AC - Binder Course = 6 cm

50

AC - Base = 7,5 cm U-Ditch Tipe DS-3
31 STA2+
3,00 % 3,00 % 5,00 % Selected Embankment
5,00 %
Asphalt Existing Selected Embankment 30
AC-Base Levelling = 4 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm

Bidang persamaan
Reference level
25,00
30,522

30,399
30,400

30,259

30,013

29,775

30,039

30,103

30,194
30,202
30,193
ELEVASI DESIGN
DESIGN LEVEL
30,305

30,224
30,121

30,165

30,013

29,775

29,837

29,906

29,889
30,026
30,018
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)

0,20
3,35 3,50 3,00 3,00 3,00 2,00 1,50
DISTANCE (m)

14,00 0,40 1,10 2,00

7,00 2,00 1,10 0,40

AC - Wearing Course = 4 cm
STA2+
AC - Binder Course = 6 cm
275 AC - Base = 7,5 cm U-Ditch Tipe DS-3 30
Selected Embankment
5,00 %

3,00 %
3,00 % 5,00 %

Asphalt Existing Selected Embankment


AC-Base Levelling = 5 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm

Bidang persamaan
Reference level
25,00

29,500

29,864

29,925

30,018
30,018
ELEVASI DESIGN
30,740

30,617
30,617

30,477

30,243

DESIGN LEVEL

29,500

29,803

29,840

29,774
29,835
ELEVASI TANAH ASLI
30,511

30,442
30,340

30,272

30,243

ORIGINAL GROUND LEVEL

JARAK (m)

0,25
3,00 2,00 1,50
3,25 3,51 3,00 3,00 DISTANCE (m)

AKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRA
DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS
KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN
CROSS SECTON IMPROVEMENT PROJECT (WINRIP)
BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN
YODYA KARYA
STA 2+300 ~ 2+325 (CORRIDOR SUMATERA)
NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. N
GENERAL CONTRACTOR PT. YODYA KARYA (Persero) MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT

14,00

7,00
0,40 1,10 2,00
NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:

KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON
PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN :
(CORRIDOR SUMATERA) YODYA KARYA
STA 2+000 ~ 2+025 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+250 ~ 2+275 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+500 ~ 02+525 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+750 ~ 2+775
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN :
PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001

14,00
14,00
14,00 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40
2,00 7,00 2,00 1,10 0,40 14,00
0,40 1,10 AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm AC - Wearing Course = 4 cm 1,10 0,40
STA2+250 AC - Binder Course = 6 cm
0,40 1,10 2,00 7,00 2,00
AC - Wearing Course = 4 cm
31
U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3 STA2+500
STA2+000
AC - Binder Course = 6 cm
3,00 %
3,00 %
31 AC - Base = 7,5 cm U-Ditch Tipe DS-3
AC - Wearing Course = 4 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3
5,00 % 5,00 % Selected Embankment
29
Selected Embankment 5,00 % 3,00 %
3,00 % 5,00 % 30 Asphalt Existing Selected Embankment 30
5,00 % 3,00 % 3,00 % 5,00 %
29 U-Ditch Tipe DS-3 STA2+750
AC - Binder Course = 6 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3
AC-Base Levelling = 4 cm CTB = 17.5 cm
Asphalt Existing Selected Embankment
5,00 % 3,00 %
3,00 % 5,00 %
Asphalt Existing Selected Embankment Agg Kelas A = 15 cm AC-Base Levelling = 5 cm CTB = 17.5 cm
Selected Embankment = 45 cm Agg Kelas A = 15 cm Asphalt Existing
AC-Base Levelling = 9 cm CTB = 17.5 cm
Selected Embankment = 45 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm AC-Base Levelling = 6 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm

Bidang persamaan Bidang persamaan


Bidang persamaan Bidang persamaan
Reference level Reference level
Reference level Reference level
24,00 24,00
25,00 25,00

28,021

28,274

28,312
28,312

28,416
28,416
28,423

28,537

28,420
28,420

28,320
28,303
28,285

28,211
ELEVASI DESIGN

28,083

27,919

28,048
28,064

28,182

28,066

27,919

28,196
30,175

30,259

30,294

30,400
30,400
30,405

30,522

30,399
30,400

30,259

30,013
ELEVASI DESIGN

29,775

30,039

30,103

30,194
30,202
30,193

30,302

30,191
30,191

30,060

29,901
ELEVASI DESIGN ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL DESIGN LEVEL

28,021

28,099

28,440
28,465

28,229
28,241
28,243

28,276

28,229
28,213

28,137
27,749
28,288

28,211
ELEVASI TANAH ASLI

28,083

27,902

27,830
27,850

27,952

27,891

28,123

28,196
ELEVASI TANAH ASLI

30,175

30,316

30,301

30,159
30,216
30,230

30,305

30,224
30,121

30,165

30,013
ELEVASI TANAH ASLI

29,775

29,837

29,906

29,889
30,026
30,018

30,067

29,967
29,906

29,926

29,901
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m)

0,19

0,25
0,25
JARAK (m)

0,27
2,00 2,00 1,50 3,27 3,34 1,50 2,00 JARAK (m)

0,15
JARAK (m) 3,00 3,00 3,40 3,33 3,00 3,00

0,20
DISTANCE (m) 2,00 2,00 1,50 3,35 3,50 3,00 3,00 3,00 2,00 1,50 2,90 3,20 2,00 3,00 DISTANCE (m)
DISTANCE (m) DISTANCE (m)

14,00
14,00
14,00 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40
2,00 7,00 2,00 1,10 0,40 14,00
0,40 1,10 AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
STA2+525 AC - Base = 7,5 cm U-Ditch Tipe DS-3
0,40 1,10
STA2+025 AC - Base = 7,5 cm AC - Binder Course = 6 cm
Selected Embankment

U-Ditch Tipe DS-3
U-Ditch Tipe DS-3 STA2+275 AC - Base = 7,5 cm U-Ditch Tipe DS-3 30
Selected Embankment
5,00 % 3,00 % 3,00 % 5,00 % AC - Wearing Course = 4 cm
30 3,00 % AC - Binder Course = 6 cm
5,00 % 3,00 % 5,00 % 31
5,00 % 3,00 %
3,00 % 5,00 % Asphalt Existing Selected Embankment U-Ditch Tipe DS-3 STA2+775 AC - Base = 7,5 cm U-Ditch Tipe DS-3
Asphalt Existing Selected Embankment AC-Base Levelling = 5 cm CTB = 17.5 cm Selected Embankment
5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing Selected Embankment 28
AC-Base Levelling = 8 cm CTB = 17.5 cm 30 Agg Kelas A = 15 cm
CTB = 17.5 cm Selected Embankment = 45 cm Asphalt Existing
Agg Kelas A = 15 cm AC-Base Levelling = 5 cm
Selected Embankment = 45 cm Agg Kelas A = 15 cm
Selected Embankment = 45 cm AC-Base Levelling = 9 cm CTB = 17.5 cm
Selected Embankment
Agg Kelas A = 15 cm
Selected Embankment = 45 cm

Bidang persamaan Bidang persamaan Bidang persamaan


Bidang persamaan
Reference level Reference level Reference level
25,00 Reference level 25,00 24,00
26,00

29,500

29,864

29,925

30,018
30,018
30,027

30,127

30,027

29,909

29,799
29,424

29,424

29,387
29,503

29,677
29,627
29,663

29,677

29,577
29,680

29,453

29,413
29,272
ELEVASI DESIGN

27,743

27,794

27,926
27,926
27,939

28,057

27,930
27,930

27,724

26,950

27,555

27,663
ELEVASI DESIGN

30,599

30,477

30,513

30,618
30,618
30,625

30,740

30,617
30,617

30,477

30,243
ELEVASI DESIGN
DESIGN LEVEL ELEVASI DESIGN DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL

29,500

29,803

29,840

29,774
29,835
29,841

29,901

29,852

29,816

29,799
29,424

29,424

29,387
29,272

29,413

29,394
29,448
29,452

29,488

29,424
29,380

29,443

29,413
ELEVASI TANAH ASLI ELEVASI TANAH ASLI

27,743

27,708

27,692
27,700
27,714

27,796

27,755
27,693

27,645

26,950

27,555

27,663
ELEVASI TANAH ASLI

30,599

30,519

30,504

30,272
30,403
30,414

30,511

30,442
30,340

30,272

30,243
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)

0,25
0,12
JARAK (m)

0,23
3,00 1,50 3,25 3,43 2,00 3,00 JARAK (m) 3,00 2,00 1,50 2,88 2,87 2,00 3,00 2,00 3,00 3,00 3,00 3,40 3,57 3,50 1,00 1,00 2,00

0,24
DISTANCE (m) 2,00 2,00 1,50 3,25 3,51 3,00 3,00 DISTANCE (m) DISTANCE (m)
DISTANCE (m)

NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:

KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP)
PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN :
(CORRIDOR SUMATERA) YODYA KARYA
STA 2+050 ~ 2+075 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+300 ~ 2+325 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+550 ~ 2+575 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+800 ~ 2+825
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN :
PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001

14,00
14,00 14,00
14,00
0,40 1,10 7,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm
AC - Wearing Course = 4 cm AC - Binder Course = 6 cm AC - Wearing Course = 4 cm

STA2+050 AC - Binder Course = 6 cm U-Ditch Tipe DS-3 STA2+300 AC - Base = 7,5 cm U-Ditch Tipe DS-3 STA2+550 AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3 U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
U-Ditch Tipe DS-3 STA2+800 AC - Base = 7,5 cm
30 31 5,00 % 3,00 % 3,00 % 5,00 %
30 3,00 %
U-Ditch Tipe DS-3
Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 % 5,00 % 3,00 % 5,00 %
28 5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing
Asphalt Existing Selected Embankment 30 Asphalt Existing Selected Embankment
AC-Base Levelling = 6 cm CTB = 17.5 cm Asphalt Existing
AC-Base Levelling = 7 cm CTB = 17.5 cm Agg Kelas A = 15 cm AC-Base Levelling = 3 cm CTB = 17.5 cm
Agg Kelas A = 15 cm Selected Embankment = 45 cm Agg Kelas A = 15 cm Agg Kelas S = 17,5 cm Selected Embankment
Selected Embankment = 45 cm Selected Embankment = 45 cm
AC-Base Levelling = 11 cm

25
Bidang persamaan
Bidang persamaan Bidang persamaan
Reference level Bidang persamaan
Reference level Reference level
26,00 Reference level
25,00 25,00
23,00

30,177

30,587

30,635

30,734
30,734
30,740

30,850

30,715
30,715

30,609

30,588
ELEVASI DESIGN
28,874

29,322

29,571

29,673
29,673
29,678

29,792

29,673
29,673

29,535
28,535
28,543

28,673

29,312

29,627

29,684

29,779
29,779
29,788

29,890

29,792

29,676

29,535
29,173
29,594

29,516
ELEVASI DESIGN ELEVASI DESIGN

27,955

27,748

27,798
27,798
27,809

27,928

27,798
27,798

27,664

26,064

27,674

27,735
DESIGN LEVEL ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL

30,177

30,431

30,508

30,400
30,496
30,505

30,621

30,540
30,521

30,609

30,588
ELEVASI TANAH ASLI
28,874

29,653

29,700

29,474
29,489
29,503

29,547

29,495
29,445

29,234
28,720
28,735

28,673

29,312

29,657

29,689

29,547
29,597
29,613

29,688

29,617

29,534

29,535
29,173
29,594

29,516
ELEVASI TANAH ASLI ELEVASI TANAH ASLI

27,955

27,706

27,582
27,575
27,583

27,644

27,623
27,549

27,582

26,909

27,674

27,735
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m)

0,17
JARAK (m) 2,00 2,00 1,50 3,15 3,68 3,00 3,00 JARAK (m)

0,15

0,25
0,25

0,29

0,40
0,40
3,00 2,00 1,50 3,25 3,40 2,00 2,00 DISTANCE (m) 3,00 2,00 1,50 2,90 2,81 2,00 3,00 2,00 JARAK (m)

0,20
DISTANCE (m) DISTANCE (m) 3,00 3,00 3,40 3,60 3,00 1,00 1,00 3,00
DISTANCE (m)

14,00 14,00
14,00 14,00
7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
STA2+075
AC - Binder Course = 6 cm
U-Ditch Tipe DS-3 STA2+325 AC - Base = 7,5 cm AC - Binder Course = 6 cm
AC - Wearing Course = 4 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3 U-Ditch Tipe DS-3
STA2+575 STA2+825
AC - Binder Course = 6 cm
30
Selected Embankment
31 3,00 % 3,00 %
30
U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3 U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
5,00 % 3,00 % 3,00 % 5,00 % 5,00 % 5,00 %
5,00 % 3,00 %
3,00 % 5,00 % 28 Selected Embankment 3,00 % 3,00 %
5,00 % 5,00 %
Asphalt Existing Selected Embankment
Asphalt Existing 30 Asphalt Existing
AC-Base Levelling = 6 cm CTB = 17.5 cm Selected Embankment Asphalt Existing
AC-Base Levelling = 9 cm CTB = 17.5 cm
Agg Kelas A = 15 cm Agg Kelas A = 15 cm AC-Base Levelling = 3 cm CTB = 17.5 cm CTB = 17.5 cm
Selected Embankment = 45 cm AC-Base Levelling = 10 cm Selected Embankment
Selected Embankment = 45 cm Agg Kelas A = 15 cm Agg Kelas A = 15 cm
Selected Embankment = 45 cm Selected Embankment = 45 cm

25
Bidang persamaan
Bidang persamaan Bidang persamaan
Reference level Bidang persamaan
Reference level Reference level
26,00 Reference level
25,00 25,00
23,00

30,399

30,468

30,507

30,610
30,610
30,617

30,731

30,605
30,605

30,468

30,437
ELEVASI DESIGN
29,238

29,572
29,572

29,613

29,716
29,716
29,720

29,835

29,717
29,717

29,567

29,587

29,399

29,432

29,523
29,523
29,532

29,631

29,525
29,525

29,367

29,184
ELEVASI DESIGN ELEVASI DESIGN

27,053

27,481

27,507

27,636
27,636
27,652

27,771

27,646
27,646

27,477

26,856

27,455

27,461
DESIGN LEVEL ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL

30,399

30,428

30,406

30,310
30,383
30,408

30,499

30,430
30,378

30,425

30,437
ELEVASI TANAH ASLI
29,238

29,299
29,638

29,671

29,516
29,539
29,545

29,567

29,521
29,521

29,606

29,587

29,399

29,426

29,284
29,332
29,342

29,425

29,350
29,279

29,217

29,184
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

27,053

27,481

27,444

27,364
27,391
27,403

27,493

27,471
27,398

27,414

26,856

27,455

27,461
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m)

0,20
JARAK (m) 2,00 2,00 1,50 3,25 3,55 3,00 3,00 JARAK (m)
0,12

0,25
2,00 2,00 1,50 3,30 3,38 2,50 3,00 DISTANCE (m) 3,00 1,50 2,83 3,02 3,00 3,00 JARAK (m)

0,27

0,75

0,75
DISTANCE (m) DISTANCE (m) 3,00 3,00 3,00 3,40 3,53 3,50 3,00
DISTANCE (m)

NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:

KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON IMPROVEMENT PROJECT (WINRIP) CROSS SECTON
PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN BULAN :
(CORRIDOR SUMATERA) YODYA KARYA
STA 2+100 ~ 2+125 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+350 ~ 2+375 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+600 ~ 2+625 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+850 ~ 2+875
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN :
PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001

14,00 14,00
14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40 14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm 0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm AC - Wearing Course = 4 cm
STA2+100 AC - Base = 7,5 cm U-Ditch Tipe DS-3 STA2+350
AC - Binder Course = 6 cm
AC - Wearing Course = 4 cm AC - Binder Course = 6 cm

AC - Base = 7,5 cm U-Ditch Tipe DS-3
AC - Binder Course = 6 cm U-Ditch Tipe DS-3 STA2+850 AC - Base = 7,5 cm U-Ditch Tipe DS-3
30 Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 % 31 3,00 % 3,00 % 30 STA2+600 28
5,00 % 5,00 % U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing Asphalt Existing 5,00 % 3,00 % 3,00 % 5,00 %
30 Selected Embankment
Asphalt Existing Selected Embankment
AC-Base Levelling = 8 cm CTB = 17.5 cm AC-Base Levelling = 9 cm CTB = 17.5 cm
Agg Kelas A = 15 cm Asphalt Existing Selected Embankment AC-Base Levelling = 10 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm Selected Embankment = 45 cm CTB = 17.5 cm Agg Kelas A = 15 cm
AC-Base Levelling = 6 cm
Agg Kelas A = 15 cm Selected Embankment = 45 cm
Selected Embankment = 45 cm

25
Bidang persamaan Bidang persamaan Bidang persamaan
Bidang persamaan
Reference level Reference level Reference level
Reference level
25,00 26,00 23,00
25,00
29,005

29,583
29,583

29,627

29,728
29,728
29,733

29,846

29,730
29,730

29,593

29,734

30,022

30,422

30,459

30,564
30,564
30,568

30,685

30,561
30,561

30,422

30,187

27,402

27,348

27,482
27,482
27,493

27,612

27,482
27,482

27,313

26,527

27,362

27,384
ELEVASI DESIGN ELEVASI DESIGN ELEVASI DESIGN

29,195

29,063

29,218
29,218
29,227

29,327

29,218
29,218

29,092
29,063
29,063

28,875
ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL

30,022

30,503

30,508

30,331
30,384
30,393

30,422

30,366
30,184

30,201

30,187
29,005

29,105
29,610

29,627

29,506
29,545
29,553

29,591

29,555
29,530

29,733

29,734

ELEVASI TANAH ASLI ELEVASI TANAH ASLI

27,402

27,365

27,248
27,254
27,261

27,335

27,307
27,247

27,313

26,527

27,362

27,384
ELEVASI TANAH ASLI

29,195

29,125

28,988
29,037
29,052

29,088

29,033
28,945

28,916
28,267
28,902

28,875
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)

0,12
JARAK (m)
0,13

0,20
3,00 2,00 1,50 3,25 3,32 3,00 3,00 2,00 2,00 1,50 3,35 3,53 3,00 3,00 JARAK (m)

0,25

0,50
0,50
DISTANCE (m) 3,00 3,00 3,40 3,60 4,00 1,00 1,00 2,00
DISTANCE (m) 3,00 3,00 2,85 3,10 2,00 3,00 DISTANCE (m)
DISTANCE (m)

14,00
14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40 14,00
14,00
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm 0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm STA2+375 AC - Base = 7,5 cm U-Ditch Tipe DS-3
STA2+125 AC - Base = 7,5 cm U-Ditch Tipe DS-3 Selected Embankment AC - Wearing Course = 4 cm AC - Wearing Course = 4 cm
Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 %
31 AC - Binder Course = 6 cm AC - Binder Course = 6 cm
30 5,00 % 3,00 % 3,00 % 5,00 % 30 U-Ditch Tipe DS-3
STA2+625 AC - Base = 7,5 cm U-Ditch Tipe DS-3 STA2+875 AC - Base = 7,5 cm U-Ditch Tipe DS-3
Asphalt Existing U-Ditch Tipe DS-3 28
Asphalt Existing
Selected Embankment
5,00 % 3,00 % 3,00 % 5,00 %
30 AC-Base Levelling = 13 cm CTB = 17.5 cm 5,00 % 3,00 % 3,00 % 5,00 % Selected Embankment
AC-Base Levelling = 5 cm CTB = 17.5 cm Agg Kelas A = 15 cm
Selected Embankment = 45 cm Asphalt Existing Asphalt Existing Selected Embankment
Agg Kelas A = 15 cm Selected Embankment
Selected Embankment = 45 cm AC-Base Levelling = 8 cm CTB = 17.5 cm
AC-Base Levelling = 7 cm CTB = 17.5 cm
Agg Kelas A = 15 cm Agg Kelas A = 15 cm
Selected Embankment = 45 cm Selected Embankment = 45 cm

25
Bidang persamaan Bidang persamaan
Bidang persamaan
Reference level Bidang persamaan
Reference level Reference level
26,00 25,00 Reference level
25,00
23,00
30,121

30,850

30,885

30,991
30,991
30,998

31,113

30,991

30,850

30,686
ELEVASI DESIGN
29,290

29,628
29,628

29,666

29,770
29,770
29,734

29,891

29,766
29,766

29,628

29,659

29,037

28,845

29,008
29,008
29,012

29,108

28,996
28,996

28,845

28,649
ELEVASI DESIGN ELEVASI DESIGN

26,128

26,128
26,413

27,207

27,323
27,323
27,344

27,470

27,353
27,083

27,007

26,508

27,104

27,087
DESIGN LEVEL ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
DESIGN LEVEL
30,121

30,789

30,842

30,642
30,708
30,721

30,807

30,816

30,699

30,686
ELEVASI TANAH ASLI

29,037

29,014

28,793
28,821
28,837

28,864

28,782
28,707

28,671

28,649
29,290

29,430
29,649

29,688

29,524
29,588
29,599

29,660

29,582
29,553

29,651

29,659

ELEVASI TANAH ASLI ELEVASI TANAH ASLI

26,128

26,128
26,413

27,043

27,058
27,106
27,118

27,216

27,178
27,083

27,007

26,508

27,104

27,087
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m)

0,20
JARAK (m) 2,00 2,00 1,50 3,30 3,50 3,00 3,00 JARAK (m)

0,13
0,11

2,00 2,00 1,50 3,35 3,54 3,00 3,00 DISTANCE (m) 3,00 3,00 2,75 3,22 3,00 3,00 JARAK (m)

0,30

0,75

0,75
DISTANCE (m) DISTANCE (m) 3,00 2,00 2,00 3,55 3,35 4,00 3,00
DISTANCE (m)

NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:

KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP)
PERUMAHAN RAKYAT CROSS SECTON BULAN : PERUMAHAN RAKYAT CROSS SECTON BULAN : PERUMAHAN RAKYAT CROSS SECTON BULAN : PERUMAHAN RAKYAT CROSS SECTON BULAN :
(CORRIDOR SUMATERA) LOKASI : PADANG PARIAMAN YODYA KARYA (CORRIDOR SUMATERA) LOKASI : PADANG PARIAMAN (CORRIDOR SUMATERA) LOKASI : PADANG PARIAMAN (CORRIDOR SUMATERA) LOKASI : PADANG PARIAMAN
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) STA 2+150 ~ 2+175 TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero)
YODYA KARYA
STA 2+400 ~ 2+425 TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero)
YODYA KARYA
STA 2+650 ~ 2+675 TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero)
YODYA KARYA
STA 2+900 ~ 2+925 TAHUN :
PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero) PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT GENERAL CONTRACTOR MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001

14,00

14,00 0,40 1,10 2,00 7,00 2,00 1,10 0,40


14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40 AC - Wearing Course = 4 cm 14,00
AC - Binder Course = 6 cm 0,40 1,10 2,00 7,00 2,00 1,10 0,40
AC - Wearing Course = 4 cm STA2+400 AC - Base = 7,5 cm U-Ditch Tipe DS-3
0,40 1,10 2,00 7,00 2,00 1,10 0,40

STA2+150 AC - Binder Course = 6 cm


AC - Base = 7,5 cm U-Ditch Tipe DS-3
Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 % AC - Wearing Course = 4 cm
AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm
31 STA2+650 AC - Binder Course = 6 cm
30 5,00 % 3,00 % 3,00 % 5,00 % Asphalt Existing Selected Embankment U-Ditch Tipe DS-3

AC - Base = 7,5 cm U-Ditch Tipe DS-3
28 U-Ditch Tipe DS-3 STA2+900 AC - Base = 7,5 cm U-Ditch Tipe DS-3
30 AC-Base Levelling = 13 cm CTB = 17.5 cm 29 5,00 % 3,00 % 3,00 % 5,00 %
3,00 % 3,00 %
Asphalt Existing Selected Embankment Agg Kelas A = 15 cm Selected Embankment 5,00 % 5,00 %
CTB = 17.5 cm Selected Embankment = 45 cm Asphalt Existing
AC-Base Levelling = 8 cm
Agg Kelas A = 15 cm Asphalt Existing
AC-Base Levelling = 4 cm CTB = 17.5 cm
Selected Embankment = 45 cm AC-Base Levelling = 10 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment = 45 cm Agg Kelas A = 15 cm Selected Embankment
Selected Embankment = 45 cm

25
Bidang persamaan
Bidang persamaan Reference level Bidang persamaan
Reference level 26,00 Bidang persamaan Reference level
25,00 Reference level 23,00
30,719

30,958

31,102
31,102
31,111

31,221

31,094

30,958

30,972
ELEVASI DESIGN 24,00

26,048

26,315

27,080

27,221
27,221
27,226

27,343

27,219
27,219

27,080

26,560

26,886

26,813
29,746

29,729

29,778

29,877
29,877
29,885

29,993

29,871
29,871

29,730

29,623

26,048
ELEVASI DESIGN DESIGN LEVEL ELEVASI DESIGN

28,650

28,693

28,812
28,812
28,818

28,913

28,800
28,800

28,650

28,962
DESIGN LEVEL ELEVASI DESIGN DESIGN LEVEL
30,719

30,770

30,808
30,841
30,858

30,917

30,919

30,928

30,972
ELEVASI TANAH ASLI DESIGN LEVEL
29,746

29,817

29,822

29,673
29,686
29,709

29,736

29,684
29,615

29,618

29,623

ORIGINAL GROUND LEVEL

26,048

26,048
26,315

26,959

26,988
26,991
27,000

27,068

27,044
26,986

27,003

26,178

26,886

26,813
ELEVASI TANAH ASLI ELEVASI TANAH ASLI

28,904

28,907

28,644
28,637
28,639

28,695

28,592
28,582

28,861

28,962
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL
JARAK (m)
0,28

3,00 3,00 3,15 3,57 3,00 3,00 ORIGINAL GROUND LEVEL


JARAK (m) DISTANCE (m) JARAK (m)
0,22

0,13
3,00 2,00 1,50 3,10 3,48 3,00 3,00 3,00 2,00 3,00 3,35 3,52 3,00 1,00 1,00 3,00
JARAK (m)

0,18
DISTANCE (m) 2,00 2,00 2,70 3,22 3,00 3,00 DISTANCE (m)
DISTANCE (m)

14,00 14,00
14,00
2,00 7,00 2,00 1,10 0,40 0,40 1,10 7,00
0,40 1,10 14,00
0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40 AC - Wearing Course = 4 cm
AC - Wearing Course = 4 cm
AC - Wearing Course = 4 cm AC - Binder Course = 6 cm
AC - Binder Course = 6 cm STA2+425
AC - Binder Course = 6 cm
28 U-Ditch Tipe DS-3 STA2+925 AC - Base = 7,5 cm U-Ditch Tipe DS-3
STA2+175 AC - Base = 7,5 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3
30
AC - Wearing Course = 4 cm
U-Ditch Tipe DS-3
STA2+675 AC - Binder Course = 6 cm
5,00 % 3,00 % 3,00 % 5,00 %
5,00 % 3,00 % 3,00 % 5,00 %
31 5,00 % 3,00 % 3,00 % 5,00 % U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
Selected Embankment
30 Asphalt Existing
Asphalt Existing 5,00 % 3,00 % 3,00 % 5,00 % Selected Embankment
Asphalt Existing Selected Embankment
30 AC-Base Levelling = 8 cm CTB = 17.5 cm AC-Base Levelling = 10 cm CTB = 17.5 cm
AC-Base Levelling = 5 cm CTB = 17.5 cm Asphalt Existing Agg Kelas A = 15 cm
Agg Kelas A = 15 cm Selected Embankment Selected Embankment = 45 cm
Agg Kelas A = 15 cm Selected Embankment = 45 cm AC-Base Levelling = 4 cm CTB = 17.5 cm
Selected Embankment = 45 cm
Agg Kelas A = 15 cm 25
Selected Embankment = 45 cm

Bidang persamaan
Bidang persamaan Bidang persamaan
Reference level Bidang persamaan
Reference level Reference level
26,00 Reference level
25,00 22,00
30,050

30,639

30,685

30,786
30,793
30,811
30,799

30,903

30,782
30,782

30,639

30,360

ELEVASI DESIGN 24,00

25,788

25,788
26,498

27,033

27,174
27,175
27,179

27,296

27,172
27,172

27,033

26,748

26,637
ELEVASI DESIGN
29,796

29,790

29,834

29,935
29,935
29,941

30,053

29,930
29,930

29,796

29,845

ELEVASI DESIGN DESIGN LEVEL

28,808

29,042

28,738
28,740
28,746

28,856

28,721
28,721

28,593
28,593
28,593

28,267
ELEVASI DESIGN DESIGN LEVEL
DESIGN LEVEL
DESIGN LEVEL
30,050

30,673

30,688

30,480
30,509
30,568
30,573

30,650

30,607
30,492

30,378

30,360

ELEVASI TANAH ASLI

25,788

25,788
26,498

26,637

26,967
26,987
26,994

27,016

26,997
26,843

26,853

26,748

26,637
ELEVASI TANAH ASLI
29,796

29,940

29,929

29,732
29,760
29,744

29,831

29,740
29,711

29,822

29,845

ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL

29,077

28,862

28,560
28,562
28,571

28,570

28,509
28,471

28,368
27,950
28,323

28,267
ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
JARAK (m) ORIGINAL GROUND LEVEL
0,20
0,20

3,00 2,00 1,50 2,95 3,45 3,00 3,00 JARAK (m)

0,13
JARAK (m) DISTANCE (m)
0,18

3,00 2,00 1,50 3,20 3,52 3,00 4,00 3,00 3,00 3,00 3,35 3,52 3,00 3,00 3,00
JARAK (m) DISTANCE (m)

0,18

0,40
0,40
DISTANCE (m) 3,00 3,00 3,15 3,68 2,00 3,00
DISTANCE (m)

NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001 NOMOR PAKET : 20 KONTRAKTOR PELAKSANA: KONSULTAN SUPERVISI: SHOP DRAWING JUDUL GAMBAR SKALA NO GAMBAR : CR-001
REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH: REPUBLIK INDONESIA WESTERN INDONESIAN NATIONAL ROADS DIBUAT OLEH: DIPERIKSA OLEH: DISETUJUI OLEH:

KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL : KEMENTERIAN PEKERJAAN UMUM DAN NAMA PAKET : LUBUK ALUNG - SICINCIN KONTRAKTOR PELAKSANA KONSULTAN SUPERVISI PEJABAT PEMBUAT KOMITMEN (PPK)-06
TANGGAL :
IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP) IMPROVEMENT PROJECT (WINRIP)
PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN : PERUMAHAN RAKYAT LOKASI : PADANG PARIAMAN CROSS SECTON BULAN :
(CORRIDOR SUMATERA) YODYA KARYA
STA 2+200 ~ 2+225 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+450 ~ 2+475 (CORRIDOR SUMATERA) YODYA KARYA
STA 2+700 ~ 2+725 (CORRIDOR SUMATERA) YODYA KARYA
STA 0+000 ~ 0+025
DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN : DIREKTORAT JENDERAL BINA MARGA PT. NINDYA KARYA (Persero) TAHUN :
GENERAL CONTRACTOR PT. YODYA KARYA (Persero) GENERAL CONTRACTOR PT. YODYA KARYA (Persero) GENERAL CONTRACTOR PT. YODYA KARYA (Persero) GENERAL CONTRACTOR PT. YODYA KARYA (Persero)
PROVINSI : SUMATERA BARAT MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
PROVINSI : SUMATERA BARAT MOHAMMAD TAUFIK, ST
GENERAL SUPERINTENDENT
IR. SUNARIYADI
SITE SUPERVISION ENGINEER
MIRAL MUKHAZI, ST
19680528 200710 1 001
14,00
14,00
14,00 0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40
0,40 1,10 2,00 7,00 2,00 1,10 0,40 AC - Wearing Course = 4 cm 14,00
AC - Binder Course = 6 cm
AC - Wearing Course = 4 cm STA2+450 AC - Base = 7,5 cm U-Ditch Tipe DS-3
0,40 1,10 2,00 7,00 2,00 1,10 0,40 AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm
AC - Binder Course = 6 cm 31 STA2+950
31 STA2+200 AC - Base = 7,5 cm
Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 % AC - Wearing Course = 4 cm
U-Ditch Tipe DS-3 AC - Base = 7,5 cm U-Ditch Tipe DS-3
U-Ditch Tipe DS-3
Selected Embankment 3,00 %
5,00 % 3,00 % 3,00 % 5,00 % 30 Asphalt Existing STA2+700
AC - Binder Course = 6 cm
AC - Base = 7,5 cm U-Ditch Tipe DS-3 27
5,00 % 3,00 % 5,00 %
30 Selected Embankment 29
Asphalt Existing Selected Embankment
AC-Base Levelling = 9 cm CTB = 17.5 cm
Agg Kelas A = 15 cm
Selected Embankment
Selected Embankment
5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing Selected Embankment
AC-Base Levelling = 4 cm CTB = 17.5 cm
AC-Base Levelling = 7 cm CTB = 17.5 cm Selected Embankment = 45 cm
Asphalt Existing Agg Kelas A = 15 cm
Agg Kelas A = 15 cm Selected Embankment = 45 cm
Selected Embankment = 45 cm AC-Base Levelling = 8 cm CTB = 17.5 cm
Agg Kelas A = 15 cm 25
Selected Embankment = 45 cm

Bidang persamaan Bidang persamaan


Bidang persamaan Bidang persamaan
Reference level Reference level
Reference level 25,00 Reference level 22,00
25,00 24,00
30,039

30,334

30,397

30,489
30,489
30,496

30,597

30,478
30,478

30,341

29,894

25,741

25,741
26,209

26,923

27,071
27,071
27,076

27,186

27,071
27,071

26,923

26,814

26,797
ELEVASI DESIGN ELEVASI DESIGN
28,177

28,238

28,415
28,415
28,426

28,547

28,460
28,460

28,327

28,669
30,278

30,108

29,914

29,958

30,059
30,059
30,064

30,177

30,058
30,058

29,914

29,740

ELEVASI DESIGN DESIGN LEVEL ELEVASI DESIGN DESIGN LEVEL


DESIGN LEVEL DESIGN LEVEL
30,039

30,080

30,175

30,176
30,270
30,280

30,336

30,303
30,255

29,859

29,894

25,741

25,741
26,209

26,830

26,890
26,891
26,895

26,967

26,896
26,795

26,779

26,814

26,797
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
30,278

30,108

30,091

29,879

29,877
29,884
29,885

29,935

29,826
29,781

29,801

29,740

28,177

28,263

28,221
28,240
28,251

28,309

28,209
28,188

28,332

28,669
ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,20

0,15
JARAK (m) 3,00 2,00 1,50 2,90 3,40 2,00 3,00 JARAK (m) 3,00 3,00 3,00 3,15 3,30 3,00 3,00 3,00
0,13

0,18

2,00 3,00 2,00 1,50 3,25 3,42 3,00 3,00 DISTANCE (m) 3,00 3,00 3,45 2,47 3,00 3,00 DISTANCE (m)
DISTANCE (m) DISTANCE (m)

14,00 14,00

0,40 1,10 2,00 7,00 2,00 1,10 0,40 0,40 1,10 2,00 7,00 2,00 1,10 0,40 14,00

14,00 0,40 1,10 2,00 7,00 2,00 1,10 0,40


AC - Wearing Course = 4 cm AC - Wearing Course = 4 cm
AC - Binder Course = 6 cm
STA2+225 AC - Binder Course = 6 cm
STA2+475 AC - Base = 7,5 cm
0,40 1,10 2,00 7,00 2,00 1,10 0,40 AC - Wearing Course = 4 cm
31 AC - Base = 7,5 cm U-Ditch Tipe DS-3 31 U-Ditch Tipe DS-3
AC - Binder Course = 6 cm
3,00 %
3,00 % 3,00 %
3,00 % 5,00 % AC - Wearing Course = 4 cm U-Ditch Tipe DS-3
STA2+975 AC - Base = 7,5 cm U-Ditch Tipe DS-3
5,00 % 5,00 % 5,00 %
30 30 Asphalt Existing STA2+725
AC - Binder Course = 6 cm
Selected Embankment 5,00 % 3,00 % 3,00 % 5,00 %
Asphalt Existing Selected Embankment 29 AC - Base = 7,5 cm U-Ditch Tipe DS-3 27
AC-Base Levelling = 7 cm CTB = 17.5 cm AC-Base Levelling = 3 cm CTB = 17.5 cm Selected Embankment Selected Embankment
5,00 % 3,00 %
3,00 % 5,00 % Asphalt Existing
Agg Kelas A = 15 cm Agg Kelas A = 15 cm Selected Embankment
Selected Embankment = 45 cm Selected Embankment = 45 cm AC-Base Levelling = 8 cm CTB = 17.5 cm
Asphalt Existing Agg Kelas A = 15 cm
CTB = 17.5 cm Selected Embankment = 45 cm
AC-Base Levelling = 4 cm
Agg Kelas A = 15 cm 25
Selected Embankment = 45 cm

Bidang persamaan Bidang persamaan


Bidang persamaan Bidang persamaan
Reference level Reference level
Reference level Reference level
25,00 25,00
24,00 22,00
29,465

30,110

30,174

30,265
30,274
30,263

30,373

30,262
30,262

30,131

29,910
29,660
29,410
30,335

30,313

30,082

30,124

29,209
30,209
30,223

30,343

30,234
30,234

30,082

29,938

ELEVASI DESIGN ELEVASI DESIGN


27,980

28,052

28,180
28,180
28,287

28,315

28,227
28,227

28,121

28,077

27,606

ELEVASI DESIGN

26,963 27, 213


25,794

25,794
26,109

26,950

27,104
27,104
26,868

27,098
27,098

26,950

26,601

26,552
DESIGN LEVEL DESIGN LEVEL ELEVASI DESIGN
DESIGN LEVEL DESIGN LEVEL
29,465

30,157

30,182

30,021
30,097
30,088

30,176

30,055
30,017

29,859

29,657
29,337
29,607
30,335

30,313

30,264

30,066

29,998
30,031
30,048

30,098

29,988
29,906

29,965

29,938

ELEVASI TANAH ASLI ELEVASI TANAH ASLI


27,980

27,978

27,957
27,996
28,017

28,103

28,052
28,023

28,065

28,077

27,606

ELEVASI TANAH ASLI

25,794

25,794
26,109

26,739

26,794
26,917
26,934

26,844
26,705

26,612

26,601

26,552
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
JARAK (m) JARAK (m)
0,20

0,25
0,25
0,20

2,00 2,00 2,00 1,20 3,50 3,20 3,00 3,00 3,00 2,00 1,50 2,90 3,20 2,00 2,00 JARAK (m)
0,30

DISTANCE (m) DISTANCE (m) JARAK (m)

0,14
3,00 3,00 3,38 2,52 2,00 3,00 1,00
DISTANCE (m) 3,00 3,00 3,00 2,97 3,29 3,00 3,00 3,00
DISTANCE (m)