TOILET

BRICK WORK
Length Ht Thk Opening Total area Remarks Rate Qty Amount
115.0 24.385 2.65 0.115 64.62025 9.576 55.04425 sqm 523.3 55.0 28802.5
230.0 10.475 1.5 0.23 3.613875 4271.2 3.6 15435.7
P.C.C

150 thk
4.5 1.05 0.15 0.70875 (1:5:3) 5349.6 0.7 3791.5
Reinf.
36.72 m 28 kg with Ring 65.4 28.0 1830.1
Flooring
Area
18.7 sqm 150 mm thk 2.805 cum 3773.0 2.8 10583.2

Plaster
As/site As/site 12mm 72.9 sqm 129.7 72.9 9452.9

KITCHEN
B/W
Length Ht Thk Opening Total area Remarks
115 6.4 2.65 0.115 16.96 2.7315 14.2285 sqm 523.3 14.2 7445.2
230 3.85 2.65 0.23 2.346575 4271.2 2.3 10022.8
230 3.85 1.5 0.23 1.32825 4271.2 1.3 5673.3
P.C.C

150 thk
2.315 1 0.15 0.34725 (1:5:3) 5349.6 0.3 1857.6
Reinf.
13.2 m 10 kg with Ring 65.4 10.0 653.6

Flooring
Area
10.25 sqm 100 mm thk 1.025 cum 3773.0 1.0 3867.3
Counter
3.84 m 100 mm thk 0.384 cum 5504.3 0.4 2113.6
Reinf.
40.44 m 25.0728 kg with Ring 65.4 25.1 1638.8
Plaster
As/site As/site 12mm 48.3 sqm 129.7 48.3 6263.1
Earth Filling
3.19 2.74 0.60 5.25 cum earth fill 301.8 5.3 1584.8
Foundation
11.9 0.75 0.45 4.02 cum of brick below 0.00 level 4271.2 4.0 17154.4
11.9 0.6 0.23 1.64 cum of brick below 0.00 level 4271.2 1.6 7014.2
P.C.C Below Footing
11.9 0.1 0.45 0.54 cum of brick below 0.00 level (1:5:3) 5349.6 0.54 2864.7

For Tank
RCC 12879.95
PCC 4172.68
B/W 6015.397
ROOF SLAB 4293.315
REINF 32680
TOTAL 60041.34
Total Including tank 198090.6 Rupees
For Plaster Removal 20154.288 Rupees
For Demolishan 8952.52061 Rupees
For Plumbing 10000 Rupees
For M.S Door 27000 Rupees rs 4500 each for 6 doors
Deduction on account of brick 33832.1382 Rupees
Deduction on account of Stone Dust 9000 Rupees 225 cft @ rs 40
Deduction on account of Coarse Aggregate 9000 Rupees 225 cft @ rs 40
Deduction on account of cement 8410 Rupees 29 bags @ 290 each
Deduction on account of Advance 100000 Rupees
Final Payment amount 103955.3 Rupees