Henrik Sobolewski
PROMATIS AG, Switzerland
Hamburg, 20. Juni 2017
Agenda
(Detail to Summary)
Planning level
- the detail level Inventory Optimization
- the network to consider (subset, whole
supply network) Advanced Supply Chain Planning (ASCP)
- specific requirements e.g.
Rapid Planning
tolling, production or markets
Production
Review of short to long range planning Scheduling (PS)
(Detail to Summary)
Production Scheduling (single site usage,
Planning level
Inventory Optimization
typically production site)
Advanced Supply Chain Planning (ASCP)
Supply Chain Intelligence (APCC), Business
Intelligence tool to cover handling, analysis Rapid Planning
and evaluation of plan results
Production
Other tools to cover specific requirements Scheduling (PS)
Order Promising
Collaborative Planning
Excel
Excel
Long or short term planning?
Excel
Demantra
Constrained or unconstrained? Demand planning
Forecast
needs or single plan eg. global
ERP X
APCC
data
MDM
planning
Work orders -
ERP1
rescheduled
Excel
Excel
Business Intelligence (BI) tool.
Excel
Excel
It is used for:
Excel
Excel
Demantra
Interface to do day to day
planning activities for different Demand planning
Forecast
Reporting tool
Ad-hoc analysis tool
X
ERP X
APCC
data
APCC has the main features
Pre-built VCP content world ASCP
ERP2
ERP2
of dimensions and measures
with pre-built aggregation of Long range
information Work orders network
MDM
Modern, appealing user interface Work orders -
planning
Flexible, can be changed to
ERP1
rescheduled
support changing needs.
History of planning for trend New work orders
New purchase orders
analysis
Drill-to options ++ + +
Level of detail ++ ++ -
Aggregate information - + ++
Graphical presentations - - ++
Security ++ - ++
Excel
Excel
Based on ASCP collected data
Excel
Demantra
(no ASCP Plan)
Demand Planning
Forecast
schedule for work orders only
No forecast consumption
ERP X
APCC
data
floor scheduling application
Based on ASCP planned data ASCP
with plan reference ERP2 Long range
Work orders network
Schedule for work orders and
MDM
planning
planned orders Work orders -
ERP1
rescheduled
Firm planned orders flow
back flow back to ASCP for New work orders
New purchase orders
Material Planning
Create New Supply Orders Schedule the supply orders that have already been created
Create a supply chain plan for a network of plants, Create a production schedule for a single manufacturing
warehouses, suppliers and customers in the supply chain facility
Plan a mid to long term horizon Schedule the short term horizon
e.g. 6 months to 1 year e.g. 2 - 8 weeks
Model aggregate level production constraints Model very detailed production constraints
Make decision on procurement - Create new purchase Consider existing purchase orders as a source of supply. No
orders new purchasing decisions taken
Run various scenarios in Production Scheduling, approve and schedule/reschedule to ERP systems
15 2017 PROMATIS AG June 20, 2017
The VCP Suite of products
Core Products, PS Views, Sample Resource-Utilization Gantt
Maintenance of Setup VCP is not consistent in the functionality (e.g. hard constraints, sequence dependency
where in VCP (and Oracle for production operations, bottleneck resource groups, scheduling on primary resource
ERPs involved) or primary / secondary resource)
Region specific differences Sample: region specific UOM (Pound / LB / KG / L) existing in parallel as base UOM,
to consider ASCP cannot handle out of the box such cases
Chemical Industry
Process Manufacturing in some plants (recipe, routing, formula), while in
others routing and bill of material implemented
Heterogeneous ERP environments, no common Master Data Maintenance
established
Ongoing ERP implementation in one global region while strategic decision
for Oracles VCP taken in parallel (core: APCC, PS, ASCP, Demantra)
Requirement for Tank Management
Strong Toller business (outside processing over multiple regional chains),
mostly for packaging
Strong Make to Forecast model for markets by mostly regional production
plants
Markets
distribution plan for key top CL
MX
US FR
.. UK AU NZ
products AR
BR CA
..
ES
DE
IT
Level 2 Regional level ASCP
plans (combined market and
production plan)
Level 3 Plant level
production scheduling for
selective sites NZ Plant
Plants
South CH
Plant LA
US North
France UK Australia
Start simple and grow the complexity after establishing the foundation, based on
maturity and business need. Data, processes, people & system all need to work
successfully.
Implement a simple common ASCP model first (no constraints, basic features).
Keep complexities to scheduling. Scheduling will be implemented after successful use of
ASCP (tollgate approach), based on complexity of the site and the expected benefit.
Keep variance between plans in ASCP to a minimum to support quick deployment,
knowledge sharing and sustainable support effort.
Problem:
VCP (ASCP, PS) does not support tank management (resource/storage at the same time, tank capacity/tank selection)
Tank Management Solution:
Set up of constraints for visibility, hard links between operations, repetitive throughput per hour, max inventory level per item and further
Problem:
routing, recipe, formula (BOM, routing) in most involved ERP systems not following the planning logic (not multi-level recipe stages), most formulas are used in
Planning and Consumption
most cases only to build the consumption logic
Formulas
Solution:
Align formula intermediates with planning logic for getting proper planning results
Problem:
Multiple ways to maintain master data (sourcing, constraints, sequence dependency).
Maintenance of Data Solution:
Maintain data wherever possible directly in ERP, provide global template approach, rollout the solution to the different regions, in case of limitations in ERP use
the PS/ASCP module
Problem:
ASCP can only handle one common base uom at a time
Limitations in VCP for UOM
Solution:
Issue
Customization
Henrik Sobolewski
Principal Consultant und Projektleiter
PROMATIS AG