Académique Documents
Professionnel Documents
Culture Documents
Trough
width (m) depth (m) Length (m) j Effective Length (m)
Trough 2.50 m 1.80 m 15.00 m 25 mm 14.30 m
Walk way projection 0.00 m 0.10 m
Walk way 0.20 m 0.20 m
Haunch 1 0.20 m 0.10 m
Side wall 0.30 m 2.40 m
Fillet 0.15 m 0.15 m
Haunch 2 0.15 m 0.45 m
Bulb 1 0.15 m 0.60 m
Bulb 2 0.00 m 0.00 m
Haunch 3 0.30 m 0.10 m
Base slab 2.20 m 0.25 m
Tie Nos
Top tie 0.25 m 0.15 m 2.10 m 6
Bottom tie 0.00 m 0.00 m 0.00 m 0.00 m 0 0
Stiffeners 0.00 m 0.00 m 0.00 m 0.00 m Length 0
Concrete density 2500
Water density 1000
Live load500 Spaced @ 2.7
Wt. of Hand-rail =400
sst = 1900 17.00
J = 0.89
d = 250 Cm
Stirrups
Diameter Legged Area
10 2 0.786
NEUTRAL AXIS
Data
Breath Depth
Walkway size = 40 Cm 20 Cm
Hanch Portion size = 20 Cm 10 Cm
Vertical wall thickness = 30 Cm
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
8000 800 15
4000 200
130897 524
101.5724606667 -9526 1
101.57a 9526 1a
Where
a= 59.240
FOR A DEPTH OF 20Cm
=0.662c
FOR A DEPTH OF 10Cm
=0.494c
0.6061
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
Longitudinal bending
0.15 0.2
2.5
d) 20CM x 10 CM
2.6 0.3
1.25
c ) 15CM x 45CM
a) 15CM x 15 CM
0.25
0.6
b) 30CM x 10 CM 0.6
3.3
Area of Trough:-
S.
Particulars Area
No
1 Walk way
0.20 x 0.20 x 4 0.1600
2 Haunch
1/2 x 0.20 x 0.10 x 4 0.0400
3 Side wall
0.30 x 2.40 x 2 1.4400
4 Fillet
1/2 x 0.15 x 0.15 x 2 0.0225
5 Haunch
1/2 x 0.15 x 0.45 x 2 0.0675
6 Bulb
0.15 x 0.60 x 4 0.3600
7 Haunch
1/2 x 0.30 x 0.10 x 2 0.0300
8 Base slab
2.20 x 0.25 0.5500
Total = 2.6700 m
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
Total = 0.5513 m
0.5513
Per m2 = = 0.0368 m
15
Water Load
Trough (2.50 x 1.80) = 4.5000
Deduct
Fillet = 1/2 x 0.15 x 0.15 x 2 = -0.0225
Haunch = 1/2 x 0.20 x 0.10 x 2 = -0.0200
4.4575 m2
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
42900
Nominal Shear Stress(tV) = = 5.720 Kg/cm
30 x 250
100 x 39.272
% age of Ast = = 0.524 %
30 x 250
2 x 0.786 x 1500
Spacing required =
30 x 2.672
= 29.416 Cm
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
0.15 0.2
2.5
d) 20CM x 10 CM
2.6 0.3
1.25
c ) 15CM x 45CM
a) 15CM x 15 CM
0.25
0.6
b) 30CM x 10 CM 0.6
Moment of Inertia m4
S No Particulars Area X AX
Ixx Ar2
Concrete
Steel
-4
9 16 x 4.909 x 12.33 x 10 0.0969 2.5000 0.2422 - 0.0840
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
1.8929
Zb1 = = 4.3919 m
0.4310
1.8929
Zb2 = = 2.7796 m
0.6810
1.8929
Zb3 = = 1.8360 m
1.0310
Stress :
M 306735
Stress at top Ft = = = + 254256 kg/m
Ztop 1.2064
OR 25.43 Kg/cm
[Compression]
M 306735
Stress at top slab Fb1 = = = - 69841 kg/m
Zb1 4.3919
OR 6.98 Kg/cm
[Tension]
M 306735
Stress at bottom of base slab Fb2 = = = - 110352 kg/m
Zb2 2.7796
OR 11.04 Kg/cm
[Tension]
M 306735
Stress at bottom of base slab Fb3 = = = - 167067 kg/m
Zb3 1.8360
OR 16.71 Kg/cm
[Tension]
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
59.24 cm d) 20CM x 10 CM
0.3
c ) 15CM x 45CM
a) 15CM x 15 CM 2.6
0.25
0.6
b) 30CM x 10 CM
0.6
Compression Zone = Tension Zone
a + 101.57a + 9526 = 0
a =59.24 Cms
Taking moment about steel :
Total = 392487 C
306735.00 x 100
Stress in concrete (f) = = 39.08Kg/cm
2 x 392487
fxmx (d - a)
Stress in steel =
a
My
Moment of Inertia =
f
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
420849
Effective area of bearing required = = 59526 mm
7.07
bo = 200 mm hi = 10 mm
Lo = 400 mm n= 2
he = 5 mm
Steel Plate Thcikness = 3 mm
420849
Actual Stress = = 5.679Mpa
190 x 390
400 mm
200 mm
39 mm
Lo = 400 mm bo = 200 mm
Lo 400
(i) = = 2.000 < 2. Hence ok
bo 200
(ii) h = Total elastrometric thickness
h = (n x hi + 2 x he )
= ( 2 x 10.0 + 2.0 x 5.0 )
= 30 mm
bo 200
(iii) = = 40 mm
5 5
bo 200
= = 20 mm
10 10
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
unsafe
unsafe
TRANSLATION:-
0.00050 x 14300
abd = 2
= 3.575 mm
ROTATION:-
1) The number of elastromer layers provided shall satisfy the following
0.5 x 10 x 10
abi, max = = 6.449E-03
190 x 6.388
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL
_____________________________________________________________________________________
KARNATAKA NEERAVRI NIGAM LIMITED BLIS
ad < b n abi,max
5.679 x 2 x 6.449E-03
= = 7.325E-03
10
The following limit shall be satisfied under any critical design load combination.
tg = gd = 0.1192 Mpa
ta = 0.5 x (b/hi) 2 x abi
= 1.1640 Mpa
_______________________________________________________________________________________
SECON PVT LTD, BANGALORE AQUEDUCT FROM CH OF 26+651KM TO 27+441KM OF BALUNDAGI LIFT MAIN CANAL