Bar Diameter Kg/m

6 0.222
8 0.395
10 0.617
12 0.888
14 1.208
16 1.578
20 2.466
25 3.853
32 6.313
40 9.865

Section Kg/m
L60x60x6 5.42 A=L60x60x6
BOQ - Civil Works DM 1040 - Btiment de commande

I - Excavation

a) For Levelling
Area (m2) 492

b) For Footings

Width for Length for Depth for Volume Total Volume


Ft. Type Width (m) Length (m) Depth (m) excavation Number
excavation (m) excavation (m) (m) (m3) (m3)

1 1.7 1.9 1.5 1.7 1.5 1.6 5.168 38 196.384


Total Excavation Volume (m3) 196.384

c) For Tie Beams

Width for Depth for Volume Total Volume


TB Type Width (m) excavation (m) Length (m) Depth (m) excavation (m3) Number (m3)
(m)
1 0.5 0.7 1.3 0.5 0.6 0.546 2 1.092
2 0.5 0.7 1.4 0.5 0.6 0.588 1 0.588
3 0.5 0.7 1.5 0.5 0.6 0.63 1 0.63
4 0.5 0.7 1.75 0.5 0.6 0.735 2 1.47
5 0.5 0.7 2.2 0.5 0.6 0.924 1 0.924
6 0.5 0.7 2.25 0.5 0.6 0.945 5 4.725
7 0.5 0.7 2.4 0.5 0.6 1.008 4 4.032
8 0.5 0.7 2.45 0.5 0.6 1.029 1 1.029
9 0.5 0.7 2.5 0.5 0.6 1.05 6 6.3
10 0.5 0.7 2.55 0.5 0.6 1.071 2 2.142
11 0.5 0.7 2.65 0.5 0.6 1.113 1 1.113
12 0.5 0.7 2.7 0.5 0.6 1.134 5 5.67
13 0.5 0.7 2.9 0.5 0.6 1.218 3 3.654
14 0.5 0.7 3 0.5 0.6 1.26 1 1.26
15 0.5 0.7 3.1 0.5 0.6 1.302 3 3.906
16 0.5 0.7 3.2 0.5 0.6 1.344 1 1.344
17 0.5 0.7 3.7 0.5 0.6 1.554 6 9.324
18 0.5 0.7 4.2 0.5 0.6 1.764 1 1.764
19 0.5 0.7 4.3 0.5 0.6 1.806 1 1.806
20 0.5 0.7 4.5 0.5 0.6 1.89 3 5.67
21 0.5 0.7 4.65 0.5 0.6 1.953 2 3.906
22 0.5 0.7 4.7 0.5 0.6 1.974 2 3.948
23 0.5 0.7 5.3 0.5 0.6 2.226 2 4.452
24 0.5 0.7 5.4 0.5 0.6 2.268 3 6.804
25 0.5 0.7 5.7 0.5 0.6 2.394 1 2.394
Total Excavation Volume (m3 ) 79.947

d) For Basement
Area (m2) 159.6
Depth (m) 2
Volume (m) 319.2

III - Concrete Works

Height/Length Area (m2)


Location Type Perimeter (m) (m) Number

For Footings 1 6.4 0.5 38 121.6


For Tie Columns 1 1.6 1 38 60.8
1 2 1.3 2 5.2
2 2 1.4 1 2.8
3 2 1.5 1 3
4 2 1.75 2 7
5 2 2.2 1 4.4
6 2 2.25 5 22.5
7 2 2.4 4 19.2
8 2 2.45 1 4.9
9 2 2.5 6 30
10 2 2.55 2 10.2
Bituminous Paint for 11 2 2.65 1 5.3
Foundations 12 2 2.7 5 27
For Tie Beams 13 2 2.9 3 17.4
14 2 3 1 6
15 2 3.1 3 18.6
16 2 3.2 1 6.4
17 2 3.7 6 44.4
18 2 4.2 1 8.4
19 2 4.3 1 8.6
20 2 4.5 3 27
21 2 4.65 2 18.6
22 2 4.7 2 18.8
23 2 5.3 2 21.2
24 2 5.4 3 32.4
25 2 5.7 1 11.4
Total Area for Bituminous Paint 563.1

Thickness Volume
Location Type Width (m) Length (m) (m) Number (m3)
Under Footings 1 1.9 1.7 0.1 38 12.274
1 0.7 1.3 0.1 2 0.182
2 0.7 1.4 0.1 1 0.098
3 0.7 1.5 0.1 1 0.105
4 0.7 1.75 0.1 2 0.245
5 0.7 2.2 0.1 1 0.154
6 0.7 2.25 0.1 5 0.7875
7 0.7 2.4 0.1 4 0.672
8 0.7 2.45 0.1 1 0.1715
9 0.7 2.5 0.1 6 1.05
10 0.7 2.55 0.1 2 0.357
11 0.7 2.65 0.1 1 0.1855
Lean Concrete 12 0.7 2.7 0.1 5 0.945
Under Tie Beams 13 0.7 2.9 0.1 3 0.609
14 0.7 3 0.1 1 0.21
15 0.7 3.1 0.1 3 0.651
16 0.7 3.2 0.1 1 0.224
17 0.7 3.7 0.1 6 1.554
18 0.7 4.2 0.1 1 0.294
19 0.7 4.3 0.1 1 0.301
20 0.7 4.5 0.1 3 0.945
21 0.7 4.65 0.1 2 0.651
22 0.7 4.7 0.1 2 0.658
23 0.7 5.3 0.1 2 0.742
24 0.7 5.4 0.1 3 1.134
25 0.7 5.7 0.1 1 0.399
Total Volume for Lean Concrete 25.5985

Total
Ft. Type Width (m) Length (m) Depth (m) Volume (m3) Number Volume
(m3)
a) Footings 1 1.7 1.5 0.5 1.275 38 48.45
Total Volume / Footings 48.45
Steel Ratio (Kg/m) 83
Steel (Kg) 4021.35

Total
TC Type Width (m) Length (m) Depth (m) Volume (m3) Number Volume
(m3)
b) Tie Columns 1 0.5 1 0.3 0.15 38 5.7
Total Volume / Tie Columns 5.7
Steel Ratio (Kg/m) 176
Steel (Kg) 1003.2

Total
TB Type Width (m) Length (m) Depth (m) Volume (m ) Number
3
Volume
(m3)
1 0.5 1.3 0.5 0.325 2 0.65 2.6
2 0.5 1.4 0.5 0.35 1 0.35 1.4
3 0.5 1.5 0.5 0.375 1 0.375 1.5
4 0.5 1.75 0.5 0.4375 2 0.875 3.5
5 0.5 2.2 0.5 0.55 1 0.55 2.2
6 0.5 2.25 0.5 0.5625 5 2.8125 11.25
7 0.5 2.4 0.5 0.6 4 2.4 9.6
8 0.5 2.45 0.5 0.6125 1 0.6125 2.45
9 0.5 2.5 0.5 0.625 6 3.75 15
10 0.5 2.55 0.5 0.6375 2 1.275 5.1
11 0.5 2.65 0.5 0.6625 1 0.6625 2.65
12 0.5 2.7 0.5 0.675 5 3.375 13.5
c) Tie Beams 13 0.5 2.9 0.5 0.725 3 2.175 8.7
14 0.5 3 0.5 0.75 1 0.75 3
15 0.5 3.1 0.5 0.775 3 2.325 9.3
16 0.5 3.2 0.5 0.8 1 0.8 3.2
17 0.5 3.7 0.5 0.925 6 5.55 22.2
18 0.5 4.2 0.5 1.05 1 1.05 4.2
19 0.5 4.3 0.5 1.075 1 1.075 4.3
20 0.5 4.5 0.5 1.125 3 3.375 13.5
21 0.5 4.65 0.5 1.1625 2 2.325 9.3
22 0.5 4.7 0.5 1.175 2 2.35 9.4
23 0.5 5.3 0.5 1.325 2 2.65 10.6
24 0.5 5.4 0.5 1.35 3 4.05 16.2
25 0.5 5.7 0.5 1.425 1 1.425 5.7
Total Volume / Tie Beams 47.5875 190.35
Steel Ratio (Kg/m) 43
Steel (Kg) 2046.2625

Total
TB Type Width (m) Height (m) Thickness (m) Volume (m3) Number Volume
(m3)
1 9.3 2 0.3 5.58 2 11.16
c') Basement Walls
2 14 2 0.3 8.4 2 16.8
Total Volume / Tie Beams 27.96
Steel Ratio (Kg/m) 95
Steel (Kg) 2656.2

Area (m) Thickness (m) Volume (m3)


130.2 0.2 26.04
d) Slab on Grade
Steel Ratio (Kg/m) 84
Steel (Kg) 2187.36

Total
Column Type Width (m) Length (m) Height (m) Volume (m3) Number Volume
(m3)
Basement 0.5 0.3 2 0.3 38 11.4
e) Columns
Superstructure 0.5 0.3 4 0.6 38 22.8
Total Volume / Columns 34.2
Steel Ratio (Kg/m) 192
Steel (Kg) 6566.4

Width (m) Height (m) Length (m) Volume (m3)


0.5 0.5 190.35 47.5875
f) Beams
Steel Ratio (Kg/m) 195
Steel (Kg) 9279.5625

Type Area (m) Thickness (m) Volume (m3)

GF 326.6 0.2 65.32


g) C-Span Slab Roof 326.6 0.2 65.32
Total Volume / Slabs 130.64
Steel Ratio (Kg/m) 122
Steel (Kg) 15938.08

Type Section (m2) Perimeter (m) Volume (m3)

1 0.28 46.6 13.048


h) Parapets
Total Volume /Parapets 13.048
Steel Ratio (Kg/m) 65
Steel (Kg) 848.12

Total
Lintel Type Length (m) Thickness (m) Depth (m) Volume (m3) Number Volume
(m3)
1 1.2 0.3 0.2 0.072 6 0.432
2 1.4 0.3 0.2 0.084 16 1.344
i) Lintels 3 1.9 0.3 0.2 0.114 1 0.114
4 2.4 0.3 0.2 0.144 1 0.144
5 3.4 0.3 0.2 0.204 2 0.408
Total Volume / Lintels 2.442
Steel Ratio (Kg/m) 105
Steel (Kg) 256.41

IV - Masonry Works

Type Length (m) Height (m) Area (m2)


a) External Wall 1 (30cm) 652.4 4 2609.6
Total Area 2609.6
Type Length (m) Height (m) Area (m2)
1 (10cm) 11.2 4 44.8
b) Internal Wall
2 (20cm) 35.7 4 142.8
Total Area 187.6

V - Finishing

Tiling (m): WC 4.9


Floor Paint (m): Peinture anti-
poussire 274.3
Floor Finishing
Floor Paint (m): Peinture anti-acide 16
(salle de batterie)
Plaster (m) 6899.2 external wall double face + basement 1 face H =2
Wall Finishing
Wall Paint (m) 13798.4 2 couches
False Ceiling (m) 61.9
Ceiling Finishing
Ceiling Paint (m) 186.1
Bitumen (m2) 326.6
Roof Treatment Screed 100mm th (m3 ): isolation 32.66
thermique
Sideway (m) 63.5
Sideway Finishing
Curbstone (m) 79.5

VI - Openings

Type Dimensions number


3m x 3m 2
Double
1.5m x 2.1m 1
i) External Doors
a) Doors 1m x 2.1m 1
Single
0.8m x 2.1m 2
Grillage 2m x 3m 1
ii) Internal Doors Single 1m x 2.1m 4

b) Aluminium Windows + Type number


Moustiquaires
1.2m x 1.2m 14

Recap Bt com DM 1040

Levelling 492 m
Excavation
Structure 595.531 m
Bitumen Structure 563.1 m
LC 25.5985 m
RC found 101.7375 m
Concrete Steel 7070.8125 kg
RC Supers 253.9575 m
Steel 37732.1325 kg
External W (30cm) 2609.6 m
Masonry Internal W (10cm) 44.8 m
Internal W (20cm) 142.8 m
Tiling 4.9 m
Floor Finishing Floor paint: anti poussire 274.3 m
Floor paint: anti acide 16 m
Plaster 6899.2 m
Wall Finishing
Wall paint 13798.4 m
False ceiling 61.9 m
Ceiling Finishing
Ceiling Paint 186.1 m
Bitumen 326.6 m
Roof Treatment
Screed 32.66 m
Area 63.5 m
Sideway Finishing
Curb 79.5 m
D 3m x 3m 2 U
D 1.5m x 2.1m 1 U
S 1m x 2.1m 1 U
Doors
S 0.8m x 2.1m 2 U
G 2m x 3m 1 U
S 1m x 2.1m 4 U
Windows 1.2m x 1.2m 14 U
BOQ - Civil Works DM 1040 - Villa

I - Excavation

a) For Levelling
Area (m 2) 302

b) For Footings
Depth for
Ft. Type Width (m) Width for Length (m) Length for Depth (m) excavation Volume Number Total Volume
excavation (m) excavation (m) (m3) (m3)
(m)
1 1.5 1.7 1.2 1.4 1.5 1.6 3.808 16 60.928
Total Excavation Volume (m3) 60.928

c) For Tie Beams

Width for Depth for Volume Total Volume


TB Type Width (m) Length (m) Depth (m) excavation Number
excavation (m) (m) (m3) (m3)

1 0.5 0.7 1.4 0.5 0.6 0.588 2 1.176


2 0.5 0.7 1.6 0.5 0.6 0.672 2 1.344
3 0.5 0.7 1.8 0.5 0.6 0.756 1 0.756
4 0.5 0.7 2 0.5 0.6 0.84 1 0.84
5 0.5 0.7 2.5 0.5 0.6 1.05 1 1.05
6 0.5 0.7 2.7 0.5 0.6 1.134 3 3.402
7 0.5 0.7 2.9 0.5 0.6 1.218 1 1.218
8 0.5 0.7 3.5 0.5 0.6 1.47 2 2.94
9 0.5 0.7 3.6 0.5 0.6 1.512 2 3.024
10 0.5 0.7 3.7 0.5 0.6 1.554 6 9.324
11 0.5 0.7 3.8 0.5 0.6 1.596 4 6.384
12 0.5 0.7 4.8 0.5 0.6 2.016 1 2.016
13 0.5 0.7 5.3 0.5 0.6 2.226 2 4.452
Total Excavation Volume (m3) 37.926

III - Concrete Works

Location Type Perimeter (m) Height/Length Number Area (m2)


(m)
For Footings 1 5.4 0.5 16 43.2
For Tie Columns 1 1.4 1 16 22.4
1 2 1.4 2 5.6
2 2 1.6 2 6.4
3 2 1.8 1 3.6
4 2 2 1 4
Bituminous Paint for 5 2 2.5 1 5
Foundations 6 2 2.7 3 16.2
For Tie Beams 7 2 2.9 1 5.8
8 2 3.5 2 14
9 2 3.6 2 14.4
10 2 3.7 6 44.4
11 2 3.8 4 30.4
12 2 4.8 1 9.6
13 2 5.3 2 21.2
Total Area for Bituminous Paint 246.2

Thickness Volume
Location Type Width (m) Length (m) (m) Number
(m3)
Under Footings 1 1.7 1.4 0.1 16 3.808
1 0.7 1.4 0.1 2 0.196
2 0.7 1.6 0.1 2 0.224
3 0.7 1.8 0.1 1 0.126
4 0.7 2 0.1 1 0.14
5 0.7 2.5 0.1 1 0.175
Lean Concrete 6 0.7 2.7 0.1 3 0.567
Under Tie Beams 7 0.7 2.9 0.1 1 0.203
8 0.7 3.5 0.1 2 0.49
9 0.7 3.6 0.1 2 0.504
10 0.7 3.7 0.1 6 1.554
11 0.7 3.8 0.1 4 1.064
12 0.7 4.8 0.1 1 0.336
13 0.7 5.3 0.1 2 0.742
Total Volume for Lean Concrete 10.129

Total
Ft. Type Width (m) Length (m) Depth (m) Volume (m3) Number Volume
(m3)
a) Footings 1 1.5 1.2 0.5 0.9 16 14.4
Total Volume / Footings 14.4
Steel Ratio (Kg/m) 83
Steel (Kg) 1195.2

Total
TC Type Width (m) Length (m) Depth (m) Volume (m )3
Number Volume
(m3)
b) Tie Columns 1 0.5 1 0.2 0.1 16 1.6
Total Volume / Tie Columns 1.6
Steel Ratio (Kg/m) 176
Steel (Kg) 281.6

Total
TB Type Width (m) Length (m) Depth (m) Volume (m3) Number Volume
(m3)
1 0.5 1.4 0.5 0.35 2 0.7 2.8
2 0.5 1.6 0.5 0.4 2 0.8 3.2
3 0.5 1.8 0.5 0.45 1 0.45 1.8
4 0.5 2 0.5 0.5 1 0.5 2
5 0.5 2.5 0.5 0.625 1 0.625 2.5
6 0.5 2.7 0.5 0.675 3 2.025 8.1
c) Tie Beams 7 0.5 2.9 0.5 0.725 1 0.725 2.9
8 0.5 3.5 0.5 0.875 2 1.75 7
9 0.5 3.6 0.5 0.9 2 1.8 7.2
10 0.5 3.7 0.5 0.925 6 5.55 22.2
11 0.5 3.8 0.5 0.95 4 3.8 15.2
12 0.5 4.8 0.5 1.2 1 1.2 4.8
13 0.5 5.3 0.5 1.325 2 2.65 10.6
Total Volume / Tie Beams 22.575 90.3
Steel Ratio (Kg/m) 43
Steel (Kg) 970.725

Area (m) Thickness (m) Volume (m3)


125.65 0.2 25.13
d) Slab on Grade
Steel Ratio (Kg/m) 84
Steel (Kg) 2110.92

Total
Column Type Width (m) Length (m) Height (m) Volume (m3) Number Volume
(m3)
e) Columns Superstructure 0.5 0.2 2.6 0.26 16 4.16
Total Volume / Columns 4.16
Steel Ratio (Kg/m) 192
Steel (Kg) 798.72

Width (m) Height (m) Length (m) Volume (m3)


0.5 0.5 90.3 22.575
f) Beams
Steel Ratio (Kg/m) 195
Steel (Kg) 4402.125

Type Area (m) Thickness (m) Volume (m3)

Roof 125.65 0.2 25.13


g) C-Span Slab
Total Volume / Slabs 25.13
Steel Ratio (Kg/m) 122
Steel (Kg) 3065.86

Type Section (m2) Perimeter (m) Volume (m3)

1 0.28 43.6 12.208


h) Parapets
Total Volume /Parapets 12.208
Steel Ratio (Kg/m) 65
Steel (Kg) 793.52

Total
Lintel Type Length (m) Thickness (m) Depth (m) Volume (m3) Number Volume
(m3)
1 1.2 0.2 0.2 0.048 8 0.384
2 1.4 0.2 0.2 0.056 2 0.112
3 0.8 0.2 0.2 0.032 2 0.064
i) Lintels
4 1.9 0.2 0.2 0.076 2 0.152
5 2 0.2 0.2 0.08 2 0.16
6 2.2 0.2 0.2 0.088 1 0.088
Total Volume / Lintels 0.96
Steel Ratio (Kg/m) 105
Steel (Kg) 100.8

IV - Masonry Works

Type Length (m) Height (m) Area (m2)


a) External Wall 1 (20cm) 43.6 2.6 113.36
Total Area 113.36
Type Length (m) Height (m) Area (m2)
1 (15cm) 21.5 2.6 55.9
b) Internal Wall
2 (20cm) 19.4 2.6 50.44
Total Area 106.34

V - Finishing

Floor Finishing Tiling (m) 94


Plaster (m) 439.4 external wall double face
Wall Finishing
Wall Paint (m) 878.8 2 couches
Ceiling Finishing Ceiling Paint (m) 95
Bitumen (m 2) 118
Roof Treatment
Screed 100mm th (m 3) 11.8

VI - Openings

Type Dimensions number


i) External Doors
a) Doors Single 1m x 2.1m 2
ii) Internal Doors Single 0.8m x 2.1m 8

Type number

b) Aluminium Windows + 0.6m x 0.6m 2


Moustiquaires 1.5m x 1.2m 2
1.6m x 1.2m 2
1.8m x 1.2m 1

Recap Villa DM 1040

Levelling 302 m
Excavation
Structure 98.854 m
Bitumen Structure 246.2 m
LC 10.129 m
RC found 38.575 m
Concrete Steel 4558.445 kg
RC Supers 90.163 m
Steel 9161.025 kg
External W (20cm) 113.36 m
Masonry Internal W (15cm) 55.9 m
Internal W (20cm) 50.44 m
Floor Finishing Tiling 94 m
Plaster 439.4 m
Wall Finishing
Wall paint 878.8 m
Ceiling Finishing Ceiling Paint 95 m
Bitumen 118 m
Roof Treatment
Screed 11.8 m
S 1m x 2.1m 2 U
Doors
S 0.8m x 2.1m 8 U
0.6m x 0.6m 2 U
1.5m x 1.2m 2 U
Windows
1.6m x 1.2m 2 U
1.8m x 1.2m 1 U
BOQ - Civil Works DM 1040 - Logements jumels

I - Excavation

a) For Levelling
Area (m2) 347

b) For Footings
Depth for
Width for Length for Volume Total Volume
Ft. Type Width (m) Length (m) Depth (m) excavation Number
excavation (m) excavation (m) (m) (m3) (m3)

1 1.5 1.7 1.2 1.4 1.5 1.6 3.808 19 72.352


Total Excavation Volume (m3) 72.352

c) For Tie Beams


Depth for
Width for Volume Total Volume
TB Type Width (m) Length (m) Depth (m) excavation Number
excavation (m) (m) (m3) (m3)

1 0.5 0.7 1.35 0.5 0.6 0.567 2 1.134


2 0.5 0.7 1.55 0.5 0.6 0.651 1 0.651
3 0.5 0.7 1.75 0.5 0.6 0.735 1 0.735
4 0.5 0.7 1.8 0.5 0.6 0.756 2 1.512
5 0.5 0.7 1.95 0.5 0.6 0.819 1 0.819
6 0.5 0.7 2.2 0.5 0.6 0.924 1 0.924
7 0.5 0.7 2.85 0.5 0.6 1.197 2 2.394
8 0.5 0.7 3.15 0.5 0.6 1.323 1 1.323
9 0.5 0.7 3.3 0.5 0.6 1.386 2 2.772
10 0.5 0.7 3.4 0.5 0.6 1.428 3 4.284
11 0.5 0.7 3.55 0.5 0.6 1.491 4 5.964
12 0.5 0.7 3.7 0.5 0.6 1.554 5 7.77
13 0.5 0.7 3.8 0.5 0.6 1.596 1 1.596
14 0.5 0.7 3.85 0.5 0.6 1.617 1 1.617
15 0.5 0.7 4.6 0.5 0.6 1.932 1 1.932
16 0.5 0.7 7.05 0.5 0.6 2.961 1 2.961
Total Excavation Volume (m3) 38.388

III - Concrete Works

Height/Length
Location Type Perimeter (m) (m) Number Area (m2)

For Footings 1 5.4 0.5 19 51.3


For Tie Columns 1 1.4 1 19 26.6
1 2 1.35 2 5.4
2 2 1.55 1 3.1
3 2 1.75 1 3.5
4 2 1.8 2 7.2
5 2 1.95 1 3.9
6 2 2.2 1 4.4
Bituminous Paint for
Foundations 7 2 2.85 2 11.4
8 2 3.15 1 6.3
For Tie Beams
9 2 3.3 2 13.2
10 2 3.4 3 20.4
11 2 3.55 4 28.4
12 2 3.7 5 37
13 2 3.8 1 7.6
14 2 3.85 1 7.7
15 2 4.6 1 9.2
16 2 7.05 1 14.1
Total Area for Bituminous Paint 260.7

Thickness Volume
Location Type Width (m) Length (m) Number
(m) (m3)
Under Footings 1 1.7 1.4 0.1 19 4.522
1 0.7 1.35 0.1 2 0.189
2 0.7 1.55 0.1 1 0.1085
3 0.7 1.75 0.1 1 0.1225
4 0.7 1.8 0.1 2 0.252
5 0.7 1.95 0.1 1 0.1365
6 0.7 2.2 0.1 1 0.154
7 0.7 2.85 0.1 2 0.399
Lean Concrete
8 0.7 3.15 0.1 1 0.2205
Under Tie Beams
9 0.7 3.3 0.1 2 0.462
10 0.7 3.4 0.1 3 0.714
11 0.7 3.55 0.1 4 0.994
12 0.7 3.7 0.1 5 1.295
13 0.7 3.8 0.1 1 0.266
14 0.7 3.85 0.1 1 0.2695
15 0.7 4.6 0.1 1 0.322
16 0.7 7.05 0.1 1 0.4935
Total Volume for Lean Concrete 10.92

Total
Ft. Type Width (m) Length (m) Depth (m) Volume (m3) Number Volume
(m3)
a) Footings 1 1.5 1.2 0.5 0.9 19 17.1
Total Volume / Footings 17.1
Steel Ratio (Kg/m) 83
Steel (Kg) 1419.3

Total
TC Type Width (m) Length (m) Depth (m) Volume (m3) Number Volume
(m3)
b) Tie Columns 1 0.5 1 0.2 0.1 19 1.9
Total Volume / Tie Columns 1.9
Steel Ratio (Kg/m) 176
Steel (Kg) 334.4

Total
TB Type Width (m) Length (m) Depth (m) Volume (m3) Number Volume
(m3)
1 0.5 1.35 0.5 0.3375 2 0.675 2.7
2 0.5 1.55 0.5 0.3875 1 0.3875 1.55
3 0.5 1.75 0.5 0.4375 1 0.4375 1.75
4 0.5 1.8 0.5 0.45 2 0.9 3.6
5 0.5 1.95 0.5 0.4875 1 0.4875 1.95
6 0.5 2.2 0.5 0.55 1 0.55 2.2
7 0.5 2.85 0.5 0.7125 2 1.425 5.7
8 0.5 3.15 0.5 0.7875 1 0.7875 3.15
c) Tie Beams
9 0.5 3.3 0.5 0.825 2 1.65 6.6
10 0.5 3.4 0.5 0.85 3 2.55 10.2
11 0.5 3.55 0.5 0.8875 4 3.55 14.2
12 0.5 3.7 0.5 0.925 5 4.625 18.5
13 0.5 3.8 0.5 0.95 1 0.95 3.8
14 0.5 3.85 0.5 0.9625 1 0.9625 3.85
15 0.5 4.6 0.5 1.15 1 1.15 4.6
16 0.5 7.05 0.5 1.7625 1 1.7625 7.05
Total Volume / Tie Beams 22.85 91.4
Steel Ratio (Kg/m) 43
Steel (Kg) 982.55

Area (m) Thickness (m) Volume (m3)


151 0.2 30.2
d) Slab on Grade
Steel Ratio (Kg/m) 84
Steel (Kg) 2536.8

Total
Column Type Width (m) Length (m) Height (m) Volume (m3) Number Volume
(m3)
e) Columns Superstructure 0.5 0.2 2.6 0.26 19 4.94
Total Volume / Columns 4.94
Steel Ratio (Kg/m) 192
Steel (Kg) 948.48

Width (m) Height (m) Length (m) Volume (m3)


0.5 0.5 91.4 22.85
f) Beams
Steel Ratio (Kg/m) 195
Steel (Kg) 4455.75

Type Area (m) Thickness (m) Volume (m3)

Roof 151 0.2 30.2


g) C-Span Slab
Total Volume / Slabs 30.2
Steel Ratio (Kg/m) 122
Steel (Kg) 3684.4

Type Section (m2) Perimeter (m) Volume (m3)

1 0.28 53.2 14.896


h) Parapets
Total Volume /Parapets 14.896
Steel Ratio (Kg/m) 65
Steel (Kg) 968.24

Total
Lintel Type Length (m) Thickness (m) Depth (m) Volume (m3) Number Volume
(m3)
1 1 0.2 0.2 0.04 2 0.08
2 1.2 0.2 0.2 0.048 6 0.288
3 1.4 0.2 0.2 0.056 4 0.224
i) Lintels
4 1.6 0.2 0.2 0.064 2 0.128
5 1.9 0.2 0.2 0.076 2 0.152
6 2.4 0.2 0.2 0.096 2 0.192
Total Volume / Lintels 1.064
Steel Ratio (Kg/m) 105
Steel (Kg) 111.72

IV - Masonry Works

Type Length (m) Height (m) Area (m2)


a) External Wall 1 (20cm) 53.2 2.6 138.32
Total Area 138.32
Type Length (m) Height (m) Area (m2)
b) Internal Wall 1 (20cm) 36.1 2.6 93.86
Total Area 93.86

V - Finishing

Floor Finishing Tiling (m): WC 111


Plaster (m) 464.36
Wall Finishing
Wall Paint (m) 928.72 2 couches
Ceiling Finishing Ceiling Paint (m) 113
Bitumen (m2) 151
Roof Treatment
Screed 100mm th (m3) 15.1

VI - Openings

Type Dimensions number


i) External Doors
a) Doors Single 1m x 2.1m 4
ii) Internal Doors Single 0.8m x 2.1m 6

Type number

b) Aluminium Windows + 0.6m x 0.6m 2


Moustiquaires 1.2m x 1.2m 2
1.5m x 1.2m 2
2m x 1.2m 2

Recap L J DM 1040

Levelling 347 m
Excavation
Structure 110.74 m
Bitumen Structure 260.7 m
LC 10.92 m
RC found 41.85 m
Concrete Steel 5273.05 kg
RC Supers 104.15 m
Steel 10168.59 kg
External W (20cm) 138.32 m
Masonry
Internal W (20cm) 93.86 m
Floor Finishing Tiling 111 m
Plaster 464.36 m
Wall Finishing
Wall paint 928.72 m
Ceiling Finishing Ceiling Paint 113 m
Bitumen 151 m
Roof Treatment
Screed 15.1 m
S 1m x 2.1m 4 U
Doors
S 0.8m x 2.1m 6 U
0.6m x 0.6m 2 U
1.2m x 1.2m 2 U
Windows
1.5m x 1.2m 2 U
2m x 1.2m 2 U
BOQ - Civil Works DM 1040 - Gurite

I - Excavation

a) For Levelling
Area (m2) 56

b) For Footings
Depth for
Ft. Type Width (m) Width for Length (m) Length for Depth (m) Volume Number Total Volume
excavation
excavation (m) excavation (m) (m) (m3) (m3)

1 0.9 1.1 0.9 1.1 1.5 1.6 1.936 8 15.488


Total Excavation Volume (m3) 15.488

c) For Tie Beams


Depth for
TB Type Width (m) Width for Length (m) Depth (m) excavation Volume Number Total Volume
excavation (m) (m3) (m3)
(m)
1 0.3 0.5 0.9 0.5 0.6 0.27 4 1.08
2 0.3 0.5 1.35 0.5 0.6 0.405 1 0.405
3 0.3 0.5 2.05 0.5 0.6 0.615 3 1.845
4 0.3 0.5 2.65 0.5 0.6 0.795 3 2.385
Total Excavation Volume (m3) 5.715

III - Concrete Works

Location Type Perimeter (m) Height/Length Number


(m) Area (m2)

For Footings 1 3.6 0.5 8 14.4


For Tie Columns 1 0.8 1 8 6.4
Bituminous Paint for
Foundations 1 1.6 0.9 4 5.76
2 1.6 1.35 1 2.16
For Tie Beams
3 1.6 2.05 3 9.84
4 1.6 2.65 3 12.72
Total Area for Bituminous Paint 51.28

Location Type Width (m) Length (m) Thickness Number Volume


(m) (m3)
Under Footings 1 1.1 1.1 0.1 8 0.968
1 0.5 0.9 0.1 4 0.18
Lean Concrete
2 0.5 1.35 0.1 1 0.0675
Under Tie Beams
3 0.5 2.05 0.1 3 0.3075
4 0.5 2.65 0.1 3 0.3975
Total Volume for Lean Concrete 1.9205

Total
Ft. Type Width (m) Length (m) Depth (m) Volume (m3) Number Volume
(m3)
a) Footings 1 0.9 0.9 0.5 0.405 8 3.24
Total Volume / Footings 3.24
Steel Ratio (Kg/m) 83
Steel (Kg) 268.92

Total
TC Type Width (m) Length (m) Depth (m) Volume (m )3
Number Volume
(m3)
b) Tie Columns 1 0.2 1 0.2 0.04 8 0.32
Total Volume / Tie Columns 0.32
Steel Ratio (Kg/m) 176
Steel (Kg) 56.32

Total
TB Type Width (m) Length (m) Depth (m) Volume (m 3) Number Volume
(m3)
1 0.3 0.9 0.5 0.135 4 0.54 3.6
2 0.3 1.35 0.5 0.2025 1 0.2025 1.35
c) Tie Beams
3 0.3 2.05 0.5 0.3075 3 0.9225 6.15
4 0.3 2.65 0.5 0.3975 3 1.1925 7.95
Total Volume / Tie Beams 2.8575 19.05
Steel Ratio (Kg/m) 43
Steel (Kg) 122.8725

Area (m) Thickness (m) Volume (m 3)


11.5 0.2 2.3
d) Slab on Grade
Steel Ratio (Kg/m) 84
Steel (Kg) 193.2

Total
Column Type Width (m) Length (m) Height (m) Volume (m 3) Number Volume
(m3)
e) Columns Superstructure 0.2 0.2 2.6 0.104 8 0.832
Total Volume / Columns 0.832
Steel Ratio (Kg/m) 192
Steel (Kg) 159.744

Width (m) Height (m) Length (m) Volume (m 3)


0.5 0.5 19.05 4.7625
f) Beams
Steel Ratio (Kg/m) 195
Steel (Kg) 928.6875

Type Area (m) Thickness (m) Volume (m 3)

Roof 11.5 0.2 2.3


g) C-Span Slab
Total Volume / Slabs 2.3
Steel Ratio (Kg/m) 122
Steel (Kg) 280.6

Type Section (m 2) Perimeter (m) Volume (m 3)

1 0.28 14.2 3.976


h) Parapets
Total Volume /Parapets 3.976
Steel Ratio (Kg/m) 65
Steel (Kg) 258.44

Total
Lintel Type Length (m) Thickness (m) Depth (m) Volume (m 3) Number Volume
(m3)
1 1 0.2 0.2 0.04 1 0.04
i) Lintels 2 1.4 0.2 0.2 0.056 2 0.112
3 2 0.2 0.2 0.08 3 0.24
Total Volume / Lintels 0.392
Steel Ratio (Kg/m) 105
Steel (Kg) 41.16

IV - Masonry Works

Type Length (m) Height (m) Area (m2)


a) External Wall 1 (20cm) 14.2 2.6 36.92
Total Area 36.92
Type Length (m) Height (m) Area (m2)
b) Internal Wall 1 (20cm) 2.25 2.6 5.85
Total Area 5.85

V - Finishing

Floor Finishing Tiling (m): WC 8.6


Plaster (m) 85.54
Wall Finishing
Wall Paint (m) 171.08 2 couches
Ceiling Finishing Ceiling Paint (m) 11.5
Bitumen (m ) 2
11.5
Roof Treatment
Screed 100mm th (m3) 1.15
Sideway (m) 16.02
Sideway Finishing
Curbstone (m) 21.4

VI - Openings

Type Dimensions number


a) Doors i) External Doors
Single 1m x 2.1m 2

Type number
b) Aluminium Windows + 0.6m x 0.6m 1
Moustiquaires
1.3m x 1.2m 2
1.8m x 1.2m 1

Recap Gurite d'entre DM 1040

Levelling 56 m
Excavation
Structure 21.203 m
Bitumen Structure 51.28 m
LC 1.9205 m
RC found 6.4175 m
Concrete Steel 641.3125 kg
RC Supers 14.5625 m
Steel 1668.6315 kg
External W (20cm) 36.92 m
Masonry
Internal W (20cm) 5.85 m
Floor Finishing Tiling 8.6 m
Plaster 85.54 m
Wall Finishing
Wall paint 171.08 m
Ceiling Finishing Ceiling Paint 11.5 m
Bitumen 11.5 m
Roof Treatment
Screed 1.15 m
Area 16.02 m
Sideway Finishing
Curb 21.4 m
Doors S 1m x 2.1m 2 U
0.6m x 0.6m 1 U
Windows 1.3m x 1.2m 2 U
1.8m x 1.2m 1 U
Site Civil Works