EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO
PESO TOTAL
UNITARIO PARCIAL VOLUMEN TOTAL (M3)
(KG)
EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO
PESO TOTAL
UNITARIO PARCIAL VOLUMEN TOTAL (M3)
(KG)
EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO
PESO TOTAL
UNITARIO PARCIAL VOLUMEN TOTAL (M3)
(KG)
448 TAPON HEMBRA PVC-PESADO P/DESAGUE 4 (PERFORADA) und 8.0000 0.30 2.40 2.40
454 TECNOPOR DE 2.44 x 1.24 x 1/2" pln 4.5000 0.40 1.80 1.80 -
461 TEE PVC SAP 90 1.1/4" und 1.0000 0.05 0.05 0.05
467 TENSOR GANCHO OJO 5/16X9.3/4" DE ACERO GALVANIZADO und 2.0000 0.05 0.10 0.10
469 TERMINAL COMP. BARRIL STD. CU 70MM2 AWG 150A, SPAT pza 25.0000 0.02 0.50 0.50
471 THINNER gal 5.5000 3.78 20.79 20.79
478 TIRADOR DE ALUMINIO L=10 CM und 62.0000 0.01 0.62 0.62
479 TIRAFON DE 1/4" X6" und 302.0000 0.01 3.02 3.02
481 TOMACORRIENTE BIPOLAR DOBLE und 4.0000 0.01 0.04 0.04
486 TRAMPA PVC SAP DE 2" und 17.0000 0.02 0.34 0.34
489 TUBERIA CONDUIT EMT DE 20MM X 3M und 66.0000 1.20 79.20 79.20
503 TUBERIA PVC SAP C-5 S/P DE 4" X 5 m (BAJADA DRENAJE) m 8.0000 1.41 11.28 11.28 -
505 TUBERIA PVC-SAP ELECTRICA DE 1" X 3 m (35 mm) und 5.0000 1.19 5.93 5.93
511 TUBO DE FIERRO CROMADO D=1 1/2" (AGARRADERA) m 3.1500 0.30 0.95 0.95
512 TUBO PROLONGACION PARA DESAGUE BRONCE/CROM 1 1/4"X5"C/TUERCA pza 8.0000 0.20 1.60 1.60
514 UNION CONDUIT DE 3/4" (20 mm) und 88.0000 0.10 8.80 8.80
515 UNION FLEXIBLE PARA TUBERIA PVC UF 160MM-S20 und 3.0000 0.86 2.58 2.58
516 UNION FLEXIBLE PARA TUBERIA PVC UF 200MM-S20 und 4.0000 0.86 3.44 3.44
518 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1" und 2.0000 0.25 0.50 0.50
519 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1" und 2.0000 0.39 0.77 0.77
531 VALVULA CHECK 1 1/4" CON CANASTILLA und 2.0000 0.45 0.90 0.90
542 VENTANA ALTA DE MADERA CON MARCO DE MADERA TORNILLO CON BARROTES DE SEGURIDAD m2D 9.2000 8.73 80.32 80.32 -
543 VENTANA BAJA DE MADERA CON MARCO DE MADERA TORNILLO CON BARROTES DE SEGURIDAD m2 70.4000 8.73 614.59 614.59 -
544 VENTANA DE MADERA CON MARCO DE MADERA TORNILLO CON BARROTES DE SEGURIDAD DE m2FIE 0.5000 8.73 4.37 4.37 -
545 VENTANA DE MADERA CON MARCO DE MADERA TORNILLO CON MALLA MOSQUITERO, INCL. INSm2 0.5000 8.73 4.37 4.37 -
548 VIDRIO CRUDO DE 8mm. INC. LAMINA DE SEGURIDAD P/VENTANA. p2 745.0000 1.85 1,378.25 1,378.25
37,247.53 37.60
37.248
FLETE
INSUMOS PUESTO EN
OBRA
PESO VOLUMEN
TOTAL (KG) TOTAL (M3)
FLETE
INSUMOS PUESTO EN
OBRA
PESO VOLUMEN
TOTAL (KG) TOTAL (M3)
FLETE
INSUMOS PUESTO EN
OBRA
PESO VOLUMEN
TOTAL (KG) TOTAL (M3)
60.00 -
-
EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO
MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO UCAYALI"
FLETE
PESO TOTAL A
LUGAR A LUGAR B COSTO POR TN (S/.) COSTO TOTAL
TRANSPORTAR (TN)
ESTIBAJE
ESTIBAJE COSTO ESTIBAJE
PESO DE BOLSA DE
PESO TOTAL (KG) EQUIVALENTE BOLSA DE CEMENTO COSTO TOTAL
CEMENTO (KG)
(VECES) (S/.)
5,942.64 42.50 140 0.50 69.91
COSTO TOTAL
(a) FLETE TERRESTRE 2,173.61
EN PESO (S/.)
FLETE
VOLUMEN TOTAL A
LUGAR A LUGAR B COSTO POR M3 (S/.) COSTO TOTAL
TRANSPORTAR (M3)
ESTIBAJE
COSTO TOTAL
(b) FLETE TERRESTRE 8,851.30
EN VOLUMEN (S/.)
1.1.c. COSTO FLETE TERRESTRE TOTAL (a+b) inc. ESTIBAJE S/. 11,024.91
FLETE
PESO TOTAL A
LUGAR A LUGAR B COSTO POR TN (S/.) COSTO TOTAL
TRANSPORTAR (TN)
ESTIBAJE
ESTIBAJE COSTO ESTIBAJE
PESO DE BOLSA DE
PESO TOTAL (KG) EQUIVALENTE BOLSA DE CEMENTO COSTO TOTAL
CEMENTO (KG)
(VECES) (S/.)
194,104.02 42.50 4,567 0.50 2,283.58
COSTO TOTAL
(a) FLETE TERRESTRE 60,514.78
EN PESO (S/.)
FLETE
VOLUMEN TOTAL A
LUGAR A LUGAR B COSTO POR M3 (S/.) COSTO TOTAL
TRANSPORTAR (M3)
ESTIBAJE
COSTO TOTAL
(b) FLETE TERRESTRE 15,791.88
EN VOLUMEN (S/.)
1.2.c. COSTO FLETE FLUVIAL TOTAL (a+b) inc. ESTIBAJE S/. 76,306.66
ESTIBAJE
ESTIBAJE COSTO ESTIBAJE
PESO DE BOLSA DE
PESO TOTAL (KG) EQUIVALENTE BOLSA DE CEMENTO COSTO TOTAL
CEMENTO (KG)
(VECES) (S/.)
194,104.02 42.50 4,567 0.50 2,283.58
COSTO TOTAL
(a) FLETE RURAL EN 2,283.58
PESO(S/.)
C.P.
TAMBO 0.45
TOMIROMASHE
ESTIBAJE
COSTO TOTAL
(b) FLETE RURAL EN 1,291.03
VOLUMEN (S/.)
1.3.c. COSTO FLETE RURAL TOTAL (a+b) inc. ESTIBAJE S/. 3,574.61
499.00 ASFALTADO 10 TN
499.00 ASFALTADO 10 TN
42.00 ASFALTADO 10 TN
EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO
MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO UCAYALI"
42.00 ASFALTADO 30 TN
2800
0.0178571429
OBSERVACION
MANUAL
EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO
MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO UCAYALI"
EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO
MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO UCAYALI"
EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO
MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO UCAYALI"
EXPEDIENTE TECNICO : "CREACION DEL CENTRO DE SERVICIOS TAMBO EN EL CENTRO POBLADO DE TONIRO
MASHI, DISTRITO DE TAHUANIA, PROVINCIA ATALAYA, DEPARTAMENTO UCAYALI"