SOIL INVESTIGATION
REPORT
Name of the work: Soil Investigation for the proposed residential building at
Kakkanad
NEOTECH FOUNDATIONS
NAVULLIL(H)
AMBALLUR
COCHIN,
KERALA
.
REPORT ON SOIL INVESTIGATION CARRIED OUT FOR THE
PROPOSED RESIDENTIAL BUILDING AT KAKKANAD
1.0 SCOPE
All works were carried out as per given specifications. Where not specified, the
latest relevant IS Codes were followed.
3.0 PURPOSE
[a] To perform the required field investigation including soil boring with related
Field tests within the bore hole, collecting samples.
Keeping in view of the type of structure and loading pattern, three bore holes was
proposed.
6.0 PROCEDURE
The bore hole was executed using rotary method. Circulation of bentonite slurry was
used for advancing the bore holes and stabilizing the sides. Casing pipes were
introduced to protect the first meters. Representative samples were collected and
preserved in polythene bags.
Standard Penetration tests were conducted at regular intervals and also at points where
change of strata was observed.
POCKET ROAD
1610
I
420
II
1410
16
92
III
350
850
NEOTECH FOUNDATIONS
KOCHI
Project : Proposed residential building Date of commencement : 29/06/2017
Location :Pallikkara Date of completion : 29/06/2017
Bore hole No. :2 Ground water level :
Type of boring : Rotary Drilling
BORE LOG CHART &DATA SHEET
Depth Standard Penetration Test Graph of "N" value
Visual Description Thickness Depth 15 30 45 N 10 20 30 40 50 >50 Remarks
In Meter. of Soil of layers Value
(M)
Graval 1.00 6 8 8 16
1.5
2.00 SPT rebound
Hard laterite
3.0 3.00 20 20 27 47
4.50 5 11 14 25
6.00 8 12 17 29
Laterite clay with pabbls
8.00 10 14 16 30
10.0 10.00 10 16 16 32
End of Bore hole at 10.00m depth
6.00 15 23 27 50
Laterite clay with pabbls
8.00 12 20 18 38
10.0 10.00 14 16 13 29
End of Bore hole at 10.00m depth
6.00 14 20 30 50
Laterite clay with pabbls
7.50 14 19 21 40
9.00 10 20 25 45
12.0 12.00 6 15 17 32
13.50 4 12 12 24
15.00 4 8 12 30
Silty laterite clay
18.00 4 7 11 18
20.0 20.00 4 7 12 20
End of Bore hole at 20.00m depth Site -in -charge
RECOMMENDATIONS
INTRODUCTION
M/s NeoTech Foundations, Navullil(H), Amballur P.O, Ernalulam-682315 had conducted the
site investigation for the proposed Residence at Kakkanad for Mr Viviek. Three bore holes
were taken using rotary drilling upto a maximum depth of 20m for bore hole 1 and 10 m each
for borehole 2&3 respectively. Standard Penetration Tests were conducted at regular vertical
intervals and the samples, taken during the investigation.
The soil profile in BH-1 location shows that the top layer is of gravel upto 1.0m depth. Below
that there is hard laterite upto 3m depth having N value of >50. After that, it is lateritic clay
with pebbles upto 12m depth having N value of 32 and >50. This is followed by moderately
strong medium silty lateritic clay upto the bored depth 20m. Ground water table is at 7.7m
below the ground level.
The soil profile in BH-2 location shows that the top layer is of gravel upto 1.0m depth. Below
that there is hard laterite upto 3m depth having N value of 47. After that, it is lateritic clay with
pebbles upto 10m depth having N value of 25 and 32. This bore hole was terminated at 10m.
The soil profile in BH-3 location shows that the top layer is of gravel upto 1.0m depth. Below
that there is hard laterite upto 3m depth having N value <50. After that, it is lateritic clay with
pebbles upto 10m depth having N value of 29 and 50. This bore hole was terminated at 10m.
Top laterite layer has good shear strength. So shallow foundation can be provided. Medium
hard rock is available at shallow depth. So foundation can be rested on hard rock also.
RECOMMENDATIONS
iii) Factor of safety of 3 for end bearing and 2.5 for side friction are taken for the design.
Side friction for top 2.0m of soil is discarded.
iv) The sub structure has to be constructed as per latest IS code and it should be certified
by a qualified engineer.
v) These recommendations are based on the bore hole data obtained. If there is any
variation in the soil profile is observed during the boring operation, it should be
referred to a Geotechnical Engineer.