Iteration 1
(kg/m ) 1000 e (m) 0.00025 (Pa-s) 0.00152 Swamee D-W h
CCW (1) KQ
Loop Pipe D (m) L (m) /D A (m) Q (m/s) V (m/s) Re (VD/) f K (8fL/gD) |2KQ| Q new Q
CW (-1) CCW (+) CW (-)
A ab 0.300 250 0.000833 0.070686 -0.040 -1 0.57 111687.68 0.021 182.76 -0.292412 14.620580 -0.034
be 0.200 100 0.001250 0.031416 -0.040 -1 1.27 167531.52 0.022 576.74 -0.922784 46.139190 -0.034
ed 0.200 125 0.001250 0.031416 -0.025 -1 0.80 104707.20 0.023 744.87 -0.465543 37.243406 0.006093 -0.019
dc 0.200 125 0.001250 0.031416 0.025 1 0.80 104707.20 0.023 744.87 0.465543 37.243406 0.031
ca 0.200 100 0.001250 0.031416 0.020 1 0.64 83765.76 0.024 607.53 0.243013 24.301323 0.026
-0.972182 159.547905

B cd 0.200 125 0.001250 0.031416 -0.025 -1 0.80 104707.20 0.023 744.87 -0.465543 37.243406 -0.016
dg 0.150 100 0.001667 0.017671 -0.020 -1 1.13 111687.68 0.024 2636.89 -1.054757 105.475695 -0.011
0.009262
gf 0.250 125 0.001000 0.049087 -0.020 -1 0.41 67012.61 0.023 246.38 -0.098553 9.855337 -0.011
fc 0.150 100 0.001667 0.017671 -0.005 -1 0.28 27921.92 0.028 3041.09 -0.076027 30.410950 0.004
-1.694880 182.985388

C de 0.200 125 0.001250 0.031416 0.025 1 0.80 104707.20 0.023 744.87 0.465543 37.243406 0.029
eh 0.100 100 0.002500 0.007854 -0.015 -1 1.91 125648.64 0.026 21705.93 -4.883834 651.177925 -0.011
0.004237
hg 0.250 125 0.001000 0.049087 0.000 1 0.00 0.00 0.000 0.00 0.000000 0.000000 0.004
gd 0.150 100 0.001667 0.017671 0.020 1 1.13 111687.68 0.024 2636.89 1.054757 105.475695 0.024
-3.363535 793.897026

Since not all Q is below 0.002 which is the tolerance, there is a need for another iteration.
Iteration 2
(kg/m ) 1000 e (m) 0.00025 (Pa-s) 0.00152 Swamee D-W h
CCW (1) KQ
Loop Pipe D (m) L (m) /D A (m) Q (m/s) V (m/s) Re (VD/) f K (8fL/gD) |2KQ| Q new Q
CW (-1) CCW (+) CW (-)
A ab 0.300 250 0.000833 0.070686 -0.034 -1 0.48 94673.86 0.022 185.84 -0.213657 12.602667 -0.034
be 0.200 100 0.001250 0.031416 -0.034 -1 1.08 142010.79 0.023 582.73 -0.669941 39.516822 -0.034
ed 0.200 125 0.001250 0.031416 -0.019 -1 0.60 79186.47 0.024 763.45 -0.272905 28.868654 0.000278 -0.019
dc 0.200 125 0.001250 0.031416 0.031 1 0.99 130227.93 0.023 732.72 0.708393 45.565578 0.031
ca 0.200 100 0.001250 0.031416 0.026 1 0.83 109286.49 0.023 593.86 0.404341 30.991846 0.026
-0.043769 157.545567

B cd 0.200 125 0.001250 0.031416 -0.016 -1 0.50 65913.683 0.024 777.75 -0.192628 24.479913 -0.012
dg 0.150 100 0.001667 0.017671 -0.011 -1 0.61 59962.991 0.025 2772.25 -0.319631 59.534792 -0.007
0.004183
gf 0.250 125 0.001000 0.049087 -0.011 -1 0.22 35977.794 0.025 268.21 -0.030924 5.759890 -0.007
fc 0.150 100 0.001667 0.017671 0.004 1 0.24 23802.769 0.029 3115.67 0.056605 26.560356 0.008
-0.486577 116.334951

C de 0.200 125 0.001250 0.031416 0.029 1 0.93 122451.88 0.023 735.96 0.629087 43.033998 0.030
eh 0.100 100 0.002500 0.007854 -0.011 -1 1.37 90159.269 0.027 22081.21 -2.558059 475.331615 -0.010
0.000606
hg 0.250 125 0.001000 0.049087 0.004 1 0.09 14195.748 0.030 318.95 0.005725 2.702587 0.005
gd 0.150 100 0.001667 0.017671 0.024 1 1.37 135347.26 0.024 2606.23 1.530949 126.332920 0.025
-0.392298 647.401119

Again, since not all Q is below 0.002 which is the tolerance, there is a need for another iteration.
Iteration 3
(kg/m ) 1000 e (m) 0.00025 (Pa-s) 0.00152 Swamee D-W h
CCW (1) KQ
Loop Pipe D (m) L (m) /D A (m) Q (m/s) V (m/s) Re (VD/) f K (8fL/gD) |2KQ| Q new Q
CW (-1) CCW (+) CW (-)
A ab 0.300 250 0.000833 0.070686 -0.034 -1 0.48 93898.136 0.022 186.01 -0.210354 12.510335 -0.034
be 0.200 100 0.001250 0.031416 -0.034 -1 1.07 140847.2 0.023 583.05 -0.659368 39.214427 -0.034
ed 0.200 125 0.001250 0.031416 -0.019 -1 0.59 78022.884 0.024 764.54 -0.265321 28.485023 0.000011 -0.019
dc 0.200 125 0.001250 0.031416 0.031 1 1.00 131391.51 0.023 732.27 0.720661 45.944130 0.031
ca 0.200 100 0.001250 0.031416 0.026 1 0.84 110450.07 0.023 593.37 0.412654 31.295836 0.026
-0.001728 157.449752

B cd 0.200 125 0.001250 0.031416 -0.012 -1 0.37 48395.938 0.025 806.11 -0.107631 18.629278 -0.011
dg 0.150 100 0.001667 0.017671 -0.007 -1 0.37 36605.997 0.027 2930.27 -0.125910 38.416208 -0.006
0.000398
gf 0.250 125 0.001000 0.049087 -0.007 -1 0.13 21963.598 0.028 292.01 -0.012547 3.828277 -0.006
fc 0.150 100 0.001667 0.017671 0.008 1 0.48 47159.762 0.026 2842.67 0.202730 48.012255 0.009
-0.043359 108.886017

C de 0.200 125 0.001250 0.031416 0.030 1 0.95 124989.81 0.023 734.86 0.654459 43.860603 0.030
eh 0.100 100 0.002500 0.007854 -0.010 -1 1.29 85083.414 0.027 22157.41 -2.285997 450.118997 -0.010
0.000029
hg 0.250 125 0.001000 0.049087 0.005 1 0.10 16226.09 0.029 310.04 0.007271 3.002880 0.005
gd 0.150 100 0.001667 0.017671 0.025 1 1.41 138731.16 0.024 2602.60 1.606223 129.311457 0.025
-0.018044 626.293937

FINALLY, ALL Q is below 0.002 which is the tolerance, the new Qs will be our final discharges for each pipes.
Follow-up Question: Pressure at d?

Pressure Head
a 40 m
Flow to be considered Head Losses
a-c (m/s) c-d (m/s) a-c (m) c-d (m)
0.026 0.011 0.210 0.108
Pressure Head at a 40.000 m
Pressure Head at c 39.790 m
Pressure Head at d 39.682 m

Elevation Heads at a, c and d = 0 (same elevation) and Velocity Heads at a, c, and d = 0 (velocity is zero at junctions)
Pressure Head at c = Pressure Head at a Head Loss (a-c) = 40 m 0.210 m = 39.790 m
Pressure Head at d = Pressure Head at c Head Loss (c-d) = 39.790 m 0.108 m = 39.682 m