Vous êtes sur la page 1sur 32

A report on

Restoration
of hydrogen-heater
tubes

By: Moaddab Talebzadeh


Shiraz Oil Refining Company

Contents

1) Heater Properties

2) Tubes Repair and Restore Method

3) Confirmation of Research Institute of


Petroleum Industry (RIPI)

4) Additional Value Produced by This Method

1
Section 1

Heater Properties

Heater Properties

Hydrogen-heater of Shiraz
refinery was designed by
FOSTER WHEELER Company
and it has been worked since
1973.

2
Heater Properties
Number of tubes 74
Tube material ASTM A297
Tube positions HK40
Inlet flange material vertical
Outlet flange A 182 F11
material A-105
Filler material ER-INCONEL
Flange type RTJ WN

Heater Properties

In designing of this heater,


the outlet flanges was put
outside the combustion
chamber to make their
temperature near ambient
temperature.

3
Heater Properties

In the other hand, gas and


vaporized water inside the
tubes permeate in this zone
and they make corrosion in
weaker metal.

Heater Properties
As the outlet flange was made by carbon
steel, heat affected area of weld (HAZ)
between flange and tube is susceptible to
be corroded and from this area the weld
become weaker and consequently holed.

4
Heater Properties

Because of complicated
designing of heater and
difficult access to damaged
point , repairing of downer
flange in site is not possible.

Heater Properties
Necessarily, from 1973 until 2006
,62 tubes of this heater had been
changed because of corrosion in
weld in downer flanges and in
some cases these welds became
holed due to corrosion.

5
Heater Properties

These 62 tubes were keeping


in salvage yard.

Heater Properties
The number of new tubes in
our company decreased to a
small quantity and buying new
tubes made too much costs.
So we decided to restore
tubes which just affected by
corrosion in their flange welds.

6
7
8
9
Section 2

Tubes Repair and


Restore Method

10
Tubes Repair and Restore Method

1 ) At first radiographic test


applied to welds to gain
confidence that there wasn't
any other fault in welds
besides above mentioned
corrosion.

11
Tubes Repair and Restore Method

2 ) Hydrogen relieve operation


was done on welds.

12
Tubes Repair and Restore Method

3 ) Internal face of welds was


cleaned and penetrant test
applied on them.

13
14
Tubes Repair and Restore Method

4 ) After the welds were


confirmed by PT & RT, weld
area heated to 50c. Then
welding and supporting weld
between flange and tube
from inside part of tube was
done.

15
Tubes Repair and Restore Method

5 ) Welding was done by using


E-INCONEL (E-NICRFE3 )
filler.

16
Tubes Repair and Restore Method

6 ) Then the face of weld got


cleaned until it became flat
and the internal face of tube
became flat and smooth.

17
18
Tubes Repair and Restore Method

7 ) Again, PT was applied after


smoothing the internal face
of each tube.

19
Tubes Repair and Restore Method

8 ) RT was applied and


confirmed.

20
21
Tubes Repair and Restore Method

9 ) After confirmation of PT &


RT,
RT position of ring in faces
of both flanges ,which
affected by corrosion, lathed
and corrected by FLANGE
FACER machine.
machine

22
Tubes Repair and Restore Method

10 ) Then, hydrostatic pressure


test did for each tube to 40
kg/
cm2 . The results were okey.

23
Tubes Repair and Restore Method

11 ) After confirmation of weld,


faces of two coupling on tube
were corrected by grinding.

24
Tubes Repair and Restore Method

12 ) By installing wooden plug,


plug
inner parts of coupling were
protected.

Tubes Repair and Restore Method

13 ) To prevent corrosion during


keeping tubes in stoke, face of
flanges was greased and
covered by galvanized plates.
plates

25
Section 3

Confirmation of Research
Institute of Petroleum
Industry (RIPI)

26
Confirmation of Research Institute of
Petroleum Industry (RIPI)

To get confidence about this


repairing method, one restored
tube was sent to RIPI .

Confirmation of Research Institute of


Petroleum Industry (RIPI)

The RIPI confirmed this


repairing method by relying on
results of RT,
RT PT and
hydrostatic test.
test

27
Section 4

Additional Value
Produced by This Method

Additional Value Produced


by This Method

According to RIPI report, these


tubes will have 50,000 working
hours life regarding to creep
phenomena, carborizing and
changing in metallurgy of metal
irrespective of flange corrosion.

28
Additional Value Produced
by This Method

New tubes are designed with


100,000 working hour life.

Additional Value Produced


by This Method

A new HK 40 tube approximately


costs 11,000, in 2006.
So, for 50,000 working hour of a
new tube,5500 Euro should be
paid.

29
Additional Value Produced
by This Method

Repairing and restoration cost of


each tube, including inspection
costs, repairing costs, welding,
tests and consumer goods and
,is equal to 16,500,000Rials.

Additional Value Produced


by This Method

So, for 62 tubes economic saving is


equal to:
70,000,000 - 16,500,000 = 53,500,000Rials
53,500,000 62 = 3,317,000,000Rials

30
Additional Value Produced
by This Method

Economic saving
=
261,000
according to prices of 2006

Questions?

31
Thanks for your
attention