Mulliens to be filled
since chasing work
6 19th Flr Appt-3 Bull mark Required
may damage the
wall.
Seperation Wall
Between Childrens
Wall bull mark is
8 Bedrrom & Master 19th Floor Appt-1
required.
Bedroom needs to
be constructed.
Stattus Results
Flr Appt
16th
Floor
Appt-1 VPD is not completed, Kitchen GLD choke up is pending,Main Ckt Rope Pulling is Pending
Main Ckt Rope Pulling is Pending, K/n Aq guard pt is pending,Kitchen GLD choke up is pending,
Appt-2 Master Toilet W/m pt to be installed with RCC Chipping , Conduiting & box fixing in NSW
Appt-3 Main Ckt Rope Pulling is Pending, Kitchen Reworks as per CVI
Appt-4 Main Ckt Rope Pulling is Pending, Kitchen Reworks as per CVI,Mater Toilet BL is pending.
17th
Floor
Appt-1 Main Ckt Rope Pulling is Pending,VPD is not completed, Kitchen E/h fan Pt is pending as per CVI
Main Ckt Rope Pulling is Pending,VPD is not completed, Choke for GLD in Kitchen is pending, Deck
area Living Drop Opening is pending, W/m pt is pending in Service Deck,MB Bed Site Control point
Appt-2 Back Box needs to be refixed as alignment is improper.
Main Ckt Rope Pulling is Pending, Kitchen Rework is pending, Kitchen Conduiting work is
Appt-3 incomplete, MB- BL is pending.
18th
Floor Main Ckt Rope Pulling is Pending, Kitchen Rework is pending,GLD Choke up is pending, Camera
Appt-1 Point is pending.