Vous êtes sur la page 1sur 2
bro nevsions | ae] CENENT CASE “BTS 80 1-3/4 (45) BTS _78V 1-31/32 (50) NOTES. 1, DO NOT SCALE DRAWING. 2. WHEN’ DETERMINING SPINOLE. SIZE, ADD 1" TO CLEARANCE BETWEEN FINISHED FLOOR AND DOOR. 3. FOR CEMENT CASE LOCATION. REFER TO TEMPLATE BTS—77. INSTALL 1” LOWER THAN SHOWN To ACCOMODATE TERRAZZO PAN. 4. DIMENSIONS FOR TERRAZZO PAN INCLUDE INSTALLATION SHIMS. 5. DINENSIONS ARE IN INCHES/(MM). BIS _75V_2-5/16 (59) BIS 80 2-3/8 (60) BTS 75V 11-5/8 (295) BTS 80 — 13-13/16 (351) eTS 78V 3-15/16 (100) BTS 80 3-1/2 (89) FINISHED FLOOR LINE ‘TERRAZZO 1—1r | aa —- ~~ FLOOR CLOSER MODELS: BTS75V, 8TS80 CENTER HUNG TERRAZZO PAN PREPARATION DORMA Architectural Hardware REAMSTOWN, PENNS LVANIA “7567 TEMPLATE No. BTS—B6 SIDE 1_OF 2 ALWAYS GONSULT DORMA'S WEB SITE FOR LATEST TEMPLATE AT WWW. DORMA-USA.COM OR GALL 1 Bill) 623 0483 7/87 INSTRUCTION 1. Locate floor closer accurately in subfloor prior to instaling terrazza pan. 2. Install two location pins Into bose of pon. Install volve lugs into valve access tubes. 3. Poce terrozzo pan onto floor closer. Place shims Ughtly against sides of terrazzo pan, (Shims must stay In place while pouring terrazze flooring.) Carefully pour terrazzo in ond around pan 4, Surface terrazzo pan and surrounding floor area to. Provide uninterrupted floor appearance. DORMA DOOR CONTROLS INC. REAMSTO! LVANIA. 17567 TEMPLATE No. SIDE 2 OF 2 ALWAYS CONSULT DORMA'S WEB SITE FOR LATEST TEMPLATE AT WWW. COM OR CALL 1 800 523 8483

Vous aimerez peut-être aussi