Checklist for Auditorium

1. Location of UPS Room if required.


2. Location of Control Panels and all the Distribution Boards.
3. Complete Details of the Elevators if proposed to be installed inside the
Auditorium.
4. Location of Underground Water Tank.
5. Location of Overhead Water Tank.
6. Location of the Pumps and Motors etc. for Drinking Water as well as Grey
Water for Flushing etc.
7. Details of Rain Water Harvesting System.
8. Details of Drinking Water Fountains etc.
9. Fire Detection and Alarm System with interfacing details with the other
Services.
10.Proposal for Beam Detectors if any.
11.Fire Pump Room Installations.
12.Water Requirement for the Fire Demand and location of the Fire Water
Tank.
13.Fire Hydrants and Push Button.
14.Location of Hose Reels.
15.Location and Type of Fire Extinguisher.
16.Details of Security Systems/ Location of Turnstiles etc.
17.Escape Route Lighting.
18.Directional Signages.
19.Location of EXIT and FIRE EXIT CFL/LED Signages etc.
20.Details of Arena / Stage Accessories, Structural Grid for Hanging the
Audio,Video,Lighting Equipment etc.
21.Details of Motorised Rigging Equipment if proposed to be provided.
22.Location of Control Room for Stage Lighting and Sound System.
23.PA System for Parking and Waiting Lounge.
24.Details of Audio Conference System for Conference Rooms and Meeting
Rooms.
25.Power Requirement for Projection System.
26.Details and Requirement of Video Conferencing Requirements if any.
27.Audio System for Stage.
28.Locations of Speakers/ Woofers etc.
29.Location of LCD Screens Motorised Screens, Projectors etc.
30.Location and Details of Motorised Screens / Curtains for Cyclorama and
Back Stage.
31.Location and Details of Podium on Stage.
32.Location of the Light and Sound Equipment in front of the Stage.
33.Location of Microphones and Location of XLR Jacks.
34.Location of Gongbells if required.
35.Details of the Lights and other Systems (electrically operated) to be backed
up by DG Set.
36.Details of the System / Equipment to be backed up by DG Set.
37.Location of DG Set.
38.Details of Intelligent Lighting Control using Sensors.
39.Details of Dimmable Lights.
40.Details of Green Room / Preparation Room along with the Furniture Details.
41.Location of Double Hand Driers in Toilets.
42.Location of the Route and Disposal Points of the AC Condensed Water
Drain.
43.Location of Janitor Place.
44.Location of Food Court / Lunch / Dinner / Hightea Space and required
electrically equipment etc.
45.Complete details of the Truss, Fabrication Details, Access Details for Routine
Maintenance etc.
46.Location and Details of the Illuminated Signages / Building Signages.
47.Details of Lightening Protection System, Grid and Route of the Conductors
etc.
48.Earthing Details, Number of Earthings Pits and Earthing Grid etc.
49.Location of Rodent Repellent above False Ceiling and in the Cavity inside
Truss Area.
50.Power Receptacles ( 6A, 6A/16A, 16A , 20A etc. ) for various facilities as
mentioned above.
51.Computer Networking Requirements Physical Cabling / Wi-Fi Wireless
Zones etc.
52.Location and Details of Registration Counters in case of Seminars etc.
53.Server Room Requirement if any.
54.Internet Access Workstations / Nodes.
55.Requirement of Lighting for Murals, Paintings, Sculptures etc.
56.Requirement of Business Room with Reprographing Facilities etc.
57.Location of Control Room for AC and Group Controllers for Remote Control.
58.Pantry Power Requirements.
59.Location fot Mobile Charging Facilities for Visitors / Audience.
60.Cubicals for Local Assistance etc.
61.Location of Central Chandelier if proposed.
62.Cross Section above False Ceilings for an integration of various Building
Services.
63.Internet connectivity nodes if proposed with locations.
64.Complete details of underfloor race ways.
65.Complete details and location of the Service Ducts/ Vertical Risers etc.
66. Location and number of Sensors for CO2
67. Additional Points which should also be incorporated in the design and drawings.

1. Location of Telephone Points.


2. Location of Lounge TV Points if proposed.

3. Foundation Details for VRV/VRF Outdoor Units.

4. Route of Copper Piping.

5. Service Entrance Details for Power, Telephone Cables , Lighting Control Cables for
Exterior Lighting,Fiber Optic Cable for CampusNetworking Requirements etc.

6. Lighting Controls.

7. Location of CCTV Cameras if proposed.

8. Details of BMS if proposed.

68. Acoustic Details are also required to be taken care of in Plan and Elevation.

69. Weight of the Metal Halide Light Fittings in Roof Level Ceiling may get bent because
of the weight of the Light Fitting and Humidity.Ballasts may be mounted with the
Truss / Structure.

70. Any proposal to insulate the Roof to reduce Heat Load?

71. Accessibility and Ramp for Physically Chalanged Persons for all the areas to be
checked.

72. Route for Fire Escape from all the Areas may please be reconfirmed.

73. Wherever possible, Green Ideas may be implemented if agreed to.

74. We also need to confirm the illumination level for each area.