The Attaka subsea development in Indonesia was the first of its kind in Asia for Chevron (Unocal) and included 8 subsea trees installed between 1981-1989. The trees were installed on wells 2-4 km offshore from host platforms in water depths around 60m and were connected via flowlines to the platforms. The project was a joint venture between Unocal and Inpex and helped develop the Attaka oil and gas field.
The Attaka subsea development in Indonesia was the first of its kind in Asia for Chevron (Unocal) and included 8 subsea trees installed between 1981-1989. The trees were installed on wells 2-4 km offshore from host platforms in water depths around 60m and were connected via flowlines to the platforms. The project was a joint venture between Unocal and Inpex and helped develop the Attaka oil and gas field.
The Attaka subsea development in Indonesia was the first of its kind in Asia for Chevron (Unocal) and included 8 subsea trees installed between 1981-1989. The trees were installed on wells 2-4 km offshore from host platforms in water depths around 60m and were connected via flowlines to the platforms. The project was a joint venture between Unocal and Inpex and helped develop the Attaka oil and gas field.
Contract Award: 1981 (#11, #14, #E-1) No. Trees: 3 (#11, #14, #E-1) Unocal 50% 1984 (#J-1A, #J-3) 2 (#J-1A, #J-3) Inpex 50% 1989 (#24, #29) 2 (#24, #29) 1989 (Sepinggan So. #1) 1 (Sepinggan So. #1) Sales: Singapore Water Depth: 60 m (210 ft) Fabrication: Singapore Tree Type: Vertical Service Base: Singapore Tree Pressure: 5,000 psi Host Type: Platform Tree Bore Size: 3x2 Contract Type: EPC Hydrocarbon: Oil and Gas ASIA Scope of Work Comments 4 Eight (8) vertical 3x2 5,000 psi subsea trees The subsea wells at Attaka are completed with 4 production pipelines, 4 gas-lift lines and a direct hydraulic 5-function control 4 UWD 18-3/4 10,000 psi subsea wellheads with clamp umbilical. The subsea wells are located 2 to 4 km (1 to 2 miles) hub profile from the host platforms in the Attaka Field. 4 5,000 psi manual lower master actuated FSC, upper master, swab, production wing and flowline isolation valves FMC Technologies installed the initial three (3) subsea systems, Attaka 11, 14 and E-1 in 1981. These were followed by the next 4 Fail-safe closed 2 5,000 psi annulus gas-lift and two (2) trees, Attaka J-A1 and J-3 in 1984, with the final three (3) chemical-injection valves systems delivered in 1989 on Attaka wells 24 and 29, along with 4 Fail-safe closed 1 12,000 psi DHCVs the Sepinggan South 1. 4 Flanged flowline connection outlets prepared for pipe tie-in 4 10-3/4 and 18-1/2 tubing hangers 4 Direct hydraulic controls 4 System integration, testing, installation assistance, service and maintenance
Worldwide Headquarters: Regional Sales Office:
FMC Technologies FMC Technologies 1803 Gears Road Southeast Asia Pte. Ltd. Houston, TX 77067 USA 149 Gul Circle Phone: +1 (281) 591 4000 Singapore 629605 Fax: +1 (281) 591 4291 Phone: +65 6861 3011 Fax: +65 6862 0527