CONTENTS

CHAPTER NO. DESCRIPTION PAGE NO.


01 INTRODUCTION 1-3
02 SCOPE OF WORK 1-6
03 BATTERY LIMITS 1-1
04 INSTRUCTIONS TO THE BIDDER 1-5
05 TECHNICAL SPECIFICATION 1-9
06 INSTRUMENTATION, CONTROL & AUTOMATION 1-21
07 ELECTRICS 1-2
08 CIVIL WORKS 1-9
09 STRUCTURAL WORK 1-2
10 PROJECT SCHEDULE & PROGRESS MONITORING 1-3
11 ERECTION, TESTING AND COMMISSIONING 1-3
12 COMPLETENESS 1-1
13 PERFORMANCE GUARANTEE TEST 1-3
ENCLOSURES
1 DRAWINGs 7

DRAWINGS:

S NO. DESCRIPTION DRAWING NO.


LAYOUT DRAWING
PROPOSED LAYOUT OF BUFFER VESSEL &
MEC/S/9101/02/40/10/24/075-B/01
1. PRMS FOR OXYGEN , NITROGEN & ARGON FOR
(2 SHEETS)
BOFs OF SMS-III
SCHEME DRAWINGS
PROPOSED SCHEME OF BUFFER VESSEL &
2. MEC/S/9101/02/40/10/24/075-B/02
PRMS FOR OXYGEN (TYPICAL)
PROPOSED SCHEME OF BUFFER VESSEL &
3. MEC/S/9101/02/40/10/24/075-B/03
PRMS FOR NITROGEN (TYPICAL)
PROPOSED SCHEME OF BUFFER VESSEL &
4. MEC/S/9101/02/40/10/24/075-B/04
PRMS FOR ARGON (TYPICAL)

G A OF NITROGEN VESSELS (To be Engineered/ Fabricated & Supplied by Contractor)

GUIDE DRAWING OF BUFFER VESSEL FOR C.3K20.SL.21545-FTK/FPA001, R-


5.
CONVERTOR EMERGENCY DRIVE 5 (SIEMENS-VAI )

Buffer Vessels & PRMS for Oxygen, Nitrogen & Argon Draft Contract Technical Specification
(Package no; 075-B) Content.
Page 1 of 2
GUIDE DRAWING OF BUFFER VESSEL FOR C.3K20.SL.22159-FTK/FPA001, R-
6.
LANCE EMERGENCY DRIVE 5 (SIEMENS-VAI )
INSTRUMENTATION, CONTROL & AUTOMATION
AUTOMATION (LEVEL-1) SYSTEM
7. MEC/S/9101/11/E5/A//075-B/001
CONFIGURATION DIAGRAM

Buffer Vessels & PRMS for Oxygen, Nitrogen & Argon Draft Contract Technical Specification
(Package no; 075-B) Content.
Page 2 of 2