Vous êtes sur la page 1sur 29

www.risk-technologies.com ; www.stw.

de

Projekat:
Saradnja sa Naftnom industrijom Srbije
Collaboration with Petroleum Industry of Serbia

Project:
RiskNIS: Risk management and use of risk-based approaches
in inspection, maintenance and HSE analyses
of NIS a. d. plants
(http://www.risknis.risk-technologies.com/)

RBI
Risk-Based Inspection
Qualitative Risk Assessment
Unit level

Version 2.0,
Status: Intermediate Draft

Risk before

Risk after

Novi Sad, Beograd, Stuttgart


August 2007

STEINBEIS Foundation (www.stw.de) NIS-NAFTNA INDUSTRIJA SRBIJE (www.nis.yu)


Steinbeis Advanced Risk Technologies R-TECH

Contacts

Prof. Dr. A. S. Jovanovic, Director


Steinbeis Advanced Risk Technologies
Haus der Wirtschaft, Willi-Bleicher-Strae 19,
D- 70174 Stuttgart, Germany
Phone: +49 (711) 1839-781, +49 (172) 635 9190
Fax: +49 (711) 677 0605
E-mail: jovanovic@risk-technologies.com
www: www.risk-technologies.com
Prof. dr Petar Stanojevi, R&D Director,
NIS-Petroleum Industry of Serbia
Narodnog fronta 12, 21000 Novi Sad, Serbia
Phone: +381 (21) 481-2202, +381 (
Fax: +381 (21) 481 4485
E-mail: petar.stanojevic@nis.yu
www: www.nis.yu
Ms. Radmila Guntrum, dipl. ing,
Local Steinbeis office
Milentija Popovica 2, Novi Beograd
Phone: +381 (11) 311 2121, +381 (63) 889 1328
E-mail: guntrum@risk-technologies.com

RiskNIS RBI Qualitative Unit-Based page 2


Steinbeis Advanced Risk Technologies R-TECH

Executive Summary

The purpose of this document is to present the results of the Qualitative RISK
Assessment on the level of units of 3 NIS Plants (Panevo, Novi Sad, Elemir), thus giving
an overview of the overall criticality of units and benchmarking the units among
themselves. The RBI analysis has covered 60 process and auxiliary units. This report
gives an overview of the results that are still subject to verification.

Applied methodology used for this purpose is API PUBL 581, Risk-Based Inspection Base
Resource Document, 2000 Edition, APPENDIX A-WORKBOOK FOR QUALITATIVE RISK-
BASED INSPECTION ANALYIS, extended to environmental, business and reputation
consequences categories.

This document gives the description of methodology applied, performed activities, results
and conclusions and recommendations.

The results given are in DRAFT status, subject to further verification from the plants.
Some of the assessment is clearly to be judged as unconfirmed, therefore, the relatively
high levels of risks associated with number of units is more due to the unknown data and
conservatism in the approach then to the real situation in the field.

13, 17, 20, 21,


22, 25, 35, 36,
4 5 10, 11 12, 52
37, 39, 41, 45,
L
46
I
K
E
19, 23, 24, 26,
L 1, 2, 3, 4, 6, 44, 8, 18, 30, 31, 32,
3 16, 43 27, 29, 42, 53,
I 49, 55, 56, 57 47, 50, 51, 58
54
H
O
O
D
2 48, 60, 61 28, 34 38, 40, 59

1 7, 9, 14 33 15

A B C D E

CONSEQUENCES

Figure 1 Preliminary results of API Qualitative Analysis with 60 units

RiskNIS RBI Qualitative Unit-Based page 3


Steinbeis Advanced Risk Technologies R-TECH

Executive summary (Serbian)

Namena ovog dokumenta je da prezentira rezultate kvalitativne analize rizika na nivou


postrojenja na 3 lokacije NIS-a (Panevo, Novi Sad, Elemir), da da pregled kritinosti
postrojenja i da omogui meusobno poreenje postrojenja. Analizom je obuhvaeno
ukupno 60 procesnih i pomonih postrojenja.

Primenjena metodologija se zasniva na API PUBL 581, Risk-Based Inspection Base


Resource Document, 2000 Edition, APPENDIX A-WORKBOOK FOR QUALITATIVE RISK-
BASED INSPECTION ANALYIS, proirena sa procenom posledica po okolinu, poslovanje i
reputaciju firme.

Dokument sadri opis primenjene metodologije, pregled sprovedenih aktivnosti, rezultate


analiza i zakljuke i preporuke za dalji rad.

Dati rezultati imaju status DRAFT, odnosno podaci su nepotvreni, a potvrda je planirana
sa predstavnicima postrojenja. Zbog ovih injenica, relativno visoki nivoi rizika odreenih
za vei broj postrojenja je vie rezultat nedostupnosti podataka i konzervativnosti
kvalitativnog pristupa nego to predstavlja realnu situaciju na terenu.

RiskNIS RBI Qualitative Unit-Based page 4


Steinbeis Advanced Risk Technologies R-TECH

Status of the current document


Draft, after first round of evaluation.

RiskNIS RBI Qualitative Unit-Based page 5


Steinbeis Advanced Risk Technologies R-TECH

Table of Contents

Contacts 2

Executive Summary ............................................... 3

Executive summary (Serbian) ................................. 4

Status of the current document ............................... 5

Table of Contents .................................................. 6

List of Figures ....................................................... 7

List of Tables ........................................................ 8

List of Acronyms.................................................... 9

Introduction.........................................................10

Performed activities ..............................................11

Results ...........................................................15

Conclusions and recommendations..........................27

References ..........................................................28
Annex 1 Example of Qualitative Workbook in Serbian........ 29

RiskNIS RBI Qualitative Unit-Based page 6


Steinbeis Advanced Risk Technologies R-TECH

List of Figures
Figure 1 Preliminary results of API Qualitative Analysis with 60 units
........................................................................ 3

Figure 2 Web-based tool implementing API 581 Qualitative RBI


Workbook (English)........................................... 11

Figure 3 Web-based tool implementing API 581 Qualitative RBI


Workbook (Serbian) .......................................... 12

Figure 4 Project web-site Member area.............................. 12

Figure 5 Overall Qualitative Risk Matrix for all three NIS Plants (RNP,
RNS, RGE) ....................................................... 16

Figure 6 NIS Overall Damage matrix for all three units (RNP, RNS,
RGE) ............................................................... 16

Figure 7 NIS Overall Health matrix for all three units (RNP, RNS, RGE)
...................................................................... 17

Figure 8 NIS Overall Environmental matrix for all three units (RNP,
RNS, RGE) ....................................................... 17

Figure 9 NIS Overall Business Consequences matrix for all three units
(RNP, RNS, RGE) .............................................. 18

Figure 10 NIS Overall Reputation consequences matrix for all three


units (RNP, RNS, RGE)....................................... 18

Figure 11 Qualitative Risk Matrix for RNP ........................... 21

Figure 12 Qualitative Risk Matrix for RNS........................... 24

Figure 13 Qualitative Risk Matrix for RGE ........................... 26

RiskNIS RBI Qualitative Unit-Based page 7


Steinbeis Advanced Risk Technologies R-TECH

List of Tables
Table 1 Unit Grouping and responsibility matrix .................. 13

Table 2 Unit overview for Qualitative Risk Matrix for all three NIS
Plants (RNP, RNS, RGE) ..................................... 19

Table 3 Unit overview for Qualitative Risk Matrix for RNP ..... 22

Table 4 Unit overview for Qualitative Risk Matrix for RNS ..... 24

Table 5 Unit overview for Qualitative Risk Matrix for RGE ..... 26

RiskNIS RBI Qualitative Unit-Based page 8


Steinbeis Advanced Risk Technologies R-TECH

List of Acronyms

Acronyms referred in the document are given below. Explanation of these acronyms can
be found from the text, where it is referred. Symbols used in the document are explained
in the text.

Term Definition
API American Petroleum Institute
CoF Consequence of failure
MTBF Mean Time Between Failure
NFPA National Fire Protection Association, USA
NDT Non-destructive testing/inspection
P&ID Process and Instrumentation Diagram
PoF Probability of failure
QRA Quantitative Risk Analysis
RBI Risk Based Inspection: methods to plan, implement and evaluate
inspections using risk based approach

RiskNIS RBI Qualitative Unit-Based page 9


Steinbeis Advanced Risk Technologies R-TECH

Introduction
In the scope of the Contract for the extension of the project (Phase II), Risk
management and use of risk-based approaches in inspection, maintenance and HSE
analyses of NIS a.d. plants, the Basic Package (see Annex 6 and Annex 7) contains RBI
analysis for 200 pieces of equipment on the qualitative level (level 1), 80 equipment on
the semi-quantitative level (level 2) and 20 pieces of equipment on the quantitative level
(level 3). Compared with the initial equipment count of about 20.000 pieces of equipment
(se Annex 7 of the contract), and in order to maximize the benefit for the client, it has
been decided to perform benchmarking of units on the qualitative level in order to
determine the best candidates for RBI implementation.

To this goal, the methodology described in the API PUBL 581, Risk-Based Inspection Base
Resource Document, 2000 Edition, APPENDIX A-WORKBOOK FOR QUALITATIVE RISK-
BASED INSPECTION ANALYIS has been applied.

The workbook presents the details of the qualitative RBI analysis procedure,.and is used
to determine the Likelihood and Consequence Category for a given unit. Depending on
the nature of the chemicals in a unit, the Consequence Category can be determined
based on the flammable or toxic hazards for the unit. Within the workbook, flammable
consequences are represented by the Damage Consequence Category, since the primary
impact of a flammable event (fire or explosion) is to damage equipment. Toxic
consequences fall under the Health Consequence Category, since their impact is usually
limited to adverse health effects.

The workbook is subdivided as follows:

Part A: Likelihood Category

Part B: Damage Consequence Category

Part C: Health Consequence Category

In cases when the unit has a number of different process fluids, the workbook exercise is
applied to the worst case from both Damage Consequence Category and Health
Consequence Category, meaning that it is not necessary that in both parts of the analysis
same amounts and natures of fluids have been considered.

An example of the offline workbook (in Serbian) is given in Annex 1.

RiskNIS RBI Qualitative Unit-Based page 10


Steinbeis Advanced Risk Technologies R-TECH

Performed activities
In order to be able to perform the given analysis, the following activities have taken place:

1. Training in RBI methodology and presentation of qualitative methods during the


Training RBI from October 30 to November 3 2006

2. First Certification RBI on November 27, 2006

3. Complete implementation of the RBI Qualitative Workbook in a form of Web-based


software tool (see Figure 2)

4. Complete translation of the software version to Serbian (see Figure 3)

5. Integration of the software tool in the project web site (Figure 4)


http://www.risknis.risk-technologies.com

6. Export facility in the software in order to allow offline completion of the


questionnaire (example of offline questionnaire is given in Annex 1)

7. Definition of units to be covered by RBI analysis and their grouping in Unit Groups
to be distributed for answering, performed during the kick-off meeting for
Feasibility Study on February 23, 2006 and on separate dedicated meetings with
RGE on May 22, 2006, RNP on May 24, 2006 and RNS on May 25, 2006 (See for
exact grouping of data Table 1)

8. Case studies with the team leaders for RGE (May 22, 2006), RNP (May 24, 2006)
and RNS (May 25, 2006), where one unit was completely analyzed for RGE and
RNP, and for all expected inputs and clarifications explained.

9. Data collection and extension of the consequences assessment beginning of July


2007

10. Individual data assessment with RNP plant unit representatives, mid-July 2007

Figure 2 Web-based tool implementing API 581 Qualitative RBI Workbook (English)

RiskNIS RBI Qualitative Unit-Based page 11


Steinbeis Advanced Risk Technologies R-TECH

Figure 3 Web-based tool implementing API 581 Qualitative RBI Workbook (Serbian)

Figure 4 Project web-site Member area

RiskNIS RBI Qualitative Unit-Based page 12


Steinbeis Advanced Risk Technologies R-TECH

Table 1 Unit Grouping and responsibility matrix

Group Responsible
Loc. Group description
summary Delegated

RGE - Procesno
RGE RGE-1 Procesno postrojenje (Process unit) Zdravko Umievi
Postrojenje

RNP Energana Energana Zori

S-300 Kataliticki reforming sa HDS (Catalytic reforming


with HDS)
RNP- S - 300
S-500 Obrada gasa (Gas concentration unit)
RNP- S - 500
S-550 Meroks TNG (LPG Merox)
RNP- S - 550
S-570 Frakcionacija
RNP- S - 570
TNG (LPG separation)
RNP RNP- S - 650 Milo Nedi
S-650 Meroks lakog benzina (Straight run naphtha
RNP- S - 1300
Merox)
RNP- S - 1520
S-1300 Sistem pare i kondenzata (Steam and
RNP-Velika
condensate)
kompresornica
S-1520 Lozivi sistem (Fuel gas)
Velika kompresornica (Compressors)

S-2300 Katalitiki kreking vakuum gasnog ulja (FCC)


RNP- S - 2300
S-2500 Obrada gasova sa frakcionacijom (Gas treatment
RNP- S - 2500
RNP with fractionation) Stevan Koari
RNP- S - 2550
S-2550 Meroks TNG (LPG Merox)
RNP- S - 2950
S-2950 Regeneracija amina (Amine regeneration)

S-200 Visbreaking
RNP- S - 200
S-900 Obrada otpadnih kiselih voda (Waste water
RNP - S- 900
RNP treatment) Vladimir Joki
RNP - S - 1500
S-1500 Vazduh (Air)
RNP - S - 1550
S-1550 Sistem zapornog ulja (Oil)

S-2400: HDS dizela (Distillate Hydrotreating - Diesel)


RNP- S 2400 S-2450: Klaus (Sulphur Recovery Unit)
RNP- S 2450 S-2600: Alkilacija (Alkylation - ASA)
RNP- S - 2600 S-2750: Meroks lakog krekovanog benzina (Light
RNP Niiforovi
RNP- S 2750 Cracked Naphtha MEROX)
RNP- S 2850 S-2850 Meroks teskog krekovanog benzina (Heavy
RNP- S - 2900 Cracked Naphtha MEROX)
S-2900 Striper kisele vode

Solventna ekstrakcija aromata (Aromatic solvent


RNP RNP- S - 3600 Mirjana Koji Petit
extraction / LLED) (Sulfolane)

RNP- S 0250
RNP Bitumen & Polimer Bitumen Zoran Todorov
RNP- S - 0290

RNP RNP- S - 2200 S-2200: Vakuumska destilacija (Vacuum distillation) Zoran Prole

S-400: HDS dizela ili mlaznog goriva ili pirolitickog


RNP- S 400
benzina (Diesel or jet fuel or pyrolysis gasoline HDS)
RNP- S 620
S-620: Ekstrakcija aromata (Aromatic solvent
RNP RNP- S 1700 Jovan Jovi
extraction)
RNP- S 2700
S-1700/2700: Mala i velika baklja (Flares)
RNP- S - 1000
S-1000: Rekuperacija gasa baklje (Flare gas recovery)

RNP- S 2100 S -2100: Velika atmosferska destilacija


RNP- S 2650 S-2650: Meroks lakog benzina
RNP- S 100 S-100: Mala atmosfreska destilacija
RNP RNP- S 600 S-600: Redestilacija D. Ivanovi
RNP- S 750 S-750: Meroks mlaznog goriva 1
RNP- S 850 S-850: Meroks mlaznog goriva 4
RNP- S - 1800 S-1800: Sistem luzine

RNS - U-2300 Goriva - Sekundarno (Fuel - Secondary)


RNS RNS - U-2400 U-2300: Postrojenje hodrotriting sa pripadajuim Mile Zori
RNS U2700 rezervoarom T-1 (Hydrotreating and tank T-1)
U-2400: Postrojenje platforming sa pripadajuim

RiskNIS RBI Qualitative Unit-Based page 13


Steinbeis Advanced Risk Technologies R-TECH

Group Responsible
Loc. Group description
summary Delegated
rezervoarom T-2 (Platforming and tank T-2)
U-2700: Pomoni sistem (Auxiliary system)

Goriva - Sekundarno
(Fuel - secondary)
U-2500 Postrojenje za proizvodnja TNG sa pripadajucim
RNS - U-2500
rezervoarima (LPG production and tanks) Mile Zori
RNS RNS U-2600
U-2600 Postrojenje Unibon - Desulfurizacija (Unibon - Boris Bokovi
RNS - 5800
HDS)
U-5800 Postrojenje za obradu sulfidnih voda (Sulphur
water treatment)

Goriva - Primarno
(Fuel - Primary)
RNS - U-2100 U-2100: Atmosferska destilacija sa stabilizacijom
RNS Mile Zori
RNS U2200 (Atmospheric distillation with stabilization)
U-2200: Vakuum destilacija
(Vacuum distillation)

Uljara 1 (Oil section 1)


RNS - U-100 U-100: Atmosferska destilacija
RNS Goran Ristovi
RNS U-200 (Atmospheric distillation)
U-200: Vakuum destilacija (Vacuum distillation)

Uljara 2
(Oil section 2)
RNS - HF-400 HF-400: Hidrofiniing (Hydrofiniching)
RNS RNS - HFH-400 HFH - 400: Postrojenje za proizvodnju vodonika Goran Ristovi
RNS - KRB-400 (Hydrogen production)
KRB-400: Sistem baklje sa pripadajuim cevovodima i
opremom (Flare with piping and equipment)

Proizvodnja i dorada bitumena


(Coking - Bitumen production and treatment)
U-300: Proizvodnja bitumena sa sirovinskim
RNS - U-300
RNS rezervoarima (G10 i V1 do V6) (Bitumen production with Mihajlo Delari
RNS U-900
feed tanks G10 and V1 to V6)
U-900: Pomoni sistemi (sistem toplog ulja) (Auxiliary
system - Hot oil)

Proizvodnja tehnoloke pare i distribucija pare i gasa


(Steam production and steam and gases distribution)
RNS 0300 0300: Pogon proizvodnje tehnoloke pare - kotlarnica
RNS Petar Vidovi
RNS - 30 (Steam production - boiler)
30: Postrojenje pare i kondenzata - reducir stanica
(Steam and condensate)

RNS RNS - 0200 Pogon pripreme vode (Water treatment) 0200: HPV Petar Vidovi

Blending ulja sa pripadajuim cevovodima i


RNS RNS - Novolin pumparnicama Dragan Bubnjevi
(Oil blending with piping and pumping)

RNS - Obrada
Pogon obrade otpadnih voda sa separatorima i pei za
otpadnih voda
RNS spaljivanje mulja Miroljub Ceki
(Waste water
(Waste water treating with separation and mud furnace)
treatment)

RiskNIS RBI Qualitative Unit-Based page 14


Steinbeis Advanced Risk Technologies R-TECH

Results

Preliminary results of the analysis are shown in the Risk Matrix (see Figure 5) and in
Table 2.

Furthermore, single risk matrices for various consequence categories are shown as
follows:

1. Damage consequence Risk Matrix - Figure 6

2. Health consequence Risk Matrix - Figure 7

3. Environmental consequence Risk Matrix - Figure 8

4. Business consequence Risk Matrix - Figure 9

5. Reputation consequence Risk Matrix - Figure 10

The summary results for RNP are shown in the Risk Matrix (see Figure 11) and in Table
3

The summary results for RNS are shown in the Risk Matrix (seeFigure 12) and in Table
4

The summary results for RGE are shown in the Risk Matrix (see Figure 13) and in Table
5.

RiskNIS RBI Qualitative Unit-Based page 15


Steinbeis Advanced Risk Technologies R-TECH

13, 17, 20, 21,


22, 25, 35, 36,
4 5 10, 11 12, 52
37, 39, 41, 45,
L
46
I
K
E
19, 23, 24, 26,
L 1, 2, 3, 4, 6, 44, 8, 18, 30, 31, 32,
3 16, 43 27, 29, 42, 53,
I 49, 55, 56, 57 47, 50, 51, 58
54
H
O
O
D
2 48, 60, 61 28, 34 38, 40, 59

1 7, 9, 14 33 15

A B C D E

CONSEQUENCES

Figure 5 Overall Qualitative Risk Matrix for all three NIS Plants (RNP, RNS, RGE)

10, 11, 20, 21,


22, 25, 35, 36,
4 5, 12, 13 17 39
37, 41, 45, 46,
L
52
I
K
E
16, 19, 23, 24, 1, 2, 3, 4, 6, 8,
L 0, 31, 32, 42, 43,
3 26, 29, 44, 50, 18, 27, 47, 53,
I 49
51, 56 54, 55, 57, 58
H
O
O
D
28, 38, 40, 59,
2 34, 48
60, 61

1 7, 9, 14, 15 33

A B C D E

CONSEQUENCES

Figure 6 NIS Overall Damage matrix for all three units (RNP, RNS, RGE)

RiskNIS RBI Qualitative Unit-Based page 16


Steinbeis Advanced Risk Technologies R-TECH

13, 17, 20, 21,


22, 25, 35, 36,
4 5, 11 10 12
37, 39, 41, 45,
L
46, 52
I
K
E
L 2, 6, 23, 43, 56, 1, 3, 4, 27, 44, 8, 19, 24, 26, 29, 18, 30, 31, 32,
3 16, 49, 53
I 57 54, 55 42 47, 50, 51, 58
H
O
O
D
2 34, 48, 60, 61 28 38, 40, 59

1 7, 9, 14, 15, 33

A B C D E

CONSEQUENCES

Figure 7 NIS Overall Health matrix for all three units (RNP, RNS, RGE)

5, 12, 13, 17, 20,


4 21, 22, 25, 36, 11, 45 10 35 52
L 37, 39, 41, 46
I
K
E 2, 6, 16, 18, 19,
L 24, 26, 27, 29, 1, 3, 50, 55, 56,
3 4, 23, 42 51, 53, 54, 58 8, 47
I 30, 31, 32, 43, 57
H 44, 49
O
O
D
28, 34, 38, 40,
2 59, 60
48, 61

1 7, 9, 14, 33 15

A B C D E

CONSEQUENCES

Figure 8 NIS Overall Environmental matrix for all three units (RNP, RNS, RGE)

RiskNIS RBI Qualitative Unit-Based page 17


Steinbeis Advanced Risk Technologies R-TECH

12, 13, 17, 20,


10, 11, 35, 36,
4 21, 22, 25, 37, 5
45, 46, 52
L 39, 41
I
K
E
2, 3, 4, 16, 19,
L 6, 42, 43, 44, 47, 1, 8, 27, 50, 51,
3 24, 26, 29, 30, 18, 23
I 56, 57 53, 54, 55, 58
31, 32, 49
H
O
O
D
2 48, 59 60, 61 28, 34 38, 40

1 7, 9, 14 15, 33

A B C D E

CONSEQUENCES

Figure 9 NIS Overall Business Consequences matrix for all three units (RNP, RNS, RGE)

12, 13, 17, 20,


5, 10, 11, 35, 36,
4 21, 22, 25, 37,
41, 45, 46, 52
L 39
I
K
E
2, 3, 4, 16, 19, 6, 42, 43, 44, 47,
L
3 24, 26, 29, 30, 50, 51, 53, 54, 1, 8, 18, 23, 49 27
I
31, 32 55, 56, 57, 58
H
O
O
D
2 38, 40 28, 48, 60, 61 34, 59

1 7, 9, 14 33 15

A B C D E

CONSEQUENCES

Figure 10 NIS Overall Reputation consequences matrix for all three units (RNP, RNS, RGE)

RiskNIS RBI Qualitative Unit-Based page 18


Steinbeis Advanced Risk Technologies R-TECH

Table 2 Unit overview for Qualitative Risk Matrix for all three NIS Plants (RNP, RNS, RGE)

LoF Damage Health Env. Business Reputation Overall Risk


ID Unit name
Cat. CoF Cat. CoF Cat. CoF COF Cons. CoF Rank

RGE -RGE-1 Procesno


1 3 C C C C C C Medium
postrojenje

2 RNP -S-100 3 C A A A A C Medium

3 RNP -S-1800 3 C C C A A C Medium

4 RNP -S-2100 3 C C B A A C Medium

5 RNP -S- 600 4 A B A B B B Medium

6 RNP -S- 750 3 C A A B B C Medium

7 RNP -S- 850 1 A A A A A A Low

Very
8 RNP -S-2650 3 C D E C C E
High

9 RNP -RNP - Energana 1 A A A A A A Low

10 RNP -S-0250 4 B C C C B C High

11 RNP -S-0290 4 B B B C B C High

Very
12 RNP -S-200 4 A E A A A E
High

13 RNP -S-900 4 A D A A A D High

14 RNP -S-1500 1 A A A A A A Low

15 RNP -S-1550 1 A A B B C C Medium

16 RNP -S-2200 3 B B A A A B Low

17 RNP -S-2300 4 C D A A A D High

Very
18 RNP -S-2500 3 C E A D C E
High

19 RNP -S-2550 3 B D A A A D High

20 RNP -S-2950 4 B D A A A D High

21 RNP -S-2400 4 B D A A A D High

22 RNP -S-2450 4 B D A A A D High

23 RNP -S-2600 3 B A B D C D High

24 RNP -S-2750 3 B D A A A D High

25 RNP -S-2850 4 B D A A A D High

RiskNIS RBI Qualitative Unit-Based page 19


Steinbeis Advanced Risk Technologies R-TECH

LoF Damage Health Env. Business Reputation Overall Risk


ID Unit name
Cat. CoF Cat. CoF Cat. CoF COF Cons. CoF Rank

26 RNP -S-2900 3 B D A A A D High

27 RNP -S- 300 3 C C A C D D High

28 RNP -S- 500 2 B B A C B C Medium

29 RNP -S-550 3 B D A A A D High

Very
30 RNP -S-570 3 A E A A A E
High

Very
31 RNP -S-650 3 A E A A A E
High

Very
32 RNP -S-1300 3 A E A A A E
High

33 RNP -S- 1520 1 B A A B B B Low

34 RNP -Velika kompresornica 2 A A A C C C Medium

35 RNP -S-3600 4 B D D C B D High

36 RNP -S-400 4 B D A C B D High

37 RNP -S-620 4 B D A A A D High

38 RNP -S-1700 2 B E A D A E High

39 RNP -S-1000 4 D D A A A D High

40 RNP -S-2700 2 B E A D A E High

41 RNS -0200 4 B D A A B D High

42 RNS -0300 mazut 3 A D B B B D High

43 RNS -30 3 A - A B B B Low

44 RNS -0300 prirodni gas 3 B C A B B C Medium

45 RNS -HF-400 4 B D B C B D High

46 RNS -HFH-400 4 B D A C B D High

Very
47 RNS -KRB-400 3 C E E B B E
High

RNS -Blending ulja sa


48 pripadajuim cevovodima i 2 A A A A B B Low
pumparnicama

RNS -Pogon obrade otpadnih


49 voda sa separatorima i pei za 3 A B A A C C Medium
spaljivanje mulja

Very
50 RNS -U-100 3 B E C C B E
High

RiskNIS RBI Qualitative Unit-Based page 20


Steinbeis Advanced Risk Technologies R-TECH

LoF Damage Health Env. Business Reputation Overall Risk


ID Unit name
Cat. CoF Cat. CoF Cat. CoF COF Cons. CoF Rank

Very
51 RNS -U-200 3 B E D C B E
High

Very
52 RNS -U-2100 4 B D E C B E
High

53 RNS -U-2200 3 C B D C B D High

54 RNS -U-2300 3 C C D C B D High

55 RNS -U-2400 3 C C C C B C Medium

56 RNS -U-2700 3 B A C B B C Medium

57 RNS -U-2500 3 C A C B B C Medium

Very
58 RNS -U-2600 3 C E D C B E
High

59 RNS -U-5800 2 B E B A C E High

60 RNS -U-300 2 B A B B B B Low

61 RNS -U-900 2 B A A B B B Low

12, 16, 19, 20,


4 4 9, 10 21, 24, 34, 35, 11
L 36, 38
I
K
E
L 18, 22, 23, 25,
3 15 1, 2, 3, 5 7, 17, 29, 30, 31
I 26, 28
H
O
O
D
2 27, 33 37, 39

1 6, 8, 13 32 14

A B C D E

CONSEQUENCES

Figure 11 Qualitative Risk Matrix for RNP

RiskNIS RBI Qualitative Unit-Based page 21


Steinbeis Advanced Risk Technologies R-TECH

Table 3 Unit overview for Qualitative Risk Matrix for RNP

LoF Damage CoF Health CoF Env. Business Reputation Overall Risk
ID Unit name
Cat. Cat. Cat. CoF COF Cons. CoF Rank

1 RNP -S-100 3 C A A A A C Medium

2 RNP -S-1800 3 C C C A A C Medium

3 RNP -S-2100 3 C C B A A C Medium

4 RNP -S- 600 4 A B A B B B Medium

5 RNP -S- 750 3 C A A B B C Medium

6 RNP -S- 850 1 A A A A A A Low

Very
7 RNP -S-2650 3 C D E C C E
High

RNP -RNP -
8 1 A A A A A A Low
Energana

9 RNP -S-0250 4 B C C C B C High

10 RNP -S-0290 4 B B B C B C High

Very
11 RNP -S-200 4 A E A A A E
High

12 RNP -S-900 4 A D A A A D High

13 RNP -S-1500 1 A A A A A A Low

14 RNP -S-1550 1 A A B B C C Medium

15 RNP -S-2200 3 B B A A A B Low

16 RNP -S-2300 4 C D A A A D High

Very
17 RNP -S-2500 3 C E A D C E
High

18 RNP -S-2550 3 B D A A A D High

19 RNP -S-2950 4 B D A A A D High

20 RNP -S-2400 4 B D A A A D High

21 RNP -S-2450 4 B D A A A D High

22 RNP -S-2600 3 B A B D C D High

23 RNP -S-2750 3 B D A A A D High

24 RNP -S-2850 4 B D A A A D High

25 RNP -S-2900 3 B D A A A D High

RiskNIS RBI Qualitative Unit-Based page 22


Steinbeis Advanced Risk Technologies R-TECH

LoF Damage CoF Health CoF Env. Business Reputation Overall Risk
ID Unit name
Cat. Cat. Cat. CoF COF Cons. CoF Rank

26 RNP -S- 300 3 C C A C D D High

27 RNP -S- 500 2 B B A C B C Medium

28 RNP -S-550 3 B D A A A D High

Very
29 RNP -S-570 3 A E A A A E
High

Very
30 RNP -S-650 3 A E A A A E
High

Very
31 RNP -S-1300 3 A E A A A E
High

32 RNP -S- 1520 1 B A A B B B Low

RNP -Velika
33 2 A A A C C C Medium
kompresornica

34 RNP -S-3600 4 B D D C B D High

35 RNP -S-400 4 B D A C B D High

36 RNP -S-620 4 B D A A A D High

37 RNP -S-1700 2 B E A D A E High

38 RNP -S-1000 4 D D A A A D High

39 RNP -S-2700 2 B E A D A E High

RiskNIS RBI Qualitative Unit-Based page 23


Steinbeis Advanced Risk Technologies R-TECH

4 1, 5, 6 11
L
I
K
E
L
3 3 4, 9, 14, 15, 16 2, 12, 13 7, 10, 17, 21
I
H
O
O
D
2 8, 19, 20 18

A B C D E

CONSEQUENCES

Figure 12 Qualitative Risk Matrix for RNS

Table 4 Unit overview for Qualitative Risk Matrix for RNS

LoF Damage Health Env. Business Reputation Overall Risk


ID Unit name
Cat. CoF Cat. CoF Cat. CoF COF Cons. CoF Rank

1 RNS -0200 4 B D A A B D High

2 RNS -0300 mazut 3 A D B B B D High

3 RNS -30 3 A - A B B B Low

4 RNS -0300 prirodni gas 3 B C A B B C Medium

5 RNS -HF-400 4 B D B C B D High

6 RNS -HFH-400 4 B D A C B D High

Very
7 RNS -KRB-400 3 C E E B B E
High

RNS -Blending ulja sa


8 pripadajuim cevovodima i 2 A A A A B B Low
pumparnicama

RNS -Pogon obrade otpadnih


9 voda sa separatorima i pei za 3 A B A A C C Medium
spaljivanje mulja

RiskNIS RBI Qualitative Unit-Based page 24


Steinbeis Advanced Risk Technologies R-TECH

LoF Damage Health Env. Business Reputation Overall Risk


ID Unit name
Cat. CoF Cat. CoF Cat. CoF COF Cons. CoF Rank

Very
10 RNS -U-100 3 B E C C B E
High

Very
11 RNS -U-2100 4 B D E C B E
High

12 RNS -U-2200 3 C B D C B D High

13 RNS -U-2300 3 C C D C B D High

14 RNS -U-2400 3 C C C C B C Medium

15 RNS -U-2700 3 B A C B B C Medium

16 RNS -U-2500 3 C A C B B C Medium

Very
17 RNS -U-2600 3 C E D C B E
High

18 RNS -U-5800 2 B E B A C E High

19 RNS -U-300 2 B A B B B B Low

20 RNS -U-900 2 B A A B B B Low

Very
21 RNS -U-200 3 B E D C B E
High

RiskNIS RBI Qualitative Unit-Based page 25


Steinbeis Advanced Risk Technologies R-TECH

4
L
I
K
E
L
3 1
I
H
O
O
D
2

A B C D E

CONSEQUENCES

Figure 13 Qualitative Risk Matrix for RGE

Table 5 Unit overview for Qualitative Risk Matrix for RGE

LoF Damage Health Env. Business Reputation Overall


ID Unit name Risk Rank
Cat. CoF Cat. CoF Cat. CoF COF Cons. CoF

RGE-1 Procesno
1 3 C C C C C C Medium
postrojenje

RiskNIS RBI Qualitative Unit-Based page 26


Steinbeis Advanced Risk Technologies R-TECH

Conclusions and recommendations

Presented results so far have DRAFT status, and show considerable number of units
being in the high or critical risk zones. The results are still subject to further verification.

Furthermore, it has been noted that reluctance by assessing the business or reputation
consequences has given unrealistic results, especially in RNP.

Also, relatively low damage matrix picture should be revised.

It is to be expected that after the complete data is provided for all 60 units, the
situation will change.

RiskNIS RBI Qualitative Unit-Based page 27


Steinbeis Advanced Risk Technologies R-TECH

References
[1] Contract No: 45/609 of September 8, 2006
[2] API PUBL 581, Risk-Based Inspection Base Resource Document, 2000 Edition
[3] CEN/WS 24 RIMAP draft CWA August 2007

RiskNIS RBI Qualitative Unit-Based page 28


Steinbeis Advanced Risk Technologies R-TECH

Annex 1 Example of Qualitative Workbook in Serbian

RiskNIS RBI Qualitative Unit-Based page 29

Vous aimerez peut-être aussi