Material 1.

1%
Pintura 5.0%
Herramientas 2.0%
Soldadura 1.5%
Mano de Obra 25.0%

34.6%

L (m)
Tubo 2"x.9mm= 1.11 Kg
Tubo 1"x.9mm= 0.54 Kg

Cant L (m) Peso Kg/m


Tubo 1"x.9mm= 2 0.9492 0.54 1.03
Tubo 1"x.9mm= 2 0.06 0.54 0.06
Tubo 2"x.9mm= 1 1 1.11 1.11
Tapita 1(3/4") 2 1 0.064 0.13
Base 90x1/4" 2 1 0.16 0.32
Tubo Q1"x.9mm= 0.68
2.65

Kilo de Acero = S/. 18.00

S/. 47.66

Costo m/l = S/. 104.10


Material 1.1%
Pintura 5.0%
Herramientas 2.0%
Soldadura 1.5%
Mano de Obra 25.0%

34.6%

L (m)
Tubo 2"x.9mm= 1.11 Kg
Tubo 1"x.9mm= 0.54 Kg

Cant L (m) Peso Kg/m

Baranda Tubo 2"x.3mm= 0 1 1.11 0.00


Parante Tubo 2"x 2mm 2 1 2.41 4.82
Angulo L25x25x2.5mm 4 1 1.106 4.42
Platina 1/4"x2" 2 1 2.36 4.72
Plancha 100x100x6.35 2 1 0.498 1.00
Barra construccion 3/8" 2 1 0.112 0.22
Malla 2x2 #10 (3.4mm) 1 1 2.994 2.994
18.18

Kilo de Acero = S/. 12.50

S/. 227.23

Mano de Obra. Costo m/l = S/. 90.89

Armador 100
Operario 85
Soldador 85
Ayudante 60
330

Semana 1980 4 Semanas = 7920


Mes 8514
Jose 936058373

30 3

85 200 17000

9080
consumibles -2000
examenes -1000
6080