 18.16 H5 DB12 m 8 0.20 1.60 H5 DB10 m 8 0.20 1.60
H6 DB20 m 4 4.58 18.32 H6 DB12 m 8 0.20 1.60 H6 DB10 m 8 0.20 1.60
H7 DB20 m 4 4.58 18.32 H7 DB12 m 8 0.20 1.60 H7 DB10 m 8 0.20 1.60
H8 DB20 m 4 4.56 18.24 H8 DB12 m 8 0.20 1.60 H8 DB10 m 8 0.20 1.60
H9 DB20 m 4 4.68 18.72 H9 DB12 m 8 0.20 1.60 H9 DB10 m 8 0.20 1.60
H10 DB20 m 4 4.83 19.32 H10 DB12 m 8 0.20 1.60 H10 DB10 m 8 0.20 1.60
H11 DB20 m 4 4.79 19.16 H11 DB12 m 8 0.20 1.60 H11 DB10 m 8 0.20 1.60
H12 DB20 m 4 4.84 19.36 H12 DB12 m 8 0.20 1.60 H12 DB10 m 8 0.20 1.60
H13 DB20 m 4 4.90 19.60 H13 DB12 m 8 0.20 1.60 H13 DB10 m 8 0.20 1.60
H14 DB20 m 4 4.96 19.84 H14 DB12 m 8 0.20 1.60 H14 DB10 m 8 0.20 1.60
H15 DB20 m 4 5.01 20.04 H15 DB12 m 8 0.20 1.60 H15 DB10 m 8 0.20 1.60
H16 DB20 m 4 4.84 19.36 H16 DB12 m 8 0.20 1.60 H16 DB10 m 8 0.20 1.60
H17 DB20 m 4 4.65 18.60 H17 DB12 m 8 0.20 1.60 H17 DB10 m 8 0.20 1.60
H18 DB20 m 4 4.59 18.36 H18 DB12 m 8 0.20 1.60 H18 DB10 m 8 0.20 1.60
H19 DB20 m 4 4.60 18.40 H19 DB12 m 8 0.20 1.60 H19 DB10 m 8 0.20 1.60
H20 DB20 m 4 4.60 18.40 H20 DB12 m 8 0.20 1.60 H20 DB10 m 8 0.20 1.60
H21 DB20 m 4 4.61 18.44 H21 DB12 m 8 0.20 1.60 H21 DB10 m 8 0.20 1.60
H22 DB20 m 4 4.61 18.44 H22 DB12 m 8 0.20 1.60 H22 DB10 m 8 0.20 1.60
H23 DB20 m 4 10.56 42.24 H23 DB12 m 8 0.20 1.60 H23 DB10 m 8 0.20 1.60
H24 DB20 m 4 10.34 41.36 H24 DB12 m 8 0.20 1.60 H24 DB10 m 8 0.20 1.60
H25 DB20 m 4 10.12 40.48 H25 DB12 m 8 0.20 1.60 H25 DB10 m 8 0.20 1.60
H26 DB20 m 4 9.90 39.60 H26 DB12 m 8 0.20 1.60 H26 DB10 m 8 0.20 1.60
H27 DB20 m 4 9.68 38.72 H27 DB12 m 8 0.20 1.60 H27 DB10 m 8 0.20 1.60
H28 DB20 m 4 9.48 37.92 H28 DB12 m 8 0.20 1.60 H28 DB10 m 8 0.20 1.60
Total: 686.60 Total: 52.00 Total: 44.80
Code Items Unit Quantity Length Total Length
H1 I200x200x8x12mm m 2 2.10 4.20
H2 I200x200x8x12mm m 2 2.10 4.20
H3 I200x200x8x12mm m 2 2.10 4.20 No Description Unit Quantity
H4 I200x200x8x12mm m 1 1.00 1.00 1 DB20 kg 1693.3
H5 I200x200x8x12mm m 1 1.20 1.20 2 DB12 kg 46.2
H6 I200x200x8x12mm m 1 1.20 1.20 3 DB10 kg 27.6
H7 I200x200x8x12mm m 1 1.20 1.20 4 I200x200x8x12mm m 40.4
H8 I200x200x8x12mm m 1 1.20 1.20 5 I450x200x8x12mm m 471
H9 I200x200x8x12mm m 1 1.20 1.20 6 L90x90x8mm m 353.4
H10 I200x200x8x12mm m 1 1.20 1.20 7 Coupler each 112
H11 I200x200x8x12mm m 1 1.20 1.20 2,744
H12 I200x200x8x12mm m 1 1.20 1.20
H13 I200x200x8x12mm m 1 1.20 1.20
H14 I200x200x8x12mm m 1 1.20 1.20
H15 I200x200x8x12mm m 1 1.20 1.20
H16 I200x200x8x12mm m 1 1.60 1.60
H17 I200x200x8x12mm m 1 1.00 1.00
H18 I200x200x8x12mm m 1 1.00 1.00
H19 I200x200x8x12mm m 1 1.00 1.00
H20 I200x200x8x12mm m 1 1.00 1.00
H21 I200x200x8x12mm m 1 1.00 1.00
H22 I200x200x8x12mm m 1 1.00 1.00
H23 I200x200x8x12mm m 1 1.00 1.00
H24 I200x200x8x12mm m 1 1.00 1.00
H25 I200x200x8x12mm m 1 1.00 1.00
H26 I200x200x8x12mm m 1 1.00 1.00
H27 I200x200x8x12mm m 1 1.00 1.00
H28 I200x200x8x12mm m 1 1.00 1.00
Total: 40.40

Code Items Unit Quantity Length Total Length


I450x200x8x12 m 1 462.00 462.00
H1,H2,H3I450x200x8x12 m 3 3.00 9.00
Total: 471.00

Code Items Unit Quantity Length Total Length


L90x90x8mm m 186 1.90 353.40

Code Items Unit Quantity


Coupler each 112
CANASINO CONSTRUCTION CORPERATION

Item: Support System


Project: Olypia City
Date: 21/7/2017

Material List for Second Layer Support System

Code Items Unit Quantity Length Total Length


S1 H400x400x8x12mm m 21.00 19.40 407.40
S2 H400x400x8x12mm m 1.00 21.90 21.90
S3 H400x400x8x12mm m 1.00 16.40 16.40
S4 H400x400x8x12mm m 1.00 18.10 18.10
S5 H400x400x8x12mm m 13.00 15.70 204.10
S6 H400x400x8x12mm m 2.00 14.20 28.40
S7 H400x400x8x12mm m 2.00 7.60 15.20
total 711.50

Code Items Unit Quantity Length Total Length


Beam H400x400x8x12mm m 1.00 462.00 432.70
(if not full area of beam boundary)
Code Items Unit Quantity Length Total Length
Support L L90x90x8mm m 174.00 1.90 330.60
(if not full area of beam boundary)
No Description Unite Quantity
1 H400x400x8x12mm m 1,144.20
2 L90x90x8mm m 330.60
CANA SINO CONSTRUCTION CORPORATION
QUANTITIES CALCULATION

Project : Olympia city


Item : Quality of Strut
Location : Olypic
Date : 14/7/2017

Material list for first layer systeme support


No Description Unit Quantity
1 DB20 kg 1,693.26 (686.6m)
2 DB12 kg 46.17 (52m)
3 DB10 kg 27.62 (44.8m)
4 I200x200x8x12mm m 40.40
5 I450x200x8x12mm m 471.00
6 L90x90x8mm m 353.40
7 Coupler each 112.00

Material list for Second layer systeme support


No Description Unite Quantity
1 H400x400x8x12mm m 1,144.20
2 L90x90x8mm m 330.60