Académique Documents
Professionnel Documents
Culture Documents
A D
1/14 B C 1/14
1/16
D 13@ 200
= 360 kg/m2
= 50 kg/m2
mm ) = 330 kg/m2
mm ) = kg/m2
mm ) = kg/m2
+
= 740 kg/m2
= 1000 kg/m2
1247.999 kgm/m
1091.999 kgm/m
1247.999 kgm/m
End moment of y direction (Mty)
mm2
mm2 > Asreq . . . SAVE
kg/m2
150
No Design
1/16 1/16
1
A 1/10 B
2650.000
1/24 1/24
A B
1/8
2
2650
3 A
1/14 1/14 C
B
2650 2650
A C
1/11 1/11
4
B
2650 2650
A B C D
5 1/14 1/16 1/14
No Design
A D
1/11 B C 1/11
1/16
6
2650 2650 2650
A B C D E
7 1/14 1/16 1/16 1/14
A B C D E
6 1/11 1/16 1/16 1/11
A B C D E F
7 1/14 1/16 1/16 1/14
1/16
Moment Coefficient
No Design
A B C D E F
8 1/11 1/16 1/16 1/16 1/11
Moment
End moment
MA = 1091.999 kgm/m
MB = 1091.999 kgm/m
Cen moment
MAB = 1747.198 kgm/m
End moment
MA = 727.999 kgm/m
MB = 727.999 kgm/m
Cen moment
MAB = 2183.998 kgm/m
End moment
MB = 1941.331 kgm/m
End moment
MB = 1941.331 kgm/m
Moment
Side moment Cen moment
MA = 727.999 kgm/m MAB = 1588.362 kgm/m
MD = 727.999 kgm/m MBC = 1091.999 kgm/m
MCD = 1588.362 kgm/m
End moment
MB = 1747.198 kgm/m
MC = 1747.198 kgm/m
ent Coefficient
Moment
Side moment Cen moment
MA = 727.999 kgm/m MAB = 1588.362 kgm/m
MF = 727.999 kgm/m MBC = 1091.999 kgm/m
MCD = 1091.999 kgm/m
End moment MDE = 1091.999 kgm/m
MB = 1747.198 kgm/m MEF = 1588.362 kgm/m
MC = 1588.362 kgm/m
MD = 1588.362 kgm/m
ME = 1747.198 kgm/m
MATERIAL TULANGAN ULIR
2
3
4
LIR JARAK ANTAR TULANGAN (JAPAN STANDRAD)
Perimeter 2 3 4 5 6
mm D10 19.5 23.5 28 33 38
D16
3 D13 21 25 30 34.5 39.5
4 D10 19.5 24 29 34.5 39.5
D19
5 D13 21.5 25.5 30.5 36 41
6 D10 20 25 31 36.5 42.5
D22
7 D13 22 26.5 32.5 38 44
8 D10 21 26.5 33 39.5 46
9 D25 D13 22.5 28 34.5 41 47.5
10 D16 24.5 30 36.5 43 50
11 D13 23.5 30 38 45.5 53
D29
12 D16 25.5 32 39.5 47 55
D13 24.5 31.5 40 48.5 57
D32
D16 26 33.5 42 50 58.5
D13 25 33.5 42.5 52 61
D35
D16 27 35 44.5 53.5 63
(JAPAN STANDRAD) TULANGAN MINIMAL SLAB
Ribbed Slab