Developed Excel based model to check the financial viablity of toll road Recent Posts
infrastructure development project(expressway,sea linkbridge, underground
tunnel) and financial return for stake holders.It takes basic input like length of Deciphering Guaranteed Highest
Toll Road,development cost per km, operation cost per km, vehicle NAVProducts
Toll Road Infrastructure Project
growth,leveragefor project.and would then project the financial statements
FinancialModel
for concession period and construction period, cash flow to equity holders, IRR,
NPV, Sensitivity Analysis on parameters like development cost, interest rate, Archives
vehicle growth, toll price..etc.
February 2012
Toll_Road_Financial_Model_v1.0 January 2012
Let me know in case of any issue or clarification,I would be happy to help. January 2012
M T W T F S S
Share this: 1
Twitter Facebook 2 3 4 5 6 7 8
9 10 11 12 13 14 15
Like 16 17 18 19 20 21 22
Bethefirsttolikethis.
23 24 25 26 27 28 29
Deciphering Guaranteed Highest NAVProducts
30 31
Feb
No comments yet
LeaveaReply
Enteryourcommenthere...
Blog at WordPress.com.net.
Follow
https://finalytics.wordpress.com/2012/01/16/tollroadinfrastructureprojectfinancialmodel/ 1/1