Name of technician:
Duration of job :
ALTERNATOR UNIT:
Clean all the installations externally
Check the following are clean and free of obstruction:
Air intake and filters
Ventilation ducts
Generator air inlet louvers and associated duct.
Air outlet passage.
Inspect output(power)terminations for good condition.
Clean and inspect condition of all terminal bushings.
Measure megger value.
Measure and record DC winding resistance of:
a)Stator
b)Rotor
Measure and record P1 value of stator winding.
Clean and check security of earth connections
Check condition of main field slip rings,brushes,
and spring tension.(if applicable)
Check condition of rotor shaft earth slip ring , brushes
and spring tension.(as applicable).
Name of technician:
Duration of job :
AVR PANEL:
Inspect and clean panel interior
Ensure security of all terminations.
Check condition of all thyristors, heatsinks and control cards.
Check, function of all operating switches
Replace defective panel lamps.
Measure and confirm resistance of discharge resistor.
Check all indicating meters for proper display.
FINAL CHECKS:
Function test all alarms
Function check trip circuits.
OBSERVATIONS
Check List No
BCEL-002
OBSERVATIONS
Signature: ______________
Supervisor / Engineer