Is defined as a decision making technique for inspection planning based or risk comprising the
probability and failure and consequence.
Evaluation of risks
The purpose of evaluating risks is to identify the extent of the risk and decide whether exist precautions
are adequate or whether more need.
Likelihood
When predicting the likelihood of an accident happening we should take into account the control
measures that are already in place.
Use a risk matrix to calculate an overall risk rating for your specific hazard.
Foc( maximum value 10) = Fh (maximum value 4) + Fe(maximum value 3) + Fo (maximum value 3)
*Fluid type : condensate hydrocarbon ( Ffh = 3.0) (table appendix 2 consequence analysis)
*Close proximity location ( manned plant area): (Flh=2.5) (table appendix 2 consequence analysis)
Redundancy (Fro=0.5)
Fo= (4*0.5*3.0)/6 = 1
ENVIRONMENTAL FACTOR
Fe= (4*3*2.5)/12.5=2.4
Foc= 5.43