Vous êtes sur la page 1sur 174

3

Brief Introduction

Ningbo Head Office Ningbo Branch Company Jiangsu Lijin Company

The head office of INI HYDRAULIC CO.,LTD is located in Beilun district, Ningbo, a national level industrial area. The company covers a total area
of 240,000 sqm, with building area of 150,000 sqm. The register capital is CNY 281,000,000. We have 550 employees, and professional
technicians account for more than 20%. We have strong research and develop capability. The provincial level R&D team consists of our
general manager (who is a national level hydraulic expert & professional senior engineer that takes special subsidy awarded by the state
council), doctors, masters, senior engineers, engineers, and assistant engineers. We invited two retired experts from ZF Company in
Germany to help us. We got 21 invention patents and 30 practical innovation and figure patents. Several patents are under reviewing.
We specialize in manufacturing hydraulic pumps, hydraulic motors, hydrostatic drives, hydraulic winches, planetary gearboxes, high preci-
sion synchronizing flow dividers and whole set of hydraulic systems.
These patented products have been widely used in offshore application, agriculture, fishing, construction machinery, petroleum, coal mining,
geological prospection, marine, metallurgical, light industry, and environmental protection and other industries. Our products have been
exported to USA, UK, Austria, Netherlands, Australia, Russia, Germany, Turkey, Brazil, Southeast Asia, Middle East, India, Russia, Korea and
other countries in the world.
We have more than 350 sets of advanced manufacturing equipment. 50% were imported, and CNC machines account for more than 80%. We
have 63 sets of inspection machines, including three 3D measuring machines, gear measuring machines, universal gear measuring machines,
optical spectrum analyzers, digital ultrasonic inspection machines, universal toolmakers microscopse, and particle counters. We set up type
approval test labs for hydraulic pumps, hydraulic motors and hydrostatic drives, dust free assembly workshop and 16 test stands to do
factory tests for various types of products.
We got ISO9001:2008, CCSR9001, and ISO14001certification, clean production certification, CCS certification, CE certification, and EC type
MED certification. Our company was honored as national level high-tech enterprise, supported by the government, patent pilot enterprise in
Zhejiang province and Ningbo city, and Ningbo high-tech innovation enterprise. Our products are regarded as famous brand in Ningbo. We
have been responsible for national torch projects and major scientific & technological achievements transformation projects several times. We
won the first prize, second prize and third prize of Zhengjiang and Ningbo science and technology advancement award several times.
R

Please read carefully the specifications before selection

Company Shows

Company Gate Company Overview R&D Center Mechanical Technology Institute

Communication with Expert German Experts Study Motor Assembly Hydrostatic Assembly

Winch Assembly 1# Metalworking Workshop 2# Metalworking Workshop 3# Metalworking Workshop

Winch Testing Hydrostatic Lab Gear Grinding Machine Three Coordinate Measuring Machine

CNC precision universal Horizontal machining center Double-spindle turning & milling & Automatic double-spindle turning &
grinding machine imported imported from Germany and boring machining center imported milling & boring machining center
from Switzerland Japan from Germany and Japan imported from Japan
R

Please read carefully the specifications before selection

&
Product Shows & Applications
INI HYDRAULIC
R

Please read carefully the specifications before selection

&
Product Shows & Applications
INI HYDRAULIC
R
&
Please read carefully the specifications before selection
Product Shows & Applications
R
&
Please read carefully the specifications before selection
Product Shows & Applications

INI HYDRAULIC
R
&
Please read carefully the specifications before selection
Product Shows & Applications
R
&
Please read carefully the specifications before selection
Product Shows & Applications
R
&
Please read carefully the specifications before selection
Product Shows & Applications
R
&
Please read carefully the specifications before selection
Product Shows & Applications
R

Please read carefully the specifications before selection

Contents

1 total 118 pages


Section 1: hydraulic transmission drive
2 total 162 pages
Section 2: winch

1 total 159 pages


Section 1: hydraulic pump, hydraulic motor, hydraulic system, hydraulic power pack
2 total 71 pages
Section 3: planetary gearbox (with hydraulic brake)

1 total 20 pages
Section 5: Screw-in cartridge values

Section 3: hydraulic pump, hydraulic motor, hydraulic system,


hydraulic power pack

I3V Series Pump

IAP Series Pump

IAM Series Motor

INM Series Hydraulic Motor

IPM Series Hydraulic Motor

IMB Hydrostatic Balance Hydraulic Motor

IMC Series Hydraulic Motor

QJM Series Hydraulic Motor

Hydraulic System with Electromechanical Integration


R

Please read carefully the specifications before selection


I3V

.1.
R

Please read carefully the specifications before selection


I3V

.2.
R

Please read carefully the specifications before selection


I3V2-10S

.3.
R

Please read carefully the specifications before selection


I3V2-10S

.4.
R

Please read carefully the specifications before selection


I3V2-28N

.5.
R

Please read carefully the specifications before selection


I3V2-36N

.6.
R

Please read carefully the specifications before selection


I3V63-1 IN

.7.
R

Please read carefully the specifications before selection


I3V63-1 IN

.8.
R

Please read carefully the specifications before selection


I3V63-1 IN

.9.
R

Please read carefully the specifications before selection


I3V63-2 IN

.10.
R

Please read carefully the specifications before selection


I3V63-2 IN

.11.
R

Please read carefully the specifications before selection


I3V112-1 IN

.12.
R

Please read carefully the specifications before selection


I3V112-1 IN

.13.
R

Please read carefully the specifications before selection


I3V112-1 IN

.14.
R

Please read carefully the specifications before selection


I3V112-2 IN

.15.
R

Please read carefully the specifications before selection


I3V112-2 IN

.16.
R

Please read carefully the specifications before selection


I3V112-2 IN

.17.
R

Please read carefully the specifications before selection


IAP

.18.
R

Please read carefully the specifications before selection


IAP

.19.
R

Please read carefully the specifications before selection IAP10-2

.20.
R

Please read carefully the specifications before selection IAP63-1

.21.
R

Please read carefully the specifications before selection IAP63-1

.22.
R

Please read carefully the specifications before selection IAP63-2

.23.
R

Please read carefully the specifications before selection IAP63-2

.24.
R

Please read carefully the specifications before selection IAP112-1

.25.
R

Please read carefully the specifications before selection IAP112-1

.26.
R

Please read carefully the specifications before selection IAP112-1

.27.
R

Please read carefully the specifications before selection IAP112-2

.28.
R

Please read carefully the specifications before selection IAP112-2

.29.
R

Please read carefully the specifications before selection IAP112-2

.30.
R

Please read carefully the specifications before selection IAM

.31.
R

Please read carefully the specifications before selection IAM

.32.
R

Please read carefully the specifications before selection IAM36

.33.
R

Please read carefully the specifications before selection IAM63

.34.
R

Please read carefully the specifications before selection IAM65

.35.
R

Please read carefully the specifications before selection IAM112

.36.
R

Please read carefully the specifications before selection IAM172

.37.
R

Please read carefully the specifications before selection


INM

.38.
R

Please read carefully the specifications before selection


INM

.39.
R

Please read carefully the specifications before selection


INM

.40.
R

Please read carefully the specifications before selection


INM

.41.
R

Please read carefully the specifications before selection


INM05

.42.
R

Please read carefully the specifications before selection


INM05

.43.
R

Please read carefully the specifications before selection


INM1

.44.
R

Please read carefully the specifications before selection


INM1

.45.
R

Please read carefully the specifications before selection


INM2

.46.
R

Please read carefully the specifications before selection


INM2

.47.
R

Please read carefully the specifications before selection


INM3

.48.
R

Please read carefully the specifications before selection


INM3

.49.
R

Please read carefully the specifications before selection


INM4

.50.
R

Please read carefully the specifications before selection


INM4

.51.
R

Please read carefully the specifications before selection


INM5

.52.
R

Please read carefully the specifications before selection


INM5

.53.
R

Please read carefully the specifications before selection


INM6

.54.
R

Please read carefully the specifications before selection


INM6

.55.
R

Please read carefully the specifications before selection


INM7

.56.
R

Please read carefully the specifications before selection


IPM

.57.
R

Please read carefully the specifications before selection


IPM

.58.
R

Please read carefully the specifications before selection


IPM

.59.
R

Please read carefully the specifications before selection


IPM

.60.
R

Please read carefully the specifications before selection


IPM1

.61.
R

Please read carefully the specifications before selection


IPM2

.62.
R

Please read carefully the specifications before selection


IPM3

.63.
R

Please read carefully the specifications before selection


IPM4

.64.
R

Please read carefully the specifications before selection


IPM5

.65.
R

Please read carefully the specifications before selection


IPM6

.66.
R

Please read carefully the specifications before selection


IPM7

.67.
R

Please read carefully the specifications before selection


IPM8

.68.
R

Please read carefully the specifications before selection


IPM9

.69.
R

Please read carefully the specifications before selection


IPM10

.70.
R

Please read carefully the specifications before selection


IPM11

.71.
R

Please read carefully the specifications before selection


IPM12

.72.
R

Please read carefully the specifications before selection


IMB

.73.
R

Please read carefully the specifications before selection


IMB

.74.
R

Please read carefully the specifications before selection


IMB

.75.
R

Please read carefully the specifications before selection


IMB080

.76.
R

Please read carefully the specifications before selection


IMB100

.77.
R

Please read carefully the specifications before selection


IMB125

.78.
R

Please read carefully the specifications before selection


IMB125

.79.
R

Please read carefully the specifications before selection


IMB200

.80.
R

Please read carefully the specifications before selection


IMB200

.81.
R

Please read carefully the specifications before selection


IMB270

.82.
R

Please read carefully the specifications before selection


IMB325

.83.
R

Please read carefully the specifications before selection


IMB400

.84.
R

Please read carefully the specifications before selection


IMBP

.85.
R

Please read carefully the specifications before selection


IMBP

.86.
R

Please read carefully the specifications before selection


IMBP

.87.
R

Please read carefully the specifications before selection


IMBP200

.88.
R

Please read carefully the specifications before selection


IMBP270

.89.
R

Please read carefully the specifications before selection


IMC

.90.
R

Please read carefully the specifications before selection


IMC

.91.
R

Please read carefully the specifications before selection


IMC100

.92.
R

Please read carefully the specifications before selection


IMC100

.93.
R

Please read carefully the specifications before selection


IMC100

.94.
R

Please read carefully the specifications before selection


IMC125

.95.
R

Please read carefully the specifications before selection


IMC125

.96.
R

Please read carefully the specifications before selection


IMC125

.97.
R

Please read carefully the specifications before selection


IMC200

.98.
R

Please read carefully the specifications before selection


IMC200

.99.
R

Please read carefully the specifications before selection


IMC200

.100.
R

Please read carefully the specifications before selection


IMC270

.101.
R

Please read carefully the specifications before selection


IMC270

.102.
R

Please read carefully the specifications before selection


IMC270

.103.
R

Please read carefully the specifications before selection


IMC325

.104.
R

Please read carefully the specifications before selection


IMC325

.105.
R

Please read carefully the specifications before selection


IMC325

.106.
R

Please read carefully the specifications before selection


QJM

.107.
R

Please read carefully the specifications before selection


QJM

.108.
R

Please read carefully the specifications before selection


QJM

.109.
R

Please read carefully the specifications before selection


1QJM

.110.
R

Please read carefully the specifications before selection


2QJM

.111.
R

Please read carefully the specifications before selection


1QJM

.112.
R

Please read carefully the specifications before selection


1QJM

.113.
R

Please read carefully the specifications before selection


1/2QJM

.114.
R

Please read carefully the specifications before selection


1/2QJM

.115.
R

Please read carefully the specifications before selection


1/2QJM

.116.
R

Please read carefully the specifications before selection


1/2QJM

.117.
R

Please read carefully the specifications before selection


1/2QJM

.118.
R

Please read carefully the specifications before selection


1/2QJM

.119.
R

Please read carefully the specifications before selection


1/2QJM

.120.
R

Please read carefully the specifications before selection


1/2QJM

.121.
R

Please read carefully the specifications before selection


1/2QJM

.122.
R

Please read carefully the specifications before selection


1/2QJM

.123.
R

Please read carefully the specifications before selection


2QJM

.124.
R

Please read carefully the specifications before selection


1QKM

.125.
R

Please read carefully the specifications before selection

.126.
R

Please read carefully the specifications before selection

.127.
R

Please read carefully the specifications before selection


Hydraulic System

.128.
R

Please read carefully the specifications before selection


Hydraulic System

.129.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.130.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.131.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.132.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.133.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.134.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.135.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.136.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.137.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.138.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.139.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.140.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.141.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.142.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.143.
R

Please read carefully the specifications before selection

Hydraulic Circuit Diagram

.144.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.145.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.146.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.147.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.148.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.149.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.150.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.151.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.152.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.153.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.154.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.155.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.156.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.157.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.158.
R

Please read carefully the specifications before selection

Hydraulic Unit Figure

.159.
R

Please read carefully the specifications before selection


Company Certificate

R
INI HYDRAULIC CO.,LTD
Headquarters add: No.288 Batou xi road, Beilun, Ningbo, Zhejiang, China
315806 Zipcode: 315806
0574-86300164, 86302674, 86115076 TEL: +86-574-86300164, 86302674, 86115076
0574-86115082, 86115071 FAX: +86-574-86115082, 86115071
E-mail: ini@china-ini.com E-mail: ini@china-ini.com
Http: //www.china-ini.com Http: //www.china-ini.com

Chunxiao company add: No.720 Tinghai road,Beilun, Ningbo,Zhejiang,China


Zhenhai company add: high-tech park, wulipai zhenhai, Ningbo, Zhejiang, China

Wholly Owned Subsidiary:


NINGBO LISHIWELL HYDRAULIC DRIVE CO.,LTD
Add: No.1801 Zhenluo east road,Zhenhai, Ningbo, Zhejiang, China

JIANGSU LIKING HEAVY INDUSTRY CO.,LTD


Add: Economic Development Zone, Jinghu, Jiangsu, China

OMAYA HYDRAULIC EQUIPMENT PET.LTD.


8 TEMASEK BOULEVARD #34-03 SUNTEC Add: 8 Temasek Boulevard #34-03 Suntec Tower Three, Singaport
TOWER THREE, 038988 (038988)

FOR EUROPE BUSINESS CONTACT: FOR USA BUSINESS CONTACT: FOR AUSTRALIA BUSINESS CONTACT:

DEGRA WINCHES BV - INI EUROPE Zhou Engineering International INI-Australia


J. van der Heydenstraat 9 241 Ransom Road, 28 Jessie Lee St, Henderson 6166
3281 NE Numansdorp - Rotterdam Lancaster, NY 14086 Western Australia
The Netherlands Contact person: Mr Charlie Tranchita
Contact person: Mr. J.W. de Graaf Contact person: Mr. Zhou/Mr. Zhan Tel: +61-8-94947200 Fax: +61-8-94947299
E-mail : jwdegraaf@degra.info Phone: 1-716-656-1398 Email: info@ini-australia.com.au
Tel : +31-186-652189 Email: sales@zeiusa.com charlie@ini-australia.com.au
Fax. : +31-186-652370 Website: www.zeiusa.com Website: http://www.ini-australia.com.au

INI have a policy of continuous product improvement and therefore specifications are subject to change without notice.

Vous aimerez peut-être aussi