1.0 SCOPE

The scope of the project envisages sub-surface investigation to be carried


out for the purpose of the design of foundation for the proposed
residential building at Kakkanad. The scope of the work also involves
executing three bore holes with related field tests, collecting soil samples and
conducting related test and submission of technical report .

2.0 CODES AND STANDARDS

All works were carried out as per given specifications. Where not specified, the
latest relevant IS Codes were followed.

3.0 PURPOSE

The purpose of the proposed geo-technical investigation was to obtain the


following:

[a] To perform the required field investigation including soil boring with related
Field tests within the bore hole, collecting samples.

[1] To determine the type, extent of the sub-surface materials up to


5M (avg)

[2] To provide the engineering parameters required and to recommend


Suitable types of foundation for the proposed loading.
4.0 FIELD WORKS/TESTS

The field work in consists of-

[a] Executing three bore holes.

[b] Obtaining disturbed and undisturbed soil samples.

[c] Conducting Standard Dynamic Penetration tests as per the


Procedure prescribed in IS 2131.

5.0 PROGRAM OF INVESTIGATION

Keeping in view of the type of structure and loading pattern, three bore holes was
proposed.

6.0 PROCEDURE

The bore hole was executed using rotary method. Circulation of bentonite slurry was
used for advancing the bore holes and stabilizing the sides. Casing pipes were
introduced to protect the first meters. Representative samples were collected and
preserved in polythene bags.

Standard Penetration tests were conducted at regular intervals and also at points where
change of strata was observed.
POCKET ROAD

1610
I
420

II
1410

16
92

III
350
850
NEOTECH FOUNDATIONS
KOCHI
Project : Proposed residential building Date of commencement : 29/06/2017
Location :Pallikkara Date of completion : 29/06/2017
Bore hole No. :2 Ground water level :
Type of boring : Rotary Drilling
BORE LOG CHART &DATA SHEET
Depth Standard Penetration Test Graph of "N" value
Visual Description Thickness Depth 15 30 45 N 10 20 30 40 50 >50 Remarks
In Meter. of Soil of layers Value
(M)

Graval 1.00 6 8 8 16
1.5
2.00 SPT rebound
Hard laterite
3.0 3.00 20 20 27 47

4.50 5 11 14 25

6.00 8 12 17 29
Laterite clay with pabbls

8.00 10 14 16 30

10.0 10.00 10 16 16 32
End of Bore hole at 10.00m depth

Site -in -charge


NEOTECH FOUNDATIONS
KOCHI
Project : Proposed residential buildingDate of commencement : 29/06/2017
Location :Pallikkara Date of completion : 29/06/2017
Bore hole No. :3 Ground water level :
Type of boring : Rotary Drilling
BORE LOG CHART &DATA SHEET
Depth Standard Penetration Test Graph of "N" value
Visual Description Thickness Depth 15 30 45 N 10 20 30 40 50 >50 Remarks
In Meter. of Soil of layers Value
(M)

1.0 Graval 1.00 SPT Rebound without sample

Hard laterite 2.00 SPT rebound

3.0 3.00 22 50 50 Balance 15cm

4.50 16 30 20 50 Balance 8cm

6.00 15 23 27 50
Laterite clay with pabbls

8.00 12 20 18 38

10.0 10.00 14 16 13 29
End of Bore hole at 10.00m depth

Site -in -charge


Balance 15cm
NEOTECH FOUNDATIONS
KOCHI
Project : Proposed residential building Date of commencement : 28/06/2017
Location :Pallikkara Date of completion : 28/06/2017
Bore hole No. :1 Ground water level : 7.70m
Type of boring : Rotary Drilling
BORE LOG CHART &DATA SHEET
Depth Standard Penetration Test Graph of "N" value
Visual Description Thickness Depth 15 30 45 N 10 20 30 40 50 >50 Remarks
In Meter. of Soil of layers Value
(M)

Graval 1.00 5 7 8 15 nil


1.6
2.00 SPT rebound without sample
Hard laterite
3.0 3.00 18 22 28 50 Balance 8cm

4.50 16 22 28 50 Balance 5cm

6.00 14 20 30 50
Laterite clay with pabbls

7.50 14 19 21 40

9.00 10 20 25 45

10.50 10 22 28 50 Balance 3cm

12.0 12.00 6 15 17 32

13.50 4 12 12 24

15.00 4 8 12 30
Silty laterite clay

18.00 4 7 11 18

20.0 20.00 4 7 12 20
End of Bore hole at 20.00m depth Site -in -charge
RECOMMENDATIONS

INTRODUCTION

M/s NeoTech Foundations, Navullil(H), Amballur P.O, Ernalulam-682315 had conducted the
site investigation for the proposed Residence at Kakkanad for Mr Viviek. Three bore holes
were taken using rotary drilling upto a maximum depth of 20m for bore hole 1 and 10 m each
for borehole 2&3 respectively. Standard Penetration Tests were conducted at regular vertical
intervals and the samples, taken during the investigation.

DATA AND DISCUSSIONS

The soil profile in BH-1 location shows that the top layer is of gravel upto 1.0m depth. Below
that there is hard laterite upto 3m depth having N value of >50. After that, it is lateritic clay
with pebbles upto 12m depth having N value of 32 and >50. This is followed by moderately
strong medium silty lateritic clay upto the bored depth 20m. Ground water table is at 7.7m
below the ground level.

The soil profile in BH-2 location shows that the top layer is of gravel upto 1.0m depth. Below
that there is hard laterite upto 3m depth having N value of 47. After that, it is lateritic clay with
pebbles upto 10m depth having N value of 25 and 32. This bore hole was terminated at 10m.

The soil profile in BH-3 location shows that the top layer is of gravel upto 1.0m depth. Below
that there is hard laterite upto 3m depth having N value <50. After that, it is lateritic clay with
pebbles upto 10m depth having N value of 29 and 50. This bore hole was terminated at 10m.

Top laterite layer has good shear strength. So shallow foundation can be provided. Medium
hard rock is available at shallow depth. So foundation can be rested on hard rock also.

RECOMMENDATIONS

i) It is recommended to provide isolated footing resting at a depth of around 2.5m on


laterite layer having N value around 50 to support vertical column loads. A safe
bearing capacity of 250 kN/m2 can be assumed for a foundation size of 1.3m x
1.3m.
ii) Alternately, it is recommended to provide grid foundation resting at a depth of
around 2.0m on laterite layer having N value around 50 to support vertical column
loads. A safe bearing capacity of 180 kN/m2 can be assumed for the improved
ground for a foundation width of 0.7m. For design, Modulus of sub grade reaction
can be assumed as 35000 kN/m3.

iii) Factor of safety of 3 for end bearing and 2.5 for side friction are taken for the design.
Side friction for top 2.0m of soil is discarded.

iv) The sub structure has to be constructed as per latest IS code and it should be certified
by a qualified engineer.

v) These recommendations are based on the bore hole data obtained. If there is any
variation in the soil profile is observed during the boring operation, it should be
referred to a Geotechnical Engineer.

Cochin Romy Mohan, MTech, AMIE, CE(I)