Scrub and Reload for Windows 3.

11
1. Scrub the NCK (left side of NCK/PLC)
a. Set switch S3 to position 1.
b. Press blue reset button.
c. Wait for green led (left side) and 6.
d. Set S3 to position 0.

2. Scrub the PLC (right side of NCK/PLC)


a. Set the S4 switch to position 3.
b. Press blue reset button.
c. Wait for 6 and two red LEDs, PS is flashing PF stays solid.
d. Set S4 to position 2. In 2-3 seconds, set S4 back to position 3.
(Count One thousand one, One thousand two, etc.)
e. After the red PS LED blinks six times, goes out, and then comes on
solid. Set S4 back to position 0.
f. (If the previous step is not done right, at this point, you wont see the 6
and 2 green LEDs. You must start over from step 1.)

3. Load NCK
a. Press focus key1-5-3.
b. Press <NCU first load> soft key.
c. Enter password. (Minutes on the clock followed by 530) Ex. If the clock
shows 9:32 a.m. the password would be 32530.
d. Answer <Yes> to save data questions.
e. Wait till you see NCK load is finished message.(about 5-10 min)
4. Load PLC
a. Press <PLC load> soft key.
b. Enter password (minutes +530).
c. Answer <Yes> to any save data questions.
d. Wait for PLC load is finished message. .(about 5-10 min)
e. Wait 20 seconds, the front panel buttons should stop flashing;
otherwise go to step 4 again.

5. Activate PLC configuration data


a. Press focus key 1-5-4.
b. Press <Abort> (or <Cancel>) when message box appears (Note: Never
press the <OK> button).
c. Highlight the machine model in the list that appears.
d. Press <Applications>, then enter password (minutes + 530).
e. Verify machine configuration, press <Save values> soft key, and then
press <Yes>.
f. After all data has been saved, the control panel lights will stop blinking.
Exit windows and then turn main switch OFF.
g. Start machine up according to the standard procedures.

1
Scrub and Reload for Windows 3.11 (Build 288+)
1. Scrub the NCK (left side of NCK/PLC)
a. Set switch S3 to position 1.
b. Press blue reset button.
c. Wait for green led (left side) and 6
d. Set S3 to position 0.

2. Scrub the PLC (right side of NCK/PLC)


a. Set the S4 switch to position 3.
b. Press blue reset button.
c. Wait for 6 and two red LEDs, PS is flashing PF stays solid.
d. Set S4 to position 2. In 2-3 seconds, set S4 back to position 3.
(Count One thousand one One thousand two, etc.)
e. After the red PS LED blinks six times, goes out, and then comes on
solid. Set S4 back to position 0.
f. (If the previous step is not done right, at this point, you wont see the 6
and 2 green LEDs. You must start over at step 1.)

2. Load NCK
a. Press focus key 2-4-2-6 to exit BOF.
b. Enter password, then press <Exit>.
ECHTZEIT
c. Go to Program Manager, press <Service Tools> and then double click
on <Software Load Variente> soft key.
d. Change language to English by pressing focus key 4-2.
e. Press <Load NCK> soft key.
f. Press <Load device> soft key. Enter password minutes 530 and wait
for the data to be transferred.
g. Wait till you see NCK load is finished message. .(about 5-10 min)

3. Load PLC
a. Press <Previous>.
b. Press <Load PLC> soft key.
c. Press <Load device> soft key. Enter password and wait for the data to
be transferred. .(about 5-10 min)
d. Wait 20 seconds, the front panel buttons should stop flashing,
otherwise go to step 4 again.
e. Press <Previous> and <End Program>

4. Activate PLC configuration data


a. Shut down and restart windows
b. Press focus key 1-5-4.
c. Press <Cancel> when message box appears. (Note: Never press the
OK button.)
d. Highlight the machine model in the list that appears.
e. Press <Applications>, and then enter password (minutes + 530).
f. Verify machine configuration, then press <Save values> soft key.
g. After all data has been saved, the control panel lights will stop blinking.
Exit windows and then turn main switch OFF.
h. Start machine up according to the standard procedures.

2
Scrub and Reload for Windows NT
1. Scrub the NCK (left side of NCK/PLC)
a. Set switch S3 to position 1.
b. Press blue reset button.
c. Wait for green led (left side) and 6.
d. Set S3 to position 0.

2. Scrub the PLC (right side of NCK/PLC)


a. Set the S4 switch to position 3
b. Press blue reset button.
c. Wait for 6 and two red LED, PS is flashing PF stays solid.
d. Set S4 to position 2. In 2-3 seconds, set S4 back to position 3.
(Count One thousand one, One thousand two, etc.)
e. After the red PS LED blinks six times, goes out, and then comes on
solid. Set S4 back to position 0.
f. (If the previous step is not done right, at this point, you wont see the 6
and 2 green LED. You must start over at step 1.)

3. Load NCK
a. Press focus key 2-4-2-6 to exit BOF.
b. Enter password, press <Exit>.
c. Press <Update> soft key on the upper right hand corner.
d. Press <Config. NCK/PLC> soft key. Enter password (Contact Trumpf)
e. Change language to English by pressing focus key 4-2.
f. Press <Load NCK> soft key.
g. Press <Load device> soft key. Enter password and wait for the data to
be transferred.
ECHTZEIT
h. Wait for NCK load is finished message. .(about 5-10 min)

4. Load PLC
a. Press <Previous>
b. Press <Load PLC> soft key.
c. Press <Load device> soft key. Wait for the data to be transferred.
d. Wait 20 seconds, the front panel buttons should stop flashing,
otherwise go to step 4 again. .(about 5-10 min)
e. Press <Previous> and <End Program>

5. Activate PLC configuration data


a. Shut down and restart windows
b. Press focus key 1-5-4.
c. Press <Abort> when message box appears. (Note: Never press the
OK button.)
d. Highlight the machine model in the list that appears.
e. Press <Applications> soft key then enter password (minutes + 530).
f. Verify machine configuration then press <Save values> soft key.
g. After all data has been saved the control panel lights will stop blinking.
Exit windows and then turn main switch OFF.
h. Start machine up according to the standard procedures.

3
Scrub and Reload for Windows NT Release v6.01 +
3. Scrub the NCK (left side of NCK/PLC)
a. Set switch S3 to position 1.
b. Press blue reset button.
c. Wait for green led (left side) and 6.
d. Set S3 to position 0.

4. Scrub the PLC (right side of NCK/PLC)


a. Set the S4 switch to position 3
b. Press blue reset button.
c. Wait for 6 and two red LED, PS is flashing PF stays solid.
d. Set S4 to position 2. In 2-3 seconds, set S4 back to position 3. (Count One thousand
one, One thousand two, etc.)
e. After the red PS LED blinks six times, goes out, and then comes on solid. Set S4 back to
position 0.
f. (If the previous step is not done right, at this point, you wont see the 6 and 2 green LED.
You must start over at step 1.)

6. Load NCK
a. Press focus key 2-4-2-6 to exit BOF.
b. Enter password, press <Exit>.
c. Press <Update> soft key on the upper right hand corner.
d. Press <Config. NCK/PLC> soft key. Enter password (Contact Trumpf)
e. Change language to English by pressing focus key 4-2.
f. Press <Load NCK> soft key.
g. Press <Load device> soft key. Enter password and wait for the data to be transferred.
h. Wait for NCK load is finished message. .(about 5-10 min)

7. Load PLC
a. Press <Previous>
b. Press <Load PLC> soft key.
c. Press <Load device> soft key. Wait for the data to be transferred.
d. Wait 20 seconds, the front panel buttons should stop flashing, otherwise go to step 4 again.
.(about 5-10 min)
e. Press <Previous> and <End Program>

8. Activate PLC configuration data


a. Shut down and restart windows
b. Press focus key 1-5-4.
c. Press <Abort> when message box appears. (Note: Never press the OK button.)
d. Highlight the machine model in the list that appears.
e. Press <Applications> soft key then enter password (minutes + 530).
f. Verify machine configuration then press <Save values> soft key.
g. After all data has been saved the control panel lights will stop blinking.
h. Press the Hardware Config soft key
i. Wait for the configuration to be displayed, then accept values
j. Exit the BOF focus key 2-4-2-6
k. Enter password, press <Exit>.
l. Press <Update> soft key on the upper right hand corner.
m. Press <Config. NCK/PLC> soft key. Enter password (Contact Trumpf)
n. Change language to English by pressing focus key 4-2.
o. Press <Load PLC> soft key.
p. Press <Hardware Load> soft key
q. Wait
r. Press <Previous> and <End Program>
s. Exit windows and then turn main switch OFF.
t. Start machine up according to the standard procedures.

4
Note: If you dont see 2 green lights and a 6:
1. Disconnect the MPI buses, scrub and reload NCK & PLC again.
2. Disconnect drive bus, scrub and reload NCK & PLC again.
3. If you still dont have the 2 green lights and a 6, replace the NCU board.

Note: With older software, when loading the NCK you will see a yellow bar indicating the loading progress. With
the Software Load Tool (see chart below) you wont see the yellow bar. The important thing to look for when
loading the NCK is the four ECHO.RESETs. When it machine is loading ECHO2.RESET, the red LEDs on the
drives go out and stay out. If not then you may have:
1. Corrupt data coming from MMC to the NCU
2. Bad drive module
Lasers with software 4.7 - BOF
Lasers with software 4.7 + Software Load Tool
NT machines with TOS (i.e., TC 5/6000) Software Load Tool
BOF

Note: Important thing to look for when loading the PLC is the DOWNPLCFB30.PCL data entry. When it is
reloading, the speed of the yellow bar should go slowly, the process would take approximately 3 to 5 minutes.
When finished, the Power On key on the MSTT should blink, the Reference key should be steady and a
FEEDHOLD is present. PLC has been successfully reloaded.

How to determine your machine build number?

Menu key 2-4-1


Read the build number
Anything equal or great then 288 uses the Software Variante Load Tool.
All WinNT machine are build 288 or greater!

It is normal to get machine errors in red box or skip step messages, during the software load.
Simply press ok or skip step