1 Memoria fotogrfica del estado actual del inmueble $13,001.21 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
2 Levantamiento topogrfico y arquitectnico del predio y el inmueble existente $28,002.56 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
3 Levantamiento de elementos estructurales $22,999.55 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
4 Anteproyecto Arquitectnico $34,004.48 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
5 Estudio de Mecnica de Suelos $32,009.26 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
6 Planta de localizacin $6,001.88 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
7 Plantas de Conjunto $7,501.00 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
8 Plantas Arquitectnicas $13,997.99 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
9 Plantas de Azotea $6,001.37 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
10 Fachadas generales $10,002.33 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
11 Cortes generales $10,998.60 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
12 Cortes por fachadas $11,999.92 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
13 Proyecto de albailera $12,000.70 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
14 Proyecto de Acabados $8,999.74 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
15 Proyecto de herrera $8,004.49 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
16 Proyecto de carpintera $8,000.08 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
17 Proyecto de demolicin y desmantelamientos $11,001.39 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
18 Memoria descriptiva $18,001.71 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
19 Planos estructurales $89,001.49 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
20 Memoria de clculo $52,000.31 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
21 Proyecto de instalacin hidrulica $15,004.53 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
22 Proyecto de instalacin sanitaria $15,004.53 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
23 Proyecto de instalacin pluvial $16,000.56 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
24 Memoria de calculo $12,000.61 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
25 Proyecto de instalacin elctrica. $24,001.30 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
26 Memoria de calculo $12,000.61 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
27 Proyecto de instalacin de gas $17,004.69 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
28 Memoria de Calculo $10,001.50 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
29 Proyecto de Equipamiento $8,000.95 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
30 Proyecto de Sealizacin $9,999.87 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
31 Firma de D.R.O. $59,507.33 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
32 U.V.I - C.F.E. = Unidad Verificadora de Instalaciones. Comision Federal de Electricidad. $19,004.79 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
33 Tramite Declaratoria Cumplimiento Ambiental $24,001.06 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
34 6.2.1.- PRELIMINARES. $547,537.52 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
35 6.2.2.- EXCAVACIONES. $187,000.52 1.00 $0.00 0.000% 0.000% $0.00 0.00% 0.00%
36 6.2.3.- CIMENTACION Y ESTRUCTURA. $7,400,007.43 1.00 $0.00 0.000% 0.000% $1,287,231.29 17.40% 8.31%
37 6.2.4.- ALBAILERIA, ACABADOS Y HERRERIA. $5,799,998.64 1.00 $869,999.80 15.000% 5.617% $576,519.86 9.94% 3.72%
38 6.2.5.- INSTALACIONES HIDRAULICAS. $100,024.26 1.00 $25,006.07 25.000% 0.161% $0.00 0.00% 0.00%
39 6.2.6.- INSTALACION SANITARIAS. $115,000.01 1.00 $28,750.00 25.000% 0.186% $0.00 0.00% 0.00%
40 6.2.7.- INSTALACION PLUVIAL. $120,004.50 1.00 $30,001.13 25.000% 0.194% $11,928.45 9.94% 0.08%
41 6.2.8.- INSTALACION DE GAS. $149,986.04 1.00 $37,496.51 25.000% 0.242% $0.00 0.00% 0.00%
42 6.2.9.- INSTALACION ELECTRICA. $424,999.71 1.00 $106,249.93 25.000% 0.686% $0.00 0.00% 0.00%
TOTAL SIN IVA $15,489,621.02 $1,097,503.43 7.09% $1,875,679.60 12.11% DATOS GENERALES DEL CONTRATO DE OBRA
-$14,628,218.16 DIFERENCIA: -5.02% CONTRATO No. MC-DGODU-LP-103-16
AVANCE FINANCIERO QUINCENAL IMPORTE S/IVA $15,489,621.01
INFORME No. 12 DEL 16 DE ABRIL DE 2017 AL 30 DE ABRIL DE 2017 MONTO C/IVA $17,967,960.37
ESTIMACIONES ANTICIPO FECHA DE INICIO CONTRACTUAL: 11 DE NOVIEMBRE DE 2016
No. IMPORTE ACUMULADO POR EJERCER AMORTIZACIN ACUMULADO POR EJERCER FECHA DE TRMINO CONTRACTUAL: 09 DE MAYO DE 2017
1 $3,515,232.67 $3,515,232.67 $11,974,388.35 FECHA DE INICIO DIFERIDA:
2 $2,050,552.39 $5,565,785.06 $9,923,835.96 FECHA DE TERMINACIN DIFERIDA:
3 $ 292,936.06 $5,858,721.12 $9,630,899.90 J.U.D. de Supervisin de Obra de Edificios Pblicos
4 $ 9,166,211.26 $15,024,932.38 $464,688.64
5 $ 92,937.72 $15,117,870.10 $371,750.92
MC-DGODU-AD-99-16
ING. CESAR RODRIGUEZ LPEZ
ADMINISTRACIN PUBLICA DE LA CIUDAD DE MEXICO
DELEGACIN LA MAGDALENA CONTRERAS
DIRECCIN GENERAL DE OBRAS Y DESARROLLO URBANO
DIRECCIN DE OBRAS
SUBDIRECCIN DE SUPERVISIN DE OBRAS
AVANCE
PERIODO AVANCE REAL AVANCE
PROGRAMADO
11 de noviembre 0.00% 0.00%
11 al 15 de noviembre 4.57% 0.38%
16 al 30 de noviembre 22.86% 1.69%
GRAFICA DE AVANCES REAL/ PROGRAMADO
1 al 15 de diciembre 32.03% 5.70% 100.00%
16 al 31 de diciembre 38.14% 7.70%
1 al 15 de enero 41.01% 11.52%
16 al 31 de enero 45.31% 16.07%
1 al 15 de febrero 52.59% 21.41%
16 al 28 de febrero 59.87% 25.63%
1 al 15 de marzo 67.96% 29.84% 75.00%
16 al 31 de marzo 76.05% 34.70%
1 al 15 de abril 83.14% 46.96%
16 al 30 de abril 90.22% 59.07%
1 al 09 de mayo 100.00%
50.00%
25.00%
OBRA: SERVICIO: