Académique Documents
Professionnel Documents
Culture Documents
PRIMER TRABAJO
Sp = S1*(0.64+0.36W/h)
S1 = K/0.9144^0.5
S1= 26,731.38
(W + B ) 2
Sp= g*h*( W2
)
Datos:
H=220 m
G=9.81 m/s2
W= 23 m
L= 23 m
= 4.2 TM/m3
B= 63.25 m
Sp= 68,943.93
F= 1.53
Numero de Blocks = 12
Longitud de Blocks = 50 m
Altura de Blocks = 50 m
Potencia de Veta = 1.20 m
Burden = 0.60 m
Densidad de Mineral = 3.80 TM/m3
Rendimiento Perforacin = 43 Tal/ guardia