ANALISIS DE COSTOS UNITARIOS

EXCAVACION DE ZANJAS UNIDAD: M3


DESCRIPCION UND A.U. P.U. PARCIAL
MANO DE OBRA
PEON hh 2.29 6.87 15.73
EQUIPO/HERRAM
HERRAMIENTA % 3.00 15.73 0.47
16.20

CIMIENTO CORRIDO 1:10 + 30% P.G. UNIDAD: M3


DESCRIPCION UND A.U. P.U. PARCIAL
MANO DE OBRA
OPERARIO hh 0.35 8.57 3.00
OFICIAL hh 0.64 7.70 4.93
PEON hh 2.56 6.87 17.59
MATERIALES
CEMENTO PORT. TIPBLS 3.00 13.00 39.00
PIEDRA GRANDE M3 0.50 25.00 12.50
HORMIGON M3 0.91 15.00 13.65
EQUIPO/HERRAM
HERRAMIENTA % 3.00 25.51 0.77
91.43

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M. UNIDAD: M3


DESCRIPCION UND A.U. P.U. PARCIAL
MANO DE OBRA
OPERARIO hh 1.28 8.57 10.97
OFICIAL hh 1.28 7.70 9.86
PEON hh 5.12 6.87 35.17
MATERIALES
CEMENTO PORT. TIPBLS 3.65 13.00 47.45
PIEDRA MEDIANA M3 0.41 30.00 12.30
HORMIGON M3 0.97 15.00 14.55
EQUIPO/HERRAM
HERRAMIENTA % 3.00 56.00 1.68
131.98

SOBRECIMIENTO ENCOFRADO Y DESENCO UNIDAD: M2


DESCRIPCION UND A.U. P.U. PARCIAL
MANO DE OBRA
OPERARIO hh 0.50 8.57 4.29
OFICIAL hh 0.50 7.70 3.85
MATERIALES
ALAMBRE NEGRO 8 KG 0.26 2.00 0.52
CLAVOS MADERA 3"KG 0.13 2.00 0.26
MADERA TORNILLO P2 4.83 2.70 13.04
EQUIPO/HERRAM
HERRAMIENTA % 3.00 8.14 0.24
22.20

COLUMNA CONCRETO F'C 175 KG/CM2 UNIDAD: M3


DESCRIPCION UND A.U. P.U. PARCIAL
MANO DE OBRA
OPERARIO hh 1.33 8.57 11.40
OFICIAL hh 0.67 7.70 5.16
PEON hh 8.00 6.87 54.96
MATERIALES
CEMENTO PORT. TIPBLS 7.75 13.00 100.75
PIEDRA CHANCADA MD3 0.85 30.00 25.50
ARENA M3 0.50 15.00 7.50
EQUIPO/HERRAM
HERRAMIENTA % 3.00 71.52 2.15
207.41

COLUMNAS ENCOFRADO Y DESENCOFRADO UNIDAD: M2


DESCRIPCION UND A.U. P.U. PARCIAL
MANO DE OBRA
OPERARIO hh 0.88 8.57 7.54
OFICIAL hh 0.88 7.70 6.78
MATERIALES
ALAMBRE NEGRO 8 KG 0.30 2.00 0.60
CLAVOS MADERA 3"KG 0.30 2.00 0.60
MADERA TORNILLO P2 3.69 2.70 9.96
EQUIPO/HERRAM
HERRAMIENTA % 3.00 14.32 0.43
25.91

COLUMNAS ACERO 4200 KG/CM2 UNIDAD: KG


DESCRIPCION UND A.U. P.U. PARCIAL
MANO DE OBRA
OPERARIO hh 0.04 8.57 0.34
OFICIAL hh 0.04 7.70 0.31
PEON hh 0.03 6.87 0.21
MATERIALES
ALAMBRE NEGRO 8 KG 0.02 2.00 0.04
FIERRO CORRUGAD KG 1.05 1.50 1.58
EQUIPO/HERRAM
CIZALLA hm 0.04 2.00 0.08
2.56

MUROS DE LADRILLO KK 18 HUECOS UNIDAD: M2


DESCRIPCION UND A.U. P.U. PARCIAL
MANO DE OBRA
OPERARIO hh 0.85 8.57 7.28
PEON hh 0.72 6.87 4.95
MATERIALES
LADRILLO KK 18 HU UND 39.00 0.30 11.70
ARENA M3 0.03 16.00 0.50
MADERA TORNILLO P2 0.46 2.70 1.24
CEMENTO BLS 0.10 13.00 1.30
EQUIPO/HERRAM
HERRAMIENTA % 3.00 12.23 0.37
27.34
ANALISIS DE COSTOS UNITARIOS
IU METRADOS
A B
EXCAVACION DE ZANJAS UNIDAD: M3
DESCRIPCION UND A.U. P.U. PARCIAL IU
MANO DE OBRA
PEON hh 2.29 6.87 15.73 47 100.00
EQUIPO/HERRAM
HERRAMIENTA % 3.00 15.73 0.47 37 100.00
16.20

CIMIENTO CORRIDO 1:10 + 30% P.G. UNIDAD: M3


DESCRIPCION UND A.U. P.U. PARCIAL IU
MANO DE OBRA
OPERARIO hh 0.35 8.57 3.00 47 100.00
OFICIAL hh 0.64 7.70 4.93 47 100.00
PEON hh 2.56 6.87 17.59 47 100.00
MATERIALES
CEMENTO PORT. TIPBLS 3.00 13.00 39.00 21 100.00
PIEDRA GRANDE M3 0.50 25.00 12.50 5 100.00
HORMIGON M3 0.91 15.00 13.65 38 100.00
EQUIPO/HERRAM
HERRAMIENTA % 3.00 25.51 0.77 37 100.00
91.43

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M. UNIDAD: M3


DESCRIPCION UND A.U. P.U. PARCIAL IU
MANO DE OBRA
OPERARIO hh 1.28 8.57 10.97 47 50.00
OFICIAL hh 1.28 7.70 9.86 47 50.00
PEON hh 5.12 6.87 35.17 47 50.00
MATERIALES
CEMENTO PORT. TIPBLS 3.65 13.00 47.45 21 50.00
PIEDRA MEDIANA M3 0.41 30.00 12.30 5 50.00
HORMIGON M3 0.97 15.00 14.55 38 50.00
EQUIPO/HERRAM
HERRAMIENTA % 3.00 56.00 1.68 37 50.00
131.98

SOBRECIMIENTO ENCOFRADO Y DESENCO UNIDAD: M2


DESCRIPCION UND A.U. P.U. PARCIAL IU
MANO DE OBRA
OPERARIO hh 0.50 8.57 4.29 47 20.00
OFICIAL hh 0.50 7.70 3.85 47 20.00
MATERIALES
ALAMBRE NEGRO 8 KG 0.26 2.00 0.52 2 20.00
CLAVOS MADERA 3"KG 0.13 2.00 0.26 2 20.00
MADERA TORNILLO P2 4.83 2.70 13.04 43 20.00
EQUIPO/HERRAM
HERRAMIENTA % 3.00 8.14 0.24 37 20.00
22.20

COLUMNA CONCRETO F'C 175 KG/CM2 UNIDAD: M3


DESCRIPCION UND A.U. P.U. PARCIAL IU
MANO DE OBRA
OPERARIO hh 1.33 8.57 11.40 47 10.00
OFICIAL hh 0.67 7.70 5.16 47 10.00
PEON hh 8.00 6.87 54.96 47 10.00
MATERIALES
CEMENTO PORT. TIPBLS 7.75 13.00 100.75 21 10.00
PIEDRA CHANCADA MD3 0.85 30.00 25.50 5 10.00
ARENA M3 0.50 15.00 7.50 4 10.00
EQUIPO/HERRAM
HERRAMIENTA % 3.00 71.52 2.15 37 10.00
207.41

COLUMNAS ENCOFRADO Y DESENCOFRADO UNIDAD: M2


DESCRIPCION UND A.U. P.U. PARCIAL IU
MANO DE OBRA
OPERARIO hh 0.88 8.57 7.54 47 3.00
OFICIAL hh 0.88 7.70 6.78 47 3.00
MATERIALES
ALAMBRE NEGRO 8 KG 0.30 2.00 0.60 2 3.00
CLAVOS MADERA 3"KG 0.30 2.00 0.60 2 3.00
MADERA TORNILLO P2 3.69 2.70 9.96 43 3.00
EQUIPO/HERRAM
HERRAMIENTA % 3.00 14.32 0.43 37 3.00
25.91

COLUMNAS ACERO 4200 KG/CM2 UNIDAD: KG


DESCRIPCION UND A.U. P.U. PARCIAL IU
MANO DE OBRA
OPERARIO hh 0.04 8.57 0.34 47 100.00
OFICIAL hh 0.04 7.70 0.31 47 100.00
PEON hh 0.03 6.87 0.21 47 100.00
MATERIALES
ALAMBRE NEGRO 8 KG 0.02 2.00 0.04 2 100.00
FIERRO CORRUGAD KG 1.05 1.50 1.58 3 100.00
EQUIPO/HERRAM
CIZALLA hm 0.04 2.00 0.08 37 100.00
2.56

MUROS DE LADRILLO KK 18 HUECOS UNIDAD: M2


DESCRIPCION UND A.U. P.U. PARCIAL IU
MANO DE OBRA
OPERARIO hh 0.85 8.57 7.28 47 200.00
PEON hh 0.72 6.87 4.95 47 200.00
MATERIALES
LADRILLO KK 18 HU UND 39.00 0.30 11.70 17 200.00
ARENA M3 0.03 16.00 0.50 4 200.00
MADERA TORNILLO P2 0.46 2.70 1.24 43 200.00
CEMENTO BLS 0.10 13.00 1.30 21 200.00
EQUIPO/HERRAM
HERRAMIENTA % 3.00 12.23 0.37 37 200.00
27.34
MONTO X IU
AXB

1,573.23

47.19

299.95
492.80
1,758.72

3,900.00
1,250.00
1,365.00

76.54

548.48
492.80
1,758.72

2,372.50
615.00
727.50

84.00

85.70
77.00
10.40
5.20
260.82

4.88

113.98
51.59
549.60

1,007.50
255.00
75.00

21.46

22.62
20.33

1.80
1.80
29.89

1.29

34.28
30.80
20.61

4.00
157.50

8.00
1,456.90
989.28

2,340.00
100.00
248.40
260.00

73.39
PARTICIPACION DE CADA MATERIAL RESPECTO AL MONTO TOTAL (IU / TOTAL)

IU DESCRIPCION PORCENTAJE

47 MANO DE OBRA 10,377.39 0.351 JJ


37 HERRAMIENTAS 316.74 0.011
21 CEMENTO 7,540.00 0.255 C
5 PIEDRA CHANCADA 2,120.00 0.072
4 ARENA GRUESA 175.00 0.006
38 HORMIGON 2,092.50 0.071 H
17 LADRILLO 2,340.00 0.079 L
43 MADERA TORNILLO 539.11 0.018
2 ALAMBRE/CLAVOS 23.20 0.001
3 FIERRO CORRUGADO 157.50 0.005

COSTO DIRECTO 25,681.45

G.GENERALES Y UTILIDA 3,852.27 0.130 GGUU

SUB TOTAL 29,533.72 1.000


0.351
P
0.255
P
M
0.071
0.079
M 0.030 0.083 0.113
P
M
0.113 0.262 0.738

0.130

1.000
FORMULA POLINOMICA

k= 0.351 Jr + 0.079 Lr + 0.255 Cr + 0.113 ( 0.738


Jo Lo Co 0.738
Pr + 0.262 Mr ) + 0.071 Hr + 0.130 GGUr
Po + 0.262 Mo Ho GGUo