1. A 10mm thick steel plate to be installed to the
side wall of existing box culvert by 8 no. of M16 or M12 stud anchor bolts as the function of the temporary plug for the opening of pipe connection. 2. During the bolting process, one 3mm thick neoprene gasket to be inserted between the steel plate and side wall surface in order to prevent leakage occurred.
3. After the installation of the temporary plug, the
200mm thick block wall (for safety purpose) and quadshore supports to be demolished inside the existing box culvert.
4. Finally, after the new drainage system can be
functioned, remove the temporary plug and repair the bolt holes on the side wall surface of existing box culvert by the plastic mixing condition of Scoretech ST-NSG non-shrink grout.