4] Revista de la Construccin
Volumen 12 No 22 - 2012
Abstract In recent years, the topic of construction For this reason this article presents a
and demolition waste (C&DW) has been meta-analysis of the contents of the
the focus of numerous investigations C&DW management publications and
resulting in a large number of collects progress on the most popular
publications. Some items that have topics in recent years. We conclude
submitted revisions to the state of that most mentioned topics are the
the art on C&DW management, they types of materials that cause waste,
conclude on statistical aspects, such as the quantities generated, among
the number of articles per journal, by others. Future research could focus on
country, by author, by source (University analyzing the situation of this problem
/ Institute), for research methods and in developing countries, methods of
data analysis methods. But do not integration of advances in the subject,
a frequency analysis of the issues the methodologies for the formulation
addressed in these publications and of management plans in C&DW work,
also presented a summary of them. among others.
Revista de la Construccin
pginas: 4 - 16
[ Aldana, J.C. - Serpell, A. ] Volumen 12 No 22 - 2012
[5
Revista de la Construccin
6] Volumen 12 No 22 - 2012
[ Aldana, J.C. - Serpell, A. ] pginas: 4 - 16
Revista de la Construccin
pginas: 4 - 16
[ Aldana, J.C. - Serpell, A. ] Volumen 12 No 22 - 2012
[7
Revista de la Construccin
8] Volumen 12 No 22 - 2012
[ Aldana, J.C. - Serpell, A. ] pginas: 4 - 16
Material Nmero de citaciones Fatta et al. (2003) han calculado la cantidad de RC&D
en Grecia a travs de la utilizacin de datos relevantes
Hormign 55 del nivel de actividad de la construccin y el nmero de
licencias de demolicin. Adicionalmente, supusieron
Madera 45 que por cada 1.000 m 2 de actividad de construccin se
Ladrillos 42 generan 50 m 3 de residuos, cada demolicin equivale
a la construccin de 60 m 2 y el volumen generado de
Plstico 26 residuos es de 114 m 3 y, finalmente, el valor promedio
de la densidad de los RC&D es 1.5 toneladas/m 3.
Metal 25
DW = ND x ANF x AS x DWB x D
No existe consenso mundial sobre el volumen total Donde DW es la cantidad de residuos de demolicin
de RC&D. Estos van a depender de las tecnologas, (en toneladas); ND es el nmero de edificios demo-
idiosincrasia, nivel cultural de los profesionales del lidos; ANF es el nmero promedio de pisos por cada
sector, entre otros. Por ejemplo, Sols-Guzmn et edificio demolido; AS es el rea promedio del edificio
al. (2009) reportan que el 35% de los residuos en el demolido (130 m 2); DWB es el volumen de residuos ge-
mundo pertenecen a la industria de la construccin, nerados por cada 100 m 2 de rea de edificio demolido
mientras que Huang et al. (2002) reporta que estos (80 m 3 por cada 100 m 2); y D es la densidad promedio
pueden variar entre un 13% y un 29%. En los pases de los residuos generados (1.6 toneladas/m 3).
industrializados los residuos son por lejos la fraccin
ms grande, contabilizando ms del 50% del total de SMARTWasteTM es otro mtodo de cuantificacin
los residuos generados (Spoerri et al., 2009). Ye y Yuan utilizado en el Reino Unido y se basa en informacin
(2010) y Bossink y Brouwers (1996) reportan que en obtenida de experiencias anteriores y calcula el volu-
Australia los residuos son del orden del 20% y el 30% men de los residuos en 13 categoras, por ejemplo:
y en Alemania del 19%. Bossink y Brouwers (1996) re- cermica, hormign, pallet de madera, etc. (Sols-
portan que en Holanda son el 26%, en Estados Unidos Guzmn, 2009).
Revista de la Construccin
pginas: 4 - 16
[ Aldana, J.C. - Serpell, A. ] Volumen 12 No 22 - 2012
[9
Revista de la Construccin
10 ] Volumen 12 No 22 - 2012
[ Aldana, J.C. - Serpell, A. ] pginas: 4 - 16
Revista de la Construccin
pginas: 4 - 16
[ Aldana, J.C. - Serpell, A. ] Volumen 12 No 22 - 2012
[ 11
Residuos Aplicaciones
Agregado Sub-bases de caminos, llenos para drenajes y hormigones (Tam y Tam, 2006).
3.2.5. Benecios de gestionar los RC&D: la reduccin de costos de construccin (Begum et al.,
2006 a y Lingard et al. 2000). Y los ambientales, entre
Los beneficios de gestionar los RC&D son mltiples otros, son el mejoramiento de estndares ambientales
(Tam et al., 2006 a). Los econmicos se dan por la pblicos, proteccin ambiental, reduccin de riesgos
reduccin de los costos de disposicin final, reduc- ambientales (aire, suelo y agua contaminada), reduc-
cin de gastos de materiales ordenados en exceso cin de enfermedades y lesiones relacionadas con el
que despus se pierden e ingresos por la venta de ambiente (Tam y Le, 2008).
artculos recuperados (Inglis, 2007). Los beneficios
sociales incluyen la prevencin de botaderos nuevos e A pesar de que se han reportados los beneficios, no
indeseables, reduccin de riesgos de salud ambiental y se ha desarrollado una metodologa sistemtica que
Revista de la Construccin
12 ] Volumen 12 No 22 - 2012
[ Aldana, J.C. - Serpell, A. ] pginas: 4 - 16
3.2.6. Barreras para gestionar los RC&D: Se han puesto de manifiesto las causas y fuentes de
la generacin de residuos, as como las acciones y
Algunos autores han identificado las barreras o di- estrategias para su minimizacin, pero hace falta ms
ficultades para implementar los mtodos de gestin desarrollo en la integracin de los hallazgos indivi-
de RC&D que ayuden a la minimizacin de ellos. duales en el campo de la gestin de residuos, de tal
Tam (2007), encontr los siguientes: bajos incentivos forma de reunirlos en un esquema unificado a travs
financieros, incrementos de gastos generales, bajos de herramientas prcticas de fcil implementacin
costos de disposicin, mercado competitivo, falta de tanto a nivel de empresa como a nivel de proyecto, de
entrenamiento y educacin, cultura y comportamiento tal forma de incorporarlas como un componente del
de la construccin, etc. proceso de planificacin de los proyectos.
Se han identificado algunas barreras para la minimi- Cada proyecto de construccin es diferente por lo
zacin de RC&D. Por ejemplo, Osmani et al. (2007) que un plan de gestin de residuos realizado para un
reportan, la falta de inters de clientes, legislacin, proyecto en especfico no es replicable a todos los
premios financieros, polticas de administracin de re- proyectos, y este, se debe adecuar a las necesidades
siduos en el sitio, entrenamiento, resistencia al cambio, propias de cada uno de ellos. Es necesario disponer
etc. Chung y Lo (2002), identificaron la tendencia a de metodologas de diseo de planes de gestin de
utilizar materiales de mala calidad debido a la presin residuos para tener directrices de cmo elaborar un
de reducir costos, falta de procedimientos sistemti- plan de gestin independientemente del tipo de
cos de reutilizacin de encofrados, subutilizacin de proyecto de construccin.
moldajes durables especialmente para contratistas
pequeos debido a los altos costos, inconsistencias La medicin de los volmenes de residuos generados
en varios dibujos tcnicos para el mismo proyecto, y en un proyecto de construccin es posible a travs
falta de habilidades en trabajadores. de metodologas que se enfocan en etapas previas o
posteriores al proceso de construccin. Es necesario
Quizs, estas barreras se dan porque la construccin desarrollar metodologas de medicin de los residuos
se caracteriza por tener una gran inercia al cambio durante el proceso de construccin de los proyectos
(Martnez, 2003), porque los contratistas perciben y que sean de bajo costo de implementacin, con el
altos costos en la implementacin, seguido de la falta propsito no solo de ir conociendo cunto es el vo-
de directrices e informacin disponible alrededor del lumen generado de los residuos, sino tambin, como
tema, y la falta de herramientas prcticas acerca de informacin de entrada para la toma de decisiones
planes de gestin de RC&D (Papargyropoulou et al., en cuanto a la gestin de ellos durante el proceso de
2011). construccin.
Revista de la Construccin
pginas: 4 - 16
[ Aldana, J.C. - Serpell, A. ] Volumen 12 No 22 - 2012
[ 13
Al-Hajj, A. & Hamani, K. (2011). Material Waste in the UAE Hao, J.L., Hills, M.J., & Huang, T. (2007). A simulation
Construction Industry: Main Causes and Minimization model using system dynamic method for construction
Practices. Architectural Engineering and Design and demolition waste management in Hong Kong.
Management, v 7, pp 221-235. Construction Innovation, v 7 (1), pp 7-21.
Begum, R.A., Siwar, C., Pereira, J.J., & Jaafar, A.H. (2006 a). Halliday, S. (2008). Sustainable Construction. Butterworth-
A benet-cost analysis on the economic feasibility of Heinemann. Slovenia.
construction waste minimization: The case of Malaysia.
Resources, Conservation and Recycling, v 48 (1), pp 86-98. Horvath, A. (2004). Construction materials and the
environment. Annual Review Environment Resources,
Begum, R.A., Siwar, Ch., Pereira, J. & Jaafar, A.H. (2006 b). v 29, pp 181-204.
Implementation of waste management and minimisation
in the construction industry of Malaysia. Resources, Huang, W. L., Lin, D. H., Chang, N.B., & Lin, K.S. (2002).
Conservation and Recycling, v 51 (1), p 190-202. Recycling of construction and demolition waste via a
mechanical sorting process. Resources Conservation &
Bossink, B.A.G., & Brouwers, H.J.H. (1996). Construction Recycling, v 37 (1), pp 23-37.
Waste: Quantication and Source Evaluation. Journal
of Construction Engineering and Management, v 122 Inglis, M. (2007). Construction and demolition waste best
(1), p 55-60. practices and cost saving. SB07 New Zealand. Paper
number: 057.
Clark, C., Jambeck, J., & Townsend, T. (2006). A review
of Construction and Demolition Debris Regulations in Jaillon, L., Poon, C.S., & Chiang, Y.H. (2008). Quantifying
the United States. Critical Reviews in Environmental the waste reduction potential of using prefabrication
Science and Technology, v 36 (2), pp 141-186. in building construction in Hong Kong. Waste
Management, v 29, pp 309-320.
Chen, Z., Li, H., & Wong, C.T.C. (2002). An application
of bar-code system for reducing construction wastes. Kartam, N., Al-Mutari, N., AL-Ghusain, I., & Al-Humoud,
Automation in Construction, v 11 (5), pp 521-533. J. (2004). Environmental management of construction
and demolition waste in Kuwait. Waste Management,
Chung, S. S., & Lo, C. W. H. (2002). Evaluating sustainability v 24 (10), pp1049-1059.
in waste management: the case of construction and
demolition, chemical and clinical wastes in Hong Kong. Katz, A. & Baum, H. (2011). A novel methodology to estimate
Resources Conservation & Recycling, v 37 (2), pp 119- the evolution of construction waste in construction
145. sites. Waste Management, v 31, pp 353-358.
Del Ro, M., Izquierdo, P., & Salto, I. (2009). Sustainable Keys, A., Baldwin, A., & Austin, S. (2000). Designing to
construction: construction and demolition waste encourage waste minimization in the construction
reconsidered. Waste Management and Research, v 28 industry. Proceedings of CIBSE National Conference
(2), pp 118-129. Dublin 2000. Recuperado el 19 de junio de 2010,
de: http://www.cibse.org/pdfs/Construction%20
Deng, X., Liu, G., & Hao, J. (2008). A study of construction waste%20minim.pdf.
and demolition waste management in Hong Kong.
International Conference on Wireless Communications, Kibert, Ch. (2007). The next generation of sustainable
Networking and Mobile Computing, WiCOM 2008, pp construction. Building Research & Information, v 35
1-4. (6), pp 595-601.
Ekanayake, L.L., & Ofori, G. (2004). Building waste Kofoworola, O.F, & Gheewala, S.H. (2008). Estimation of
assessment score: design-based tool. Building and construction waste generation and management in
Environment, v 39 (7), pp 851-861. Thailand. Waste Management, v 29, pp 731-738.
Revista de la Construccin
14 ] Volumen 12 No 22 - 2012
[ Aldana, J.C. - Serpell, A. ] pginas: 4 - 16
Lu, W. & Yuan, H. (2011). A framework for understanding Poon, C.S., Yu, A.T.W., & Ng, L.H. (2001). On-site sorting
waste management studies in construction. Waste of construction and demolition waste in Hong Kong.
Management, v 31, pp 1252-1260. Resources, Conservation and Recycling, v 32 (2), pp
157-172.
Manuel, J. (2003). Unbuilding for the environment. Environ-
mental Health Perspectives, v 111 (16), pp 880-887. Poon, C.S., Yu, A.T.W., & Jaillon, L. (2004). Reducing
building waste at construction sites in Hong Kong.
Martnez, P. (2003). Rol de la industria de la construccin en Construction Management and Economics, v 22 (5), pp
el desarrollo sustentable. Revista Ambiente y Desarrollo 461-470.
de CIPMA, v XIX (1), pp 19-25.
Rodrguez, G., Alegre, F.J., &Martnez, G. (2006). The
McDonald, B., & Smithers, M. (1998). Implementing a waste contribution of environmental management systems
management plan during the construction phase of a to the management of construction and demolition
project: a case study. Construction Management and waste: The case of the Autonomous Community of
Economics, v 16 (1), pp 71-78. Madrid (Spain). Resources, Conservation and Recycling,
v 50, pp 334-349.
McGrath, C. (2001). Waste minimization in practice.
Resources, Conservation and Recycling, v 32 (3-4), pp Sols-Guzmn, J., Marrero, M., Montes, M.V., & Ramrez,
227-238. A. (2009). A Spanish model for quantication
and management of construction waste. Waste
Moussiopoulos, N., Papadopoulos, A., Iakovou, E., Achillas, Management, v 29 (9), pp 2542-2548.
H., Aidonis, D., Anastaselos, D., & Banias, G. (2007).
Construction and demolition waste management: state Srour, I., Chong, W.K. & Zhang, F. (2010). Sustainable
of the art trends. Proceedings of the 10 International Recycling Approach: An Understanding of
Conference on Environmental Science and Technology. Designersand ContractorRecycling Responsibilities
Throughout the Life Cycle of Buildings in Two US Cities.
Nahmens, I. (2009). From Lean to Green Construction: Sustainable Development.
A Natural Extension. Proceedings of the 2009
Construction Research Congress, pp 1058-1067. Shen, L.Y., Tam, V.W.Y., Tam, C.M., & Ho, S. (2000). Material
wastage in construction activities a Hong Kong
Osmani, M., Glass, J., & Price, A.D.F. (2007). survey. Proceedings of the 1st CIB-W107 International
Architectsperspectives on construction waste reduction Conference Creating a Sustainable Construction
by design. Waste Management, v 28 (7), pp 1147- Industry in Developing Countries, pp 125-131.
1158.
Revista de la Construccin
pginas: 4 - 16
[ Aldana, J.C. - Serpell, A. ] Volumen 12 No 22 - 2012
[ 15
Tam, V.W.Y. (2007). On the effectiveness in implementing Wimalasena, B.A.D.S., Ruwanpura, J.Y., & Hettiaratchi,
a waste-management-plan method in construction. J.P.A. (2010). Construction Research Congress 2010:
Waste Management, v 28, pp 1072-1080. Innovation for Reshaping Construction Practice, pp
1498-1507.
Tam, Vivian W.Y., & Tam, C.M. (2006). Evaluations of
existing waste recycling methods: A Hong Kong study. Yahya, K. & Boussabaine, H. (2006). Eco-costing of
Building and Environment, v 41 (12), p 1649 1660. construction waste. Management of Environmental
Quality: An International Journal, v 17 (1), pp 6-19.
Tam, V.W.Y., Shen, L.Y., & Tam, C.M. (2006 a). Assessing the
levels of material wastage affected by sub-contracting Ye, G., & Yuan, H. (2010). Estimating the generation of
relationships and projects types with their correlations. construction and demolition waste by using system
Building and Environment, v 42 (3), pp 1471-1477. dynamics: a proposed model. 4th International
Conference on Bioinformatics and Biomedical
Tam, Vivian W.Y., & Tam, C.M. (2006). Evaluations of Engineering, iCBBE 2010.
existing waste recycling methods: A Hong Kong study.
Building and Environment, v 41 (12), p 1649 1660. Yuan, H. & Shen, L. (2011). Trend of the research on
construction and demolition waste management.
Tam, V.W.Y., Tam, C.M., Chan, J.K.W., & Ng, W.C.Y. (2006 Waste Management, v 31, pp 670-679.
b). Cutting construction wastes by prefabrication.
International Journal of Construction Management, pp Zhao, W., Leeftink, R.B., & Rotter, V.S. (2009). Evaluation
15-24. of the economic feasibility for the recycling of
construction and demolition waste in China The case
Tam, V. W.Y, & Le, K.N. (2009). On Implementation of Waste of Chongqing. Resources, Conservation and Recycling,
Management Systems in the Hong Kong Construction v 54 (6), pp 377-389.
Revista de la Construccin
16 ] Volumen 12 No 22 - 2012
[ Aldana, J.C. - Serpell, A. ] pginas: 4 - 16