24. BOP STACK PRESSURE TEST


Pressure during Exposure to uncontrolled 3 C C3(P) Conduct dedicated safety meeting on job planning, Call trained base
testing release of high pressure / hazards associated with the job and HSE controls in first-aiders & offer
struck by uncontrolled MED place. 1(P) first aid.
movement of hoses Ensure that appropriate Risk Assessment has been
Risk carried out prior to commencement of task. Call Client
Pumping at high Emergency number
pressure Cordon off the area as No Go Zone Area and do Low
not allow anybody to be passing through this zone. (5555) / in case of
Risk
No crewman are permitted on or near BOP serious injury
during pressure testing.
All crewman must be well clear of sub-structure Report the incident to
high pressure lines and equipment during Gulf Energy Mgt &
pressure testing. Client.
The line test pressure and limits during a job should
be discussed with the client DSV before testing. Refer to Gulf Energy
Do not use any damaged or faulty chicksan HSE Manual Ch. 8
Never hammer on or break any chicksan containing Emergency
pressure. Response Procedure

31 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

25. POWER TONG CALIBRATION PROCEDURE


High Pressurized Exposure to uncontrolled 4 C C4(P) Conduct dedicated safety meeting on job planning, Call trained base
Lines release of high pressure / hazards associated with the job and HSE controls in first-aiders & offer
struck by uncontrolled place.Ensure that appropriate Risk Assessment has 1(P) first aid.
movement of hoses. been carried out prior to commencement of task.
MED Prior to use, all lifting equipment to be visually Call Client
Drop object Fatality of Bodily injury from Risk inspected for correct color coding, SWL and Emergency number
test certificates and any apparent damage. Low
pressurized equipment (5555) / in case of
Pinch points All tools used at height must have safety Risk
lines attached to the users belt. serious injury
Turn power off while working on power
Report the incident to
Imbalanced load equipment tong.
Poor maintained lifting Maintain proper house keeping. Gulf Energy Mgt &
damage Client.
gears Handle the equipment from designated
holding/handling areas
The drillers view of the blocks or drill-string Refer to Gulf Energy
must never be blocked. HSE Manual Ch. 8
Hand & finger injuries
Accidental lever Emergency
amputation
activation Response Procedure

32 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

33 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

26. PULLING A SUCKER ROD STRING


Elevated Loads in Dropped objects 4 C C4(P) Conduct dedicated safety meeting on job planning, Call trained base
Crane or /Hydraulic hazards associated with the job and HSE controls in first-aiders & offer
Winch Operations. place.Ensure that appropriate Risk Assessment has 1(P) first aid.
been carried out prior to commencement of task.
Working at Heights Bodily injury MED Prior to use, all lifting equipment to be visually Call Client
Heaavy Moving Risk inspected for correct color coding, SWL and Emergency number
Tubulars test certificates and any apparent damage. Low
(5555) / in case of
Never overload the crane. Always operate the Risk
Unsafe Fall from height crane with the stabilizer. serious injury
Draw-works Never walk or stand underneath the
Report the incident to
Hoisting crane load. Use tag lines.A safety
harness must be worn for all work Gulf Energy Mgt &
Equipment
Hand and finger injuries over 2 m height. Client.
Unsafe Tongs, All tools used at height must have safety
lines attached to the users belt. Refer to Gulf Energy
Slips and
Never hammer on ordinary tools. HSE Manual Ch. 8
Elevators Electrocution Never apply excessive force to tools. Emergency
Unsafe Manual 8.Never drop or throw tools.Improper use Response Procedure
of equipment or hands and other parts of
Lifting
the body.Never block the view of the
moving equipment controller.
Unsafe Electrical
Crown safety devices is correctly installed
Equipment and adjusted at start of shift.
The drillers view of the blocks or drill-string
Unsafe Rotating must never be blocked.
Equipment

34 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

27. PULLING A SUCKER ROD STRING CONTINUE


Elevated Loads in Dropped objects 4 C C4(P) Crew must not stand on the draw-works while Call trained base
Crane or /Hydraulic the drum is moving. first-aiders & offer
Winch Operations. Use correct racking method by 1(P) first aid.
derrickman
Working at Heights Bodily injury MED Do not pull string out to fast. Call Client
Heaavy Moving Risk Inspect trip tank and hoses before starting to Emergency number
Tubulars pull string out. Low
(5555) / in case of
Crew must never stand or work under loads or Risk
Unsafe Fall from height serious injury
equipment just supported by hydraulic
Draw-works machinery.
Report the incident to
Hoisting No adjustment or repairs are to take place to
hydraulic equipment without first isolating the Gulf Energy Mgt &
Equipment
Hand and finger injuries power supply and bleeding off trapped hydraulic Client.
Unsafe Tongs, pressure.
Wearing hearing protection in high noise Refer to Gulf Energy
Slips and
areas. HSE Manual Ch. 8
Elevators Electrocution Emergency
Unsafe Manual Response Procedure
Lifting

Unsafe Electrical
Equipment

Unsafe Rotating
Equipment