AC - Base = 7,5 cm U-Ditch Tipe DS-3
31 STA2+
3,00 % 3,00 % 5,00 % Selected Embankment
5,00 %
Asphalt Existing Selected Embankment 30
AC-Base Levelling = 4 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm
Bidang persamaan
Reference level
25,00
30,522
30,399
30,400
30,259
30,013
29,775
30,039
30,103
30,194
30,202
30,193
ELEVASI DESIGN
DESIGN LEVEL
30,305
30,224
30,121
30,165
30,013
29,775
29,837
29,906
29,889
30,026
30,018
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0,20
3,35 3,50 3,00 3,00 3,00 2,00 1,50
DISTANCE (m)
AC - Wearing Course = 4 cm
STA2+
AC - Binder Course = 6 cm
275 AC - Base = 7,5 cm U-Ditch Tipe DS-3 30
Selected Embankment
5,00 %
3,00 %
3,00 % 5,00 %
Bidang persamaan
Reference level
25,00
29,500
29,864
29,925
30,018
30,018
ELEVASI DESIGN
30,740
30,617
30,617
30,477
30,243
DESIGN LEVEL
29,500
29,803
29,840
29,774
29,835
ELEVASI TANAH ASLI
30,511
30,442
30,340
30,272
30,243
JARAK (m)
0,25
3,00 2,00 1,50
3,25 3,51 3,00 3,00 DISTANCE (m)
AKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRA
DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS
KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN
CROSS SECTON IMPROVEMENT PROJECT (WINRIP)
BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN
YODYA KARYA
STA 2+300 ~ 2+325 (CORRIDOR SUMATERA)
NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. N
GENERAL CONTRACTOR PT. YODYA KARYA (Persero) MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT
14,00
7,00
0,40 1,10 2,00
NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:
KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON
PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN :
(CORRIDOR SUMATERA) YODYA KARYA
STA 2+000 ~ 2+025 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+250 ~ 2+275 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+500 ~ 02+525 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+750 ~ 2+775
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN :
PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
14,00
14,00
14,00 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40
2,00 7,00 2,00 1,10 0,40 14,00
0,40 1,10 AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm AC - Wearing Course = 4 cm 1,10 0,40
STA2+250 AC - Binder Course = 6 cm
0,40 1,10 2,00 7,00 2,00
AC - Wearing Course = 4 cm
31
U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3 STA2+500
STA2+000
AC - Binder Course = 6 cm
3,00 %
3,00 %
31 AC - Base = 7,5 cm U-Ditch Tipe DS-3
AC - Wearing Course = 4 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3
5,00 % 5,00 % Selected Embankment
29
Selected Embankment 5,00 % 3,00 %
3,00 % 5,00 % 30 Asphalt Existing Selected Embankment 30
5,00 % 3,00 % 3,00 % 5,00 %
29 U-Ditch Tipe DS-3 STA2+750
AC - Binder Course = 6 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3
AC-Base Levelling = 4 cm CTB = 17.5 cm
Asphalt Existing Selected Embankment
5,00 % 3,00 %
3,00 % 5,00 %
Asphalt Existing Selected Embankment Agg Kelas A = 15 cm AC-Base Levelling = 5 cm CTB = 17.5 cm
Selected Embankment = 45 cm Agg Kelas A = 15 cm Asphalt Existing
AC-Base Levelling = 9 cm CTB = 17.5 cm
Selected Embankment = 45 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm AC-Base Levelling = 6 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm
28,021
28,274
28,312
28,312
28,416
28,416
28,423
28,537
28,420
28,420
28,320
28,303
28,285
28,211
ELEVASI DESIGN
28,083
27,919
28,048
28,064
28,182
28,066
27,919
28,196
30,175
30,259
30,294
30,400
30,400
30,405
30,522
30,399
30,400
30,259
30,013
ELEVASI DESIGN
29,775
30,039
30,103
30,194
30,202
30,193
30,302
30,191
30,191
30,060
29,901
ELEVASI DESIGN ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL DESIGN LEVEL
28,021
28,099
28,440
28,465
28,229
28,241
28,243
28,276
28,229
28,213
28,137
27,749
28,288
28,211
ELEVASI TANAH ASLI
28,083
27,902
27,830
27,850
27,952
27,891
28,123
28,196
ELEVASI TANAH ASLI
30,175
30,316
30,301
30,159
30,216
30,230
30,305
30,224
30,121
30,165
30,013
ELEVASI TANAH ASLI
29,775
29,837
29,906
29,889
30,026
30,018
30,067
29,967
29,906
29,926
29,901
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m)
0,19
0,25
0,25
JARAK (m)
0,27
2,00 2,00 1,50 3,27 3,34 1,50 2,00 JARAK (m)
0,15
JARAK (m) 3,00 3,00 3,40 3,33 3,00 3,00
0,20
DISTANCE (m) 2,00 2,00 1,50 3,35 3,50 3,00 3,00 3,00 2,00 1,50 2,90 3,20 2,00 3,00 DISTANCE (m)
DISTANCE (m) DISTANCE (m)
14,00
14,00
14,00 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40
2,00 7,00 2,00 1,10 0,40 14,00
0,40 1,10 AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
STA2+525 AC - Base = 7,5 cm U-Ditch Tipe DS-3
0,40 1,10
STA2+025 AC - Base = 7,5 cm AC - Binder Course = 6 cm
Selected Embankment
U-Ditch Tipe DS-3
U-Ditch Tipe DS-3 STA2+275 AC - Base = 7,5 cm U-Ditch Tipe DS-3 30
Selected Embankment
5,00 % 3,00 % 3,00 % 5,00 % AC - Wearing Course = 4 cm
30 3,00 % AC - Binder Course = 6 cm
5,00 % 3,00 % 5,00 % 31
5,00 % 3,00 %
3,00 % 5,00 % Asphalt Existing Selected Embankment U-Ditch Tipe DS-3 STA2+775 AC - Base = 7,5 cm U-Ditch Tipe DS-3
Asphalt Existing Selected Embankment AC-Base Levelling = 5 cm CTB = 17.5 cm Selected Embankment
5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing Selected Embankment 28
AC-Base Levelling = 8 cm CTB = 17.5 cm 30 Agg Kelas A = 15 cm
CTB = 17.5 cm Selected Embankment = 45 cm Asphalt Existing
Agg Kelas A = 15 cm AC-Base Levelling = 5 cm
Selected Embankment = 45 cm Agg Kelas A = 15 cm
Selected Embankment = 45 cm AC-Base Levelling = 9 cm CTB = 17.5 cm
Selected Embankment
Agg Kelas A = 15 cm
Selected Embankment = 45 cm
29,500
29,864
29,925
30,018
30,018
30,027
30,127
30,027
29,909
29,799
29,424
29,424
29,387
29,503
29,677
29,627
29,663
29,677
29,577
29,680
29,453
29,413
29,272
ELEVASI DESIGN
27,743
27,794
27,926
27,926
27,939
28,057
27,930
27,930
27,724
26,950
27,555
27,663
ELEVASI DESIGN
30,599
30,477
30,513
30,618
30,618
30,625
30,740
30,617
30,617
30,477
30,243
ELEVASI DESIGN
DESIGN LEVEL ELEVASI DESIGN DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL
29,500
29,803
29,840
29,774
29,835
29,841
29,901
29,852
29,816
29,799
29,424
29,424
29,387
29,272
29,413
29,394
29,448
29,452
29,488
29,424
29,380
29,443
29,413
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
27,743
27,708
27,692
27,700
27,714
27,796
27,755
27,693
27,645
26,950
27,555
27,663
ELEVASI TANAH ASLI
30,599
30,519
30,504
30,272
30,403
30,414
30,511
30,442
30,340
30,272
30,243
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,25
0,12
JARAK (m)
0,23
3,00 1,50 3,25 3,43 2,00 3,00 JARAK (m) 3,00 2,00 1,50 2,88 2,87 2,00 3,00 2,00 3,00 3,00 3,00 3,40 3,57 3,50 1,00 1,00 2,00
0,24
DISTANCE (m) 2,00 2,00 1,50 3,25 3,51 3,00 3,00 DISTANCE (m) DISTANCE (m)
DISTANCE (m)
NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:
KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP)
PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN :
(CORRIDOR SUMATERA) YODYA KARYA
STA 2+050 ~ 2+075 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+300 ~ 2+325 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+550 ~ 2+575 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+800 ~ 2+825
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN :
PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
14,00
14,00 14,00
14,00
0,40 1,10 7,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm
AC - Wearing Course = 4 cm AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
STA2+050 AC - Binder Course = 6 cm U-Ditch Tipe DS-3 STA2+300 AC - Base = 7,5 cm U-Ditch Tipe DS-3 STA2+550 AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3 U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
U-Ditch Tipe DS-3 STA2+800 AC - Base = 7,5 cm
30 31 5,00 % 3,00 % 3,00 % 5,00 %
30 3,00 %
U-Ditch Tipe DS-3
Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 % 5,00 % 3,00 % 5,00 %
28 5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing
Asphalt Existing Selected Embankment 30 Asphalt Existing Selected Embankment
AC-Base Levelling = 6 cm CTB = 17.5 cm Asphalt Existing
AC-Base Levelling = 7 cm CTB = 17.5 cm Agg Kelas A = 15 cm AC-Base Levelling = 3 cm CTB = 17.5 cm
Agg Kelas A = 15 cm Selected Embankment = 45 cm Agg Kelas A = 15 cm Agg Kelas S = 17,5 cm Selected Embankment
Selected Embankment = 45 cm Selected Embankment = 45 cm
AC-Base Levelling = 11 cm
25
Bidang persamaan
Bidang persamaan Bidang persamaan
Reference level Bidang persamaan
Reference level Reference level
26,00 Reference level
25,00 25,00
23,00
30,177
30,587
30,635
30,734
30,734
30,740
30,850
30,715
30,715
30,609
30,588
ELEVASI DESIGN
28,874
29,322
29,571
29,673
29,673
29,678
29,792
29,673
29,673
29,535
28,535
28,543
28,673
29,312
29,627
29,684
29,779
29,779
29,788
29,890
29,792
29,676
29,535
29,173
29,594
29,516
ELEVASI DESIGN ELEVASI DESIGN
27,955
27,748
27,798
27,798
27,809
27,928
27,798
27,798
27,664
26,064
27,674
27,735
DESIGN LEVEL ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL
30,177
30,431
30,508
30,400
30,496
30,505
30,621
30,540
30,521
30,609
30,588
ELEVASI TANAH ASLI
28,874
29,653
29,700
29,474
29,489
29,503
29,547
29,495
29,445
29,234
28,720
28,735
28,673
29,312
29,657
29,689
29,547
29,597
29,613
29,688
29,617
29,534
29,535
29,173
29,594
29,516
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
27,955
27,706
27,582
27,575
27,583
27,644
27,623
27,549
27,582
26,909
27,674
27,735
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m)
0,17
JARAK (m) 2,00 2,00 1,50 3,15 3,68 3,00 3,00 JARAK (m)
0,15
0,25
0,25
0,29
0,40
0,40
3,00 2,00 1,50 3,25 3,40 2,00 2,00 DISTANCE (m) 3,00 2,00 1,50 2,90 2,81 2,00 3,00 2,00 JARAK (m)
0,20
DISTANCE (m) DISTANCE (m) 3,00 3,00 3,40 3,60 3,00 1,00 1,00 3,00
DISTANCE (m)
14,00 14,00
14,00 14,00
7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
STA2+075
AC - Binder Course = 6 cm
U-Ditch Tipe DS-3 STA2+325 AC - Base = 7,5 cm AC - Binder Course = 6 cm
AC - Wearing Course = 4 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3 U-Ditch Tipe DS-3
STA2+575 STA2+825
AC - Binder Course = 6 cm
30
Selected Embankment
31 3,00 % 3,00 %
30
U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3 U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
5,00 % 3,00 % 3,00 % 5,00 % 5,00 % 5,00 %
5,00 % 3,00 %
3,00 % 5,00 % 28 Selected Embankment 3,00 % 3,00 %
5,00 % 5,00 %
Asphalt Existing Selected Embankment
Asphalt Existing 30 Asphalt Existing
AC-Base Levelling = 6 cm CTB = 17.5 cm Selected Embankment Asphalt Existing
AC-Base Levelling = 9 cm CTB = 17.5 cm
Agg Kelas A = 15 cm Agg Kelas A = 15 cm AC-Base Levelling = 3 cm CTB = 17.5 cm CTB = 17.5 cm
Selected Embankment = 45 cm AC-Base Levelling = 10 cm Selected Embankment
Selected Embankment = 45 cm Agg Kelas A = 15 cm Agg Kelas A = 15 cm
Selected Embankment = 45 cm Selected Embankment = 45 cm
25
Bidang persamaan
Bidang persamaan Bidang persamaan
Reference level Bidang persamaan
Reference level Reference level
26,00 Reference level
25,00 25,00
23,00
30,399
30,468
30,507
30,610
30,610
30,617
30,731
30,605
30,605
30,468
30,437
ELEVASI DESIGN
29,238
29,572
29,572
29,613
29,716
29,716
29,720
29,835
29,717
29,717
29,567
29,587
29,399
29,432
29,523
29,523
29,532
29,631
29,525
29,525
29,367
29,184
ELEVASI DESIGN ELEVASI DESIGN
27,053
27,481
27,507
27,636
27,636
27,652
27,771
27,646
27,646
27,477
26,856
27,455
27,461
DESIGN LEVEL ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL
30,399
30,428
30,406
30,310
30,383
30,408
30,499
30,430
30,378
30,425
30,437
ELEVASI TANAH ASLI
29,238
29,299
29,638
29,671
29,516
29,539
29,545
29,567
29,521
29,521
29,606
29,587
29,399
29,426
29,284
29,332
29,342
29,425
29,350
29,279
29,217
29,184
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
27,053
27,481
27,444
27,364
27,391
27,403
27,493
27,471
27,398
27,414
26,856
27,455
27,461
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m)
0,20
JARAK (m) 2,00 2,00 1,50 3,25 3,55 3,00 3,00 JARAK (m)
0,12
0,25
2,00 2,00 1,50 3,30 3,38 2,50 3,00 DISTANCE (m) 3,00 1,50 2,83 3,02 3,00 3,00 JARAK (m)
0,27
0,75
0,75
DISTANCE (m) DISTANCE (m) 3,00 3,00 3,00 3,40 3,53 3,50 3,00
DISTANCE (m)
NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:
KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON
PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN :
(CORRIDOR SUMATERA) YODYA KARYA
STA 2+100 ~ 2+125 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+350 ~ 2+375 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+600 ~ 2+625 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+850 ~ 2+875
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN :
PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
14,00 14,00
14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40 14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm 0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
STA2+100 AC - Base = 7,5 cm U-Ditch Tipe DS-3 STA2+350
AC - Binder Course = 6 cm
AC - Wearing Course = 4 cm AC - Binder Course = 6 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3
AC - Binder Course = 6 cm U-Ditch Tipe DS-3 STA2+850 AC - Base = 7,5 cm U-Ditch Tipe DS-3
30 Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 % 31 3,00 % 3,00 % 30 STA2+600 28
5,00 % 5,00 % U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing Asphalt Existing 5,00 % 3,00 % 3,00 % 5,00 %
30 Selected Embankment
Asphalt Existing Selected Embankment
AC-Base Levelling = 8 cm CTB = 17.5 cm AC-Base Levelling = 9 cm CTB = 17.5 cm
Agg Kelas A = 15 cm Asphalt Existing Selected Embankment AC-Base Levelling = 10 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm Selected Embankment = 45 cm CTB = 17.5 cm Agg Kelas A = 15 cm
AC-Base Levelling = 6 cm
Agg Kelas A = 15 cm Selected Embankment = 45 cm
Selected Embankment = 45 cm
25
Bidang persamaan Bidang persamaan Bidang persamaan
Bidang persamaan
Reference level Reference level Reference level
Reference level
25,00 26,00 23,00
25,00
29,005
29,583
29,583
29,627
29,728
29,728
29,733
29,846
29,730
29,730
29,593
29,734
30,022
30,422
30,459
30,564
30,564
30,568
30,685
30,561
30,561
30,422
30,187
27,402
27,348
27,482
27,482
27,493
27,612
27,482
27,482
27,313
26,527
27,362
27,384
ELEVASI DESIGN ELEVASI DESIGN ELEVASI DESIGN
29,195
29,063
29,218
29,218
29,227
29,327
29,218
29,218
29,092
29,063
29,063
28,875
ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL
30,022
30,503
30,508
30,331
30,384
30,393
30,422
30,366
30,184
30,201
30,187
29,005
29,105
29,610
29,627
29,506
29,545
29,553
29,591
29,555
29,530
29,733
29,734
27,402
27,365
27,248
27,254
27,261
27,335
27,307
27,247
27,313
26,527
27,362
27,384
ELEVASI TANAH ASLI
29,195
29,125
28,988
29,037
29,052
29,088
29,033
28,945
28,916
28,267
28,902
28,875
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,12
JARAK (m)
0,13
0,20
3,00 2,00 1,50 3,25 3,32 3,00 3,00 2,00 2,00 1,50 3,35 3,53 3,00 3,00 JARAK (m)
0,25
0,50
0,50
DISTANCE (m) 3,00 3,00 3,40 3,60 4,00 1,00 1,00 2,00
DISTANCE (m) 3,00 3,00 2,85 3,10 2,00 3,00 DISTANCE (m)
DISTANCE (m)
14,00
14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40 14,00
14,00
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm 0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm STA2+375 AC - Base = 7,5 cm U-Ditch Tipe DS-3
STA2+125 AC - Base = 7,5 cm U-Ditch Tipe DS-3 Selected Embankment AC - Wearing Course = 4 cm AC - Wearing Course = 4 cm
Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 %
31 AC - Binder Course = 6 cm AC - Binder Course = 6 cm
30 5,00 % 3,00 % 3,00 % 5,00 % 30 U-Ditch Tipe DS-3
STA2+625 AC - Base = 7,5 cm U-Ditch Tipe DS-3 STA2+875 AC - Base = 7,5 cm U-Ditch Tipe DS-3
Asphalt Existing U-Ditch Tipe DS-3 28
Asphalt Existing
Selected Embankment
5,00 % 3,00 % 3,00 % 5,00 %
30 AC-Base Levelling = 13 cm CTB = 17.5 cm 5,00 % 3,00 % 3,00 % 5,00 % Selected Embankment
AC-Base Levelling = 5 cm CTB = 17.5 cm Agg Kelas A = 15 cm
Selected Embankment = 45 cm Asphalt Existing Asphalt Existing Selected Embankment
Agg Kelas A = 15 cm Selected Embankment
Selected Embankment = 45 cm AC-Base Levelling = 8 cm CTB = 17.5 cm
AC-Base Levelling = 7 cm CTB = 17.5 cm
Agg Kelas A = 15 cm Agg Kelas A = 15 cm
Selected Embankment = 45 cm Selected Embankment = 45 cm
25
Bidang persamaan Bidang persamaan
Bidang persamaan
Reference level Bidang persamaan
Reference level Reference level
26,00 25,00 Reference level
25,00
23,00
30,121
30,850
30,885
30,991
30,991
30,998
31,113
30,991
30,850
30,686
ELEVASI DESIGN
29,290
29,628
29,628
29,666
29,770
29,770
29,734
29,891
29,766
29,766
29,628
29,659
29,037
28,845
29,008
29,008
29,012
29,108
28,996
28,996
28,845
28,649
ELEVASI DESIGN ELEVASI DESIGN
26,128
26,128
26,413
27,207
27,323
27,323
27,344
27,470
27,353
27,083
27,007
26,508
27,104
27,087
DESIGN LEVEL ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL
30,121
30,789
30,842
30,642
30,708
30,721
30,807
30,816
30,699
30,686
ELEVASI TANAH ASLI
29,037
29,014
28,793
28,821
28,837
28,864
28,782
28,707
28,671
28,649
29,290
29,430
29,649
29,688
29,524
29,588
29,599
29,660
29,582
29,553
29,651
29,659
26,128
26,128
26,413
27,043
27,058
27,106
27,118
27,216
27,178
27,083
27,007
26,508
27,104
27,087
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m)
0,20
JARAK (m) 2,00 2,00 1,50 3,30 3,50 3,00 3,00 JARAK (m)
0,13
0,11
2,00 2,00 1,50 3,35 3,54 3,00 3,00 DISTANCE (m) 3,00 3,00 2,75 3,22 3,00 3,00 JARAK (m)
0,30
0,75
0,75
DISTANCE (m) DISTANCE (m) 3,00 2,00 2,00 3,55 3,35 4,00 3,00
DISTANCE (m)
NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:
KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP)
PERUMAHAN RAKYAT CROSS SECTON BULAN : PERUMAHAN RAKYAT CROSS SECTON BULAN : PERUMAHAN RAKYAT CROSS SECTON BULAN : PERUMAHAN RAKYAT CROSS SECTON BULAN :
(CORRIDOR SUMATERA) LOKASI : PADANG PARIAMAN YODYA KARYA (CORRIDOR SUMATERA) LOKASI : PADANG PARIAMAN (CORRIDOR SUMATERA) LOKASI : PADANG PARIAMAN (CORRIDOR SUMATERA) LOKASI : PADANG PARIAMAN
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) STA 2+150 ~ 2+175 TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero)
YODYA KARYA
STA 2+400 ~ 2+425 TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero)
YODYA KARYA
STA 2+650 ~ 2+675 TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero)
YODYA KARYA
STA 2+900 ~ 2+925 TAHUN :
PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
14,00
25
Bidang persamaan
Bidang persamaan Reference level Bidang persamaan
Reference level 26,00 Bidang persamaan Reference level
25,00 Reference level 23,00
30,719
30,958
31,102
31,102
31,111
31,221
31,094
30,958
30,972
ELEVASI DESIGN 24,00
26,048
26,315
27,080
27,221
27,221
27,226
27,343
27,219
27,219
27,080
26,560
26,886
26,813
29,746
29,729
29,778
29,877
29,877
29,885
29,993
29,871
29,871
29,730
29,623
26,048
ELEVASI DESIGN DESIGN LEVEL ELEVASI DESIGN
28,650
28,693
28,812
28,812
28,818
28,913
28,800
28,800
28,650
28,962
DESIGN LEVEL ELEVASI DESIGN DESIGN LEVEL
30,719
30,770
30,808
30,841
30,858
30,917
30,919
30,928
30,972
ELEVASI TANAH ASLI DESIGN LEVEL
29,746
29,817
29,822
29,673
29,686
29,709
29,736
29,684
29,615
29,618
29,623
26,048
26,048
26,315
26,959
26,988
26,991
27,000
27,068
27,044
26,986
27,003
26,178
26,886
26,813
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
28,904
28,907
28,644
28,637
28,639
28,695
28,592
28,582
28,861
28,962
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL
JARAK (m)
0,28
0,13
3,00 2,00 1,50 3,10 3,48 3,00 3,00 3,00 2,00 3,00 3,35 3,52 3,00 1,00 1,00 3,00
JARAK (m)
0,18
DISTANCE (m) 2,00 2,00 2,70 3,22 3,00 3,00 DISTANCE (m)
DISTANCE (m)
14,00 14,00
14,00
2,00 7,00 2,00 1,10 0,40 0,40 1,10 7,00
0,40 1,10 14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40 AC - Wearing Course = 4 cm
AC - Wearing Course = 4 cm
AC - Wearing Course = 4 cm AC - Binder Course = 6 cm
AC - Binder Course = 6 cm STA2+425
AC - Binder Course = 6 cm
28 U-Ditch Tipe DS-3 STA2+925 AC - Base = 7,5 cm U-Ditch Tipe DS-3
STA2+175 AC - Base = 7,5 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3
30
AC - Wearing Course = 4 cm
U-Ditch Tipe DS-3
STA2+675 AC - Binder Course = 6 cm
5,00 % 3,00 % 3,00 % 5,00 %
5,00 % 3,00 % 3,00 % 5,00 %
31 5,00 % 3,00 % 3,00 % 5,00 % U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
Selected Embankment
30 Asphalt Existing
Asphalt Existing 5,00 % 3,00 % 3,00 % 5,00 % Selected Embankment
Asphalt Existing Selected Embankment
30 AC-Base Levelling = 8 cm CTB = 17.5 cm AC-Base Levelling = 10 cm CTB = 17.5 cm
AC-Base Levelling = 5 cm CTB = 17.5 cm Asphalt Existing Agg Kelas A = 15 cm
Agg Kelas A = 15 cm Selected Embankment Selected Embankment = 45 cm
Agg Kelas A = 15 cm Selected Embankment = 45 cm AC-Base Levelling = 4 cm CTB = 17.5 cm
Selected Embankment = 45 cm
Agg Kelas A = 15 cm 25
Selected Embankment = 45 cm
Bidang persamaan
Bidang persamaan Bidang persamaan
Reference level Bidang persamaan
Reference level Reference level
26,00 Reference level
25,00 22,00
30,050
30,639
30,685
30,786
30,793
30,811
30,799
30,903
30,782
30,782
30,639
30,360
25,788
25,788
26,498
27,033
27,174
27,175
27,179
27,296
27,172
27,172
27,033
26,748
26,637
ELEVASI DESIGN
29,796
29,790
29,834
29,935
29,935
29,941
30,053
29,930
29,930
29,796
29,845
28,808
29,042
28,738
28,740
28,746
28,856
28,721
28,721
28,593
28,593
28,593
28,267
ELEVASI DESIGN DESIGN LEVEL
DESIGN LEVEL
DESIGN LEVEL
30,050
30,673
30,688
30,480
30,509
30,568
30,573
30,650
30,607
30,492
30,378
30,360
25,788
25,788
26,498
26,637
26,967
26,987
26,994
27,016
26,997
26,843
26,853
26,748
26,637
ELEVASI TANAH ASLI
29,796
29,940
29,929
29,732
29,760
29,744
29,831
29,740
29,711
29,822
29,845
29,077
28,862
28,560
28,562
28,571
28,570
28,509
28,471
28,368
27,950
28,323
28,267
ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m) ORIGINAL GROUND LEVEL
0,20
0,20
0,13
JARAK (m) DISTANCE (m)
0,18
3,00 2,00 1,50 3,20 3,52 3,00 4,00 3,00 3,00 3,00 3,35 3,52 3,00 3,00 3,00
JARAK (m) DISTANCE (m)
0,18
0,40
0,40
DISTANCE (m) 3,00 3,00 3,15 3,68 2,00 3,00
DISTANCE (m)
NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:
KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP)
PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN :
(CORRIDOR SUMATERA) YODYA KARYA
STA 2+200 ~ 2+225 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+450 ~ 2+475 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+700 ~ 2+725 (CORRIDOR SUMATERA) YODYA KARYA
STA 0+000 ~ 0+025
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN :
GENERAL CONTRACTOR PT. YODYA KARYA (Persero) GENERAL CONTRACTOR PT. YODYA KARYA (Persero) GENERAL CONTRACTOR PT. YODYA KARYA (Persero) GENERAL CONTRACTOR PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
14,00
14,00
14,00 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40 AC - Wearing Course = 4 cm 14,00
AC - Binder Course = 6 cm
AC - Wearing Course = 4 cm STA2+450 AC - Base = 7,5 cm U-Ditch Tipe DS-3
0,40 1,10 2,00 7,00 2,00 1,10 0,40 AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm
AC - Binder Course = 6 cm 31 STA2+950
31 STA2+200 AC - Base = 7,5 cm
Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 % AC - Wearing Course = 4 cm
U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
U-Ditch Tipe DS-3
Selected Embankment 3,00 %
5,00 % 3,00 % 3,00 % 5,00 % 30 Asphalt Existing STA2+700
AC - Binder Course = 6 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3 27
5,00 % 3,00 % 5,00 %
30 Selected Embankment 29
Asphalt Existing Selected Embankment
AC-Base Levelling = 9 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment
Selected Embankment
5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing Selected Embankment
AC-Base Levelling = 4 cm CTB = 17.5 cm
AC-Base Levelling = 7 cm CTB = 17.5 cm Selected Embankment = 45 cm
Asphalt Existing Agg Kelas A = 15 cm
Agg Kelas A = 15 cm Selected Embankment = 45 cm
Selected Embankment = 45 cm AC-Base Levelling = 8 cm CTB = 17.5 cm
Agg Kelas A = 15 cm 25
Selected Embankment = 45 cm
30,334
30,397
30,489
30,489
30,496
30,597
30,478
30,478
30,341
29,894
25,741
25,741
26,209
26,923
27,071
27,071
27,076
27,186
27,071
27,071
26,923
26,814
26,797
ELEVASI DESIGN ELEVASI DESIGN
28,177
28,238
28,415
28,415
28,426
28,547
28,460
28,460
28,327
28,669
30,278
30,108
29,914
29,958
30,059
30,059
30,064
30,177
30,058
30,058
29,914
29,740
30,080
30,175
30,176
30,270
30,280
30,336
30,303
30,255
29,859
29,894
25,741
25,741
26,209
26,830
26,890
26,891
26,895
26,967
26,896
26,795
26,779
26,814
26,797
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
30,278
30,108
30,091
29,879
29,877
29,884
29,885
29,935
29,826
29,781
29,801
29,740
28,177
28,263
28,221
28,240
28,251
28,309
28,209
28,188
28,332
28,669
ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,20
0,15
JARAK (m) 3,00 2,00 1,50 2,90 3,40 2,00 3,00 JARAK (m) 3,00 3,00 3,00 3,15 3,30 3,00 3,00 3,00
0,13
0,18
2,00 3,00 2,00 1,50 3,25 3,42 3,00 3,00 DISTANCE (m) 3,00 3,00 3,45 2,47 3,00 3,00 DISTANCE (m)
DISTANCE (m) DISTANCE (m)
14,00 14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40 14,00
30,110
30,174
30,265
30,274
30,263
30,373
30,262
30,262
30,131
29,910
29,660
29,410
30,335
30,313
30,082
30,124
29,209
30,209
30,223
30,343
30,234
30,234
30,082
29,938
28,052
28,180
28,180
28,287
28,315
28,227
28,227
28,121
28,077
27,606
ELEVASI DESIGN
25,794
26,109
26,950
27,104
27,104
26,868
27,098
27,098
26,950
26,601
26,552
DESIGN LEVEL DESIGN LEVEL ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
29,465
30,157
30,182
30,021
30,097
30,088
30,176
30,055
30,017
29,859
29,657
29,337
29,607
30,335
30,313
30,264
30,066
29,998
30,031
30,048
30,098
29,988
29,906
29,965
29,938
27,978
27,957
27,996
28,017
28,103
28,052
28,023
28,065
28,077
27,606
25,794
25,794
26,109
26,739
26,794
26,917
26,934
26,844
26,705
26,612
26,601
26,552
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,20
0,25
0,25
0,20
2,00 2,00 2,00 1,20 3,50 3,20 3,00 3,00 3,00 2,00 1,50 2,90 3,20 2,00 2,00 JARAK (m)
0,30
0,14
3,00 3,00 3,38 2,52 2,00 3,00 1,00
DISTANCE (m) 3,00 3,00 3,00 2,97 3,29 3,00 3,00 3,00
DISTANCE (m)