NUMBER SOW
Signature:. DATE: .
Rev.fdsafdsa
Date Description By Chkd Reviewed
A 08/05/2017 SCOPE APPROVED FOR TENDERING SL TS
B 10/05/2017 ISSUED FOR REVIEW EK GK
0 16/06/2017 Issued for Signing SL SL GK
S
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 2 of 13
TABLE OF CONTENTS
1 TITLE .................................................................................................................. 4
2 LOCATION ......................................................................................................... 4
3 SCOPE OF WORK ............................................................................................. 4
3.1 General .............................................................................................................................. 4
3.2 Level of Competency......................................................................................................... 4
3.3 Equipment List ................................................................................................................... 5
3.4 Non-Routine Monitoring .................................................................................................... 5
3.5 Response Time ................................................................................................................. 5
3.6 Reporting ........................................................................................................................... 5
3.7 Key Performance Indicators .............................................................................................. 6
3.8 Charge out Rate ................................................................................................................ 6
3.9 Work Included ................................................................................................................... 6
3.9.1 General ............................................................................................................. 6
3.9.2 Site Access ....................................................................................................... 7
4 MATERIAL SUPPLY .......................................................................................... 7
4.1 Company Supply ............................................................................................................... 7
4.2 Contractor Supply.............................................................................................................. 7
5 SAFETY .............................................................................................................. 7
5.1 General .............................................................................................................................. 7
5.2 Hazards/Hazard Analysis .................................................................................................. 8
6 SITE REQUIREMENTS ...................................................................................... 8
6.1 Medical Requirements....................................................................................................... 8
6.2 Fitness for Work ................................................................................................................ 8
6.3 Inductions .......................................................................................................................... 9
6.4 Personal Protective Equipment (PPE) .............................................................................. 9
6.5 Licences, Training & Qualifications ................................................................................... 9
6.6 Electrical Equipment .......................................................................................................... 9
7 SITE ESTABLISHMENT................................................................................... 10
7.1.1 Facilities Provided by the Company ...............................................................10
7.2 Permits ............................................................................................................................10
7.3 Working Hours .................................................................................................................10
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 3 of 13
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 4 of 13
1 TITLE
Vibration analysis of mechanical equipment
2 LOCATION
Ravensthorpe Nickel Operation (RNO) is an open cut nickel and cobalt mine producing mixed
hydroxide precipitate through a highly technical hydrometallurgical process.
a) Site Location and Access
RNO is located approximately 530 kilometres south of Perth and 35 kilometres east of
Ravensthorpe. The site is accessed from the South Coast Highway on well-maintained bitumen
sealed roads.
b) Climate
Climatic data for the area is available from the Bureau of Meteorology on its website
(http://www.bom.gov.au).
3 SCOPE OF WORK
3.1 General
This Scope of Work is for the provision of services for routine inspection and fault diagnostics
of critical mechanical equipment using vibration analysis.
Plant monitoring points shall include (but not limited to) all nominated:
a) Motors;
b) Drive heads;
c) Pump Systems; and
d) Gearboxes
The requirement is to collect routine and non-routine vibration data and liaise with site personnel
in coordinating data collection periods and reporting the findings.
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 5 of 13
Contractor will submit all qualifications and certifications to the Company for approval prior to
mobilising to site.
3.6 Reporting
Vibration data from the RNO plant will be analysed at the time of collection and preliminary
interpretation given to the Companys Representative prior to leaving site. All other vibration
data will be interpreted and formal plant condition assessment reports provided to the Company
within five (5) working days after routine vibration data is collected.
The Contractor will interpret the data collected and report on the condition of equipment and its
components. The fault symptoms shall include the relevant data that indicates a particular fault.
The diagnosis shall include the interpretation of the faults relevant to the machine components.
The prognosis and recommendations shall include what type and rate of failure is expected and
what corrective actions should be implemented in what time frame.
In the case that a defect has been identified during the data interpretation stage it is required
that the Contractor will make at least verbal contact immediately to the Company
Representative alerting them of the impending problem.
The style of the formal reporting will be in an electronic format. In addition to routine emailed
plant condition assessment reports it would be desirable for the Contractor to have the
capability to provide a view of machine condition assessments via web access.
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 6 of 13
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 7 of 13
The Contractor shall be responsible for the procurement of all Materials necessary to complete
the Services and/or Works including all equipment not specifically listed in this Scope of Work
as Company supplied.
The Contractor shall ensure that all Materials supplied for the Services and/or Works are
approved by the Company prior to procurement.
The Contractor shall be responsible for all sourcing, expediting, procuring, packing, handling,
transporting, delivery to Site, loading and unloading, cranage, storage, security and inspection
at Site of all materials to be supplied by the Contractor for the Services and/or Works.
3.9.2 Site Access
The Contractor shall agree that any access to Site shall be pre-approved by the Company
representative. Mention must be made of the works to be undertaken in areas surrounding
conveyors and associated substations during scheduled shut downs as well as during plant
standard operation.
4 MATERIAL SUPPLY
5 SAFETY
5.1 General
The Contractor shall be responsible for safety of its Personnel and equipment when on Site and
acknowledges the Companys commitment to our zero harm policy for all employees and
contractors.
The Contractor shall comply with the requirements of:
a) The Companys Fitness for Work Guideline RNO-HS-AF-GUI-0144.
b) The Contractors Safety Management Plan;
c) The Companys Safety Policy RNO-HS-SAF-POL-001.1;
d) The Companys Risk Management Guideline RNO-HS-SAF-GUI-005.2;
e) The Companys Environmental Licence L8008-2004-4;
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 8 of 13
f) The Health, Safety and Environment conditions of any contract applicable to this Scope of
Work; and
g) All other safety requirements and initiatives that may be implemented by the Company
from time to time, during the term of any contract applicable to this Scope of Work.
The Contractor shall ensure that all machinery, tools and other equipment used in performing
the work under this Contract are maintained in a fully serviced and safe condition with current
electrical tags and in conformity with all Mines Safety and Inspection Regulations and
Occupational Health Safety and Welfare Regulations.
6 SITE REQUIREMENTS
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 9 of 13
6.3 Inductions
The Contractor shall ensure that all personnel engaged in the Services on Site have undertaken
Company Site General, Site Area and project specific inductions.
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 10 of 13
In the event that any equipment is found to be non-compliant and to ensure the continuity of
Services it will be the responsibility of the Contractor, at the Contractors own cost to have the
equipment replaced or retested and tagged.
7 SITE ESTABLISHMENT
7.1.1 Facilities Provided by the Company
The Company shall provide:
a) Flights on the Companys charter flight or other flights (as agreed) and/or in accordance
with Schedule 7 of the Contract;
b) Accommodation and Meals in accordance with Schedule 7 of the Contract;
c) Shared crib and ablution facilities on Site; and
d) Site medical centre and emergency response facilities.
7.2 Permits
The Contactor must obtain Permits prior to commencing the Work. Permits that are required for
Work on Site are:
a) Level 1 work permit;
b) Level 2 work permit;
c) RNO-PRO-FRM-G-010.4 Confined Space Entry;
d) RNO-PRO-FRM-G-014.1 CSE Sign In Out register;
e) RNO-PRO-FRM-G-008.4 Test And Jog Certificate;
f) RNO-PRO-FRM-G-011.4 Hot Works Certificate;
g) RNO-PRO-FRM-G-012.4 Working at Heights Certificate; and
h) RNO-PRO-FRM-G-007.4 Flooring Handrail removal Certificate.
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 11 of 13
When required, any issues arising with this interaction will be dealt with by the Company
Representative.
8 CONTRACT DOCUMENTS
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 12 of 13
8.2.3 Procedures
Table 3: Procedures
Document No. Title
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
Page: 13 of 13
9 APPENDICES
Appendix 1 Vibration Analysis Equipment List here
Document NameRNO-PL-FRM-008 (SOW) Revision Number 2.0 Issue Date 7 August 2014
P:\RavProcurement\Templates SOW Last Printed: 16/05/2017 9:57 AMEve Kent
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
APPENDIX-1
VIBRATION ANALYSIS EQUIPMENT LIST
CRITICALITY RATINGS 1,2,3
Sr Number Equipment Description Details OEM
1 15110-CVY-17 Saprolite Crushing Conveyor PN1500/3, 8 x 3 Covers
2 15210-CVY-16 Limonite Crushing Conveyor PN1500/3, 8 x 3 Covers
3 RN-15-210-FDR-04 SAP HY CRUSHER APRON FEEDER 1.8 m W x 7.1 m L RCR Tomlinson 1M-C031
1440 wt/h, 150 mm topsize; 1.2 m W x 48 m L x 2.2
4 RN-15-110-CVY-01 LIM HY CRUSHER DISCHARGE CONVEYOR 1 m lift, 2.4 m/s
1440 wt/h, 150 mm topsize; 1.2 m W x 48 m L x 2.2
5 RN-15-210-CVY-08 SAP HY CRUSHER DISCHARGE CONVEYOR 1 m lift, 2.4 m/s
1440 wt/h, 150 mm topsize, 1.2 m W x 298 m L x 23
6 RN-15-410-CVY-02 LIM SR STACKER FEED CONVEYOR m lift, 2.0 m/s ThyssenKrupp 1M-C065
7 RN-15-410-CVY-04 LIM SR STACKER BOOM CONVEYOR ThyssenKrupp 1M-C065
8 RN-15-410-CVY-05 LIM SR STOCKPILE RECLAIM CONVEYOR 1 ThyssenKrupp 1M-C065
1278 wt/h, 150 mm topsize, 15% moisture, 1.8 m W
9 RN-15-410-FDR-03 LIM SR APRON FEEDER x6mL RCR Tomlinson 1M-C031
10 RN-15-410-RCL-01 LIM SR BUCKET WHEEL RECLAIMER ThyssenKrupp 1M-C065
1470 wt/h, 150 mm topsize 1.2 m W x 167 m L x
11 RN-15-410-CVY-06 LIM SR STOCKPILE RECLAIM CONVEYOR 2 14.8 m lift, 2.2 m/s
12 RN-15-410-CVY-07 LIM SR SCRUBBER FEED CONVEYOR 1470 wt/h, 150 mm topsize 1.2 m W x 142 m L x
13 RN-15410-FDR-02 Saprolite Sample Feeder Conveyor PN1000/3, 8 x 3 Covers, M Grade
1440 wt/h, 150 mm topsize, 1.2 m W x 170 m L x 16
14 RN-15-510-CVY-09 SAP SR STACKER FEED CONVEYOR m lift, 2.0 m/s ThyssenKrupp 1M-C065
15 RN-15-510-CVY-10 SAP SR STACKER BOOM CONVEYOR ThyssenKrupp 1M-C065
495 tph, 150 mm topsize, 15% moisture, 1.8 m W x
16 RN-15-510-FDR-08 SAP SR APRON FEEDER 6mL
17 RN-15-510-RCL-02 SAP SR BUCKET WHEEL RECLAIMER ThyssenKrupp 1M-C065
18 RN-20-110-DSR-01 LIM BENE SCRUBBER 1038 dt/h, 5 m D by 10.25 m EGL, 2 min residence Outokumpu 1M-C081
19 RN-20-110-PMP-01 LIM BENE PRIMARY CYCLONE FEED PUMP 1 2893 m3/h, SG 1.24, 30 m TDH Warman 400TU-MCH 1M-C031
20 RN-20-110-PMP-02 LIM BENE PRIMARY CYCLONE FEED PUMP 2 2893 m3/h, SG 1.24, 30m TDH Warman 400TU-MCH 1M-C031
21 RN-20-110-PMP-80 LIM BENE SUMP PUMP 1 162 m3/h, 23% solids, SG 1.24, 18 m TDH Warman 100RV-SPR 1M-C031
22 RN-20-110-SCN-01 LIM BENE SCRUBBER SCREEN 3.6 m x 7.3 m double deck Schenck SLK 3673W 1M-C031
23 RN-20-120-ATM-01 LIM BENE ATTRITIONER 1 AGITATOR 780 Q150 Lightnin 1M-C031
24 RN-20-120-CLA-01 LIM BENE SCREW CLASSIFIER 1 S2000 / 10500 CORAL / KISA 1M-C031
25 RN-20-120-CLA-02 LIM BENE SCREW CLASSIFIER 2 S2000 / 10500 CORAL / KISA 1M-C031
26 RN-20-120-PMP-03 LIM BENE SECONDARY CYC FEED PUMP 1 2206 m3/h, SG 1.24; 29 m TDH Warman 400TU-MCH 1M-C031
27 RN-20-120-PMP-04 LIM BENE SECONDARY CYC FEED PUMP 2 2206 m3/h, SG 1.24; 29 m TDH Warman 400TU-MCH 1M-C031
28 RN-20-120-PMP-05 LIM BENE TERTIARY CYC FEED PUMP 1 1272 m3/h, SG 1.07, 29 m TDH Warman 12/10EE-M 1M-C031
29 RN-20-120-PMP-06 LIM BENE TERTIARY CYC FEED PUMP 2 1272 m3/h, SG 1.07, 29 m TDH Warman 12/10EE-M 1M-C031
30 RN-20-130-PMP-07 LIM BENE THICKENER FEED PUMP 1 2497 m3/h, SG 1.08, 22 m TDH Warman 400ST-L 1M-C031
31 RN-20-130-PMP-08 LIM BENE THICKENER FEED PUMP 2 2497 m3/h, SG 1.08, 22 m TDH Warman 400ST-L 1M-C031
32 RN-20-130-PMP-09 LIM BENE THICKENER FEED PUMP 3 2497 m3/h, SG 1.08, 22 m TDH Warman 400ST-L 1M-C031
33 RN-20-130-PMP-10 LIM BENE THICKENER 1 U/F PUMP 1 250 m3/h, SG 1.47, 20 m TDH Warman 6E-AHF 1M-C031
34 RN-20-130-PMP-11 LIM BENE THICKENER 1 U/F PUMP 2 250 m3/h, SG 1.47, 20 m TDH Warman 6E-AHF 1M-C031
35 RN-20-130-PMP-12 LIM BENE THICKENER 2 U/F PUMP 1 250 m3/h, SG 1.47, 20 m TDH Warman 6E-AHF 1M-C031
36 RN-20-130-PMP-13 LIM BENE THICKENER 2 U/F PUMP 2 250 m3/h, SG 1.47, 20 m TDH Warman 6E-AHF 1M-C031
37 RN-20-140-PMP-14 LIM BENE T1 PAL THICKENER FEED PUMP 1 260 m3/h, 42 m TDH, SG 1.47 Warman 8/6F-AH 1M-C031
38 RN-20-140-PMP-15 LIM BENE T1 PAL THICKENER FEED PUMP 2 260 m3/h, 42 m TDH, SG 1.47 Warman 8/6F-AH 1M-C031
39 RN-20-140-PMP-16 LIM BENE T2 PAL THICKENER FEED PUMP 1 260 m3/h, 36 m TDH, SG 1.47 Warman 8/6F-AH 1M-C031
40 RN-20-140-PMP-17 LIM BENE T2 PAL THICKENER FEED PUMP 2 260 m3/h, 36 m TDH, SG 1.47 Warman 8/6F-AH 1M-C031
41 RN-20-150-PMP-18 LIM BENE WPR PUMP 1 2580 m3/h, SG 1.03, 48 m TDH Warman 450G-L 1M-C031
42 RN-20-150-PMP-18 LIM BENE WPR PUMP 1 2580 m3/h, SG 1.03, 48 m TDH Warman 450G-L 1M-C031
43 RN-20-150-PMP-19 LIM BENE WPR PUMP 2 2580 m3/h, SG 1.03, 48 m TDH Warman 450G-L 1M-C031
44 RN-20-150-PMP-19 LIM BENE WPR PUMP 2 2580 m3/h, SG 1.03, 48 m TDH Warman 450G-L 1M-C031
45 RN-20-150-PMP-20 LIM BENE WPR PUMP 3 2580 m3/h, SG 1.03, 48 m TDH Warman 450G-L 1M-C031
46 RN-20-150-PMP-20 LIM BENE WPR PUMP 3 2580 m3/h, SG 1.03, 48 m TDH Warman 450G-L 1M-C031
47 RN-20-150-PMP-35 LIM BENE HYP SAL& DUST SP BOOSTER PUMP 50 m3/h x 60m TDH Warman 4/3CC-AH 1M-C031
48 RN-20-210-DSR-02 SAP BENE SCRUBBER 387 dt/h, 2 min residence, 4.0 m D by 7.0 m EGL Outokumpu 1M-C081
49 RN-20-210-PMP-21 SAP BENE PRIMARY CYC FEED PUMP 1 1004 m3/h, 28.4 m TDH, SG 1.25 Warman 12/10F-AH 1M-C031
50 RN-20-210-PMP-22 SAP BENE PRIMARY CYC FEED PUMP 2 1004 m3/h, 28.4 m TDH, SG 1.25 Warman 12/10F-AH 1M-C031
51 RN-20-210-PMP-85 SAP BENE SUMP PUMP 1 204 m3/h, SG 1.24, 16 m TDH Warman 100RV-SPR 1M-C031
52 RN-20-210-SCN-05 SAP BENE SCRUBBER SCREEN 2.4 m x 4.8 m double deck Schenck SLK 2448W 1M-C031
53 RN-20-220-ATM-10 SAP BENE ATTRITIONER 1 AGITATOR 780 Q 150 Lightnin 1M-C031
54 RN-20-220-ATM-17 SAP BENE ATTRITIONER 2 AGITATOR 780 Q 150 Lightnin 1M-C031
55 RN-20-220-CLA-03 SAP BENE SCREW CLASSIFIER S2000/10500 CORAL / KISA 1M-C031
56 RN-20-220-PMP-23 SAP BENE SECONDARY CYC FEED PUMP 1 727 m3/h, 28.5 m TDH, SG 1.23 Warman 12/10 F-AH 1M-C031
57 RN-20-220-PMP-24 SAP BENE SECONDARY CYC FEED PUMP 2 727 m3/h, 28.5 m TDH, SG 1.23 Warman 12/10 F-AH 1M-C031
58 RN-20-220-PMP-25 SAP BENE TERTIARY CYC FEED PUMP 1 368 m3/h, 28.5 m TDH, SG 1.09 Warman 8/6E-AH 1M-C031
59 RN-20-220-PMP-26 SAP BENE TERTIARY CYC FEED PUMP 2 368 m3/h, 28.5 m TDH, SG 1.09 Warman 8/6E-AH 1M-C031
60 RN-20-230-PMP-27 SAP BENE THICKENER FEED PUMP 1 1598 m3/h, 24 m TDH, SG 1.10 Warman 350FF-L 1M-C031
61 RN-20-230-PMP-28 SAP BENE THICKENER FEED PUMP 2 1598 m3/h, 24 m TDH, SG 1.10 Warman 350FF-L 1M-C031
62 RN-20-230-PMP-29 SAP BENE THICKENER U/F PUMP 1 262 m3/h, 16 m TDH, SG 1.44 Warman 6E-AHF 1M-C031
63 RN-20-230-PMP-30 SAP BENE THICKENER U/F PUMP 2 262 m3/h, 16 m TDH, SG 1.44 Warman 6E-AHF 1M-C031
64 RN-20-240-PMP-31 SAP BENE AL FEED PUMP 1 263 m3/h, 61 m TDH, SG 1.43 Warman 8/6 FF-AH 1M-C031
65 RN-20-240-PMP-32 SAP BENE AL FEED PUMP 2 263 m3/h, 61 m TDH, SG 1.43 Warman 8/6 FF-AH 1M-C031
66 RN-20-250-PMP-33 SAP BENE WPR PUMP 1 1591 m3/h, SG 1.04, 42 m TDH Warman 300FF-L 1M-C031
67 RN-20-250-PMP-34 SAP BENE WPR PUMP 2 1591 m3/h, SG 1.04, 42 m TDH Warman 300FF-L 1M-C031
68 RN-15-510-CVY-11 SAP SR STOCKPILE RECLAIM CONVEYOR 1 ThyssenKrupp 1M-C065
570 wt/h, 150 mm topsize, 0.9 m W x 150 m L x
69 RN-15-510-CVY-12 SAP SR STOCKPILE RECLAIM CONVEYOR 2 18.5 m lift, 1.8 m/s
570 wt/h, 150 mm topsize, 0.9 m W x 172 m L x
70 RN-15-510-CVY-13 SAP SR SCRUBBER FEED CONVEYOR 11.8 m lift, 1.8 m/s
71 RN-15510-FDR-07 Limonite Sample Feeder Conveyor PN1000/3, 8 x 3 Covers, M Grade
72 RN-25-110-PMP-01 T1 PAL THICKENER U/F PUMP 1 277 m3/h, 11.5 m TDH, SG 1.45 Warman 6E-AHF 2M-C032
73 RN-25-110-PMP-02 T1 PAL THICKENER U/F PUMP 2 277 m3/h, 11.5 m TDH, SG 1.45 Warman 6E-AHF 2M-C032
74 RN-25-110-PMP-03 T1 PAL THICKENER O/F PUMP 1 960 m3/h, 32 m TDH, SG 1.02 Warman 12/10EE-M 2M-C032
75 RN-25-110-PMP-04 T1 PAL THICKENER O/F PUMP 2 960 m3/h, 32 m TDH, SG 1.02 Warman 12/10EE-M 2M-C032
76 RN-25-110-PMP-05 T1 PAL MP HEATER FEED PUMP 1 STAGE 1 277 m3/h, 21.5 m TDH/Stage, SG 1.44 Warman 4EE-AHF 2M-C032
77 RN-25-110-PMP-06 T1 PAL MP HEATER FEED PUMP 1 STAGE 2 277 m3/h, 40 m TDH/Stage, SG 1.44 Warman 6/4EE-AH 2M-C032
78 RN-25-110-PMP-07 T1 PAL MP HEATER FEED PUMP 2 STAGE 1 277 m3/h, 21.5 m TDH/Stage, SG 1.44 Warman 4EE-AHF 2M-C032
79 RN-25-110-PMP-08 T1 PAL MP HEATER FEED PUMP 2 STAGE 2 277 m3/h, 40 m TDH/Stage, SG 1.44 Warman 6/4EE-AH 2M-C032
80 RN-25-110-PMP-09 T1 PAL HP HEATER FEED PUMP 1 STAGE 1 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
81 RN-25-110-PMP-10 T1 PAL HP HEATER FEED PUMP 1 STAGE 2 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
82 RN-25-110-PMP-11 T1 PAL HP HEATER FEED PUMP 1 STAGE 3 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
83 RN-25-110-PMP-12 T1 PAL HP HEATER FEED PUMP 2 STAGE 1 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
84 RN-25-110-PMP-13 T1 PAL HP HEATER FEED PUMP 2 STAGE 2 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
85 RN-25-110-PMP-14 T1 PAL HP HEATER FEED PUMP 2 STAGE 3 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
DocuSign Envelope ID: A7BA27D8-4166-4A66-9DBA-B37A29DA8969
86 RN-25-120-AFP-01 T1 PAL AUTOCLAVE FEED PUMP 1 323 m3/hr, 280 m TDH, SG 1.25 GEHO TZPM 1200 2M-C032
87 RN-25-120-AFP-02 T1 PAL AUTOCLAVE FEED PUMP 2 323 m3/hr, 280 m TDH, SG 1.25 GEHO TZPM 1200 2M-C032
88 RN-25-130-PMP-15 T1 PAL PRODUCT PUMP 1 295 m3/h, 18 m TDH, SG 1.56 Warman 8/6E-AH 2M-C032
89 RN-25-130-PMP-16 T1 PAL PRODUCT PUMP 2 295 m3/h, 18 m TDH, SG 1.56 Warman 8/6E-AH 2M-C032
90 RN-25-150-PMP-26 T1 PAL HP SULPHURIC ACID PUMP 1 Sulzer HPP207-40, 35 m3/h, 279 m TDH, SG 1.83 Malcolm Tompson pumps 2M-C032
91 RN-25-150-PMP-27 T1 PAL HP SULPHURIC ACID PUMP 2 Sulzer HPP207-40, 35 m3/h, 279 m TDH, SG 1.83 Malcolm Tompson pumps 2M-C032
92 RN-25-210-PMP-33 T2 PAL THICKENER O/F PUMP 1 960 m3/h, 32 m TDH, SG 1.02 Warman 12/10EE-M 2M-C032
93 RN-25-210-PMP-34 T2 PAL THICKENER O/F PUMP 2 960 m3/h, 32 m TDH, SG 1.02 Warman 12/10EE-M 2M-C032
94 RN-25-210-PMP-35 T2 PAL THICKENER U/F PUMP 1 277 m3/h, 11.5 m TDH, SG 1.45 Warman 6E-AHF 2M-C032
95 RN-25-210-PMP-36 T2 PAL THICKENER U/F PUMP 2 277 m3/h, 11.5 m TDH, SG 1.45 Warman 6E-AHF 2M-C032
96 RN-25-210-PMP-37 T2 PAL MP HEATER FEED PUMP 1 STAGE 1 277 m3/h, 21.5 m TDH/Stage, SG 1.44 Warman 4EE-AHF 2M-C032
97 RN-25-210-PMP-38 T2 PAL MP HEATER FEED PUMP 1 STAGE 2 277 m3/h, 40 m TDH/Stage, SG 1.44 Warman 6/4EE-AH 2M-C032
98 RN-25-210-PMP-39 T2 PAL MP HEATER FEED PUMP 2 STAGE 1 277 m3/h, 21.5 m TDH/Stage, SG 1.44 Warman 4EE-AHF 2M-C032
99 RN-25-210-PMP-40 T2 PAL MP HEATER FEED PUMP 2 STAGE 2 277 m3/h, 40 m TDH/Stage, SG 1.44 Warman 6/4EE-AH 2M-C032
100 RN-25-210-PMP-41 T2 PAL HP HEATER FEED PUMP 1 STAGE 1 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
101 RN-25-210-PMP-42 T2 PAL HP HEATER FEED PUMP 1 STAGE 2 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
102 RN-25-210-PMP-43 T2 PAL HP HEATER FEED PUMP 1 STAGE 3 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
103 RN-25-210-PMP-44 T2 PAL HP HEATER FEED PUMP 2 STAGE 1 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
104 RN-25-210-PMP-45 T2 PAL HP HEATER FEED PUMP 2 STAGE 2 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
105 RN-25-210-PMP-46 T2 PAL HP HEATER FEED PUMP 2 STAGE 3 318 m3/h, 40 m TDH/Stage, SG 1.35 Warman 6/4EE-AHP 2M-C032
106 RN-25-220-AFP-03 T2 PAL AUTOCLAVE FEED PUMP 1 323 m3/hr, 280 m TDH, SG 1.25 GEHO TZPM 1200 2M-C032
107 RN-25-220-AFP-04 T2 PAL AUTOCLAVE FEED PUMP 2 323 m3/hr, 280 m TDH, SG 1.25 GEHO TZPM 1200 2M-C032
108 RN-25-230-PMP-47 T2 PAL PRODUCT PUMP 1 295 m3/h, 18 m TDH, SG 1.56 Warman 8/6E-AH 2M-C032
109 RN-25-230-PMP-48 T2 PAL PRODUCT PUMP 2 295 m3/h, 18 m TDH, SG 1.56 Warman 8/6E-AH 2M-C032
110 RN-25-250-PMP-58 T2 PAL HP SULPHURIC ACID PUMP 1 Sulzer HPP207-40, 35 m3/h, 279 m TDH, SG 1.83 Malcolm Tompson Pumps 2M-C032
111 RN-25-250-PMP-59 T2 PAL HP SULPHURIC ACID PUMP 2 Sulzer HPP207-40, 35 m3/h, 279 m TDH, SG 1.83 Malcolm Tompson Pumps 2M-C032
Goulds 3171, 1x1.5-8, 12 m3/h, 7.5 m TDH, SG
112 RN-25-250-PMP-91 T2 PAL SUMP PUMP 5 1.83 Blakers Pumps 2M-C032
113 RN-25-260-PMP-60 T2 PAL HOT WATER PUMP 1 817 m3/h, 21 m TDH, SG 1.05 Warman 300F-L 2M-C032
114 RN-25-260-PMP-61 T2 PAL HOT WATER PUMP 2 817 m3/h, 21 m TDH, SG 1.05 Warman 300F-L 2M-C032
115 RN-30-110-PMP-01 AL FEED PUMP 1 292 m3/hr, 17 m TDH, SG 1.58 Warman 8/6E-AH 3M-C030
116 RN-30-110-PMP-02 AL FEED PUMP 2 292 m3/hr, 17 m TDH, SG 1.58 Warman 8/6E-AH 3M-C030
117 RN-30-110-PMP-80 AL PRELEACH SUMP PUMP 50 m3/hr, 1.6 SG, 16 m TDH Warman 65QV-SPR 3M-C030
118 RN-30-120-PMP-81 AL SUMP PUMP 1 46 m3/hr slurry, 1.6 SG, 22 m TDH Warman 65QV-SPR 3M-C030
119 RN-30-120-PMP-82 AL SUMP PUMP 2 46 m3/hr slurry, 1.6 SG, 22 m TDH Warman 65QV-SPR 3M-C030
120 RN-30-130-PMP-83 AL IJP SUMP PUMP 56 m3/hr, 1.6 SG, 21 m TDH Warman 65QV-SPR 3M-C030
121 RN-30-140-PMP-03 AL VENT SYSTEM PUMP 1 38 m3/hr, 36 m TDH, SG 1.03 Warman 3/2C-AH 3M-C030
122 RN-30-140-PMP-04 AL VENT SYSTEM PUMP 2 38 m3/hr, 36 m TDH, SG 1.03 Warman 3/2C-AH 3M-C030
123 RN-30-210-PMP-05 PN CCD FEED PUMP 1 1011 m3/hr, 11 m TDH, SG 1.54 Warman 300F-L 3M-C030
124 RN-30-210-PMP-06 PN CCD FEED PUMP 2 1011 m3/hr, 11 m TDH, SG 1.54 Warman 300F-L 3M-C030
125 RN-30-210-PMP-84 PN SUMP PUMP 186 m3/hr, 1.6 SG, 26 m TDH Warman 100QV-SPR 3M-C030
126 RN-35-130-PMP-09 CCD 3 O/F PUMP 1 1130 m3/hr, 13 m TDH, SG 1.22 Warman 300F-L 3M-C030
127 RN-35-130-PMP-10 CCD 3 O/F PUMP 2 1130 m3/hr, 13 m TDH, SG 1.22 Warman 300F-L 3M-C030
128 RN-35-130-PMP-11 CCD 3 U/F PUMP 1 944 m3/hr, 14 m TDH, SG 1.63 Warman 300F-LF 3M-C030
129 RN-35-130-PMP-12 CCD 3 U/F PUMP 2 944 m3/hr, 14 m TDH, SG 1.63 Warman 300F-LF 3M-C030
130 RN-35-140-PMP-37 CCD 3 FLOCCULANT DILUTION PUMP 120m3/h, 18m TDH, SG 1.22 Warman 4/3C-AH 3M-C030
131 RN-35-140-PMP-47 CCD 4 TURBODIL PUMP 1 Outokumpu 3M-C064
132 RN-35-140-PMP-48 CCD 4 TURBODIL PUMP 2 Outokumpu 3M-C064
133 RN-35-150-PMP-17 CCD 5 O/F PUMP 1 1130 m3/hr, 13 m TDH, SG 1.22 Warman 300F-L 3M-C030
134 RN-35-150-PMP-18 CCD 5 O/F PUMP 2 1130 m3/hr, 13 m TDH, SG 1.22 Warman 300F-L 3M-C030
135 RN-35-150-PMP-19 CCD 5 U/F PUMP 1 947 m3/hr, 14 m TDH, SG 1.63 Warman 300F-LF 3M-C030
136 RN-35-150-PMP-20 CCD 5 U/F PUMP 2 947 m3/hr, 14 m TDH, SG 1.63 Warman 300F-LF 3M-C030
137 RN-35-150-PMP-38 CCD 4 FLOCCULANT DILUTION PUMP 120m3/h, 20m TDH, SG 1.22 Warman 4/3C-AH 3M-C030
138 RN-35-310-PMP-83 SN SUMP PUMP 1 154 m3/h, SG 1.26, 23% w/w solids, 30 m TDH Warman 100RV-SPR 3M-C030
139 RN-35-310-PMP-84 SN SUMP PUMP 2 30 m3/h, SG 1.26, 23% w/w solids, 29 m TDH Warman 65QV-SPR 3M-C030
140 RN-35-340-PMP-33 SN VENT SCRUBBER PUMP 1 40 m3/h, 12m TDH, SG 1.0 Warman 3/2C-AH 3M-C030
141 RN-35-340-PMP-34 SN VENT SCRUBBER PUMP 2 40 m3/h, 12m TDH, SG 1.0 Warman 3/2C-AH 3M-C030
142 RN-40-420-PMP-22 MHP VACUUM FILTER FILTRATE PUMP 1 Krogh 3x9 55-0H Larox 3M-C030
143 RN-40-420-PMP-23 MHP VACUUM FILTER FILTRATE PUMP 2 Krogh 3x9 55-0H Larox 3M-C030
144 RN-40-420-PMP-24 MHP VACUUM FILTER FILTRATE PUMP 3 Krogh 3x9 55-0H Larox 3M-C030
145 RN-40-420-PMP-25 MHP VACUUM FILTER FILTRATE PUMP 4 Krogh 3x9 55-0H Larox 3M-C030
146 RN-40-420-PMP-28 MHP VACUUM FILTER VACUUM PUMP 4500 m3/h 2BE3420-2HYS Nash 3M-C030
147 RN-50-210-PMP-07 AP DIRTY SULPHUR PUMP 1 45 m3/h 40 m TDH Chemetics 4M-C060
148 RN-50-210-PMP-08 AP DIRTY SULPHUR PUMP 2 45 m3/h 40 m TDH Chemetics 4M-C060
149 RN-50-210-PMP-09 AP FILTER PRECOAT PUMP 45 m3/h, 40 m TDH Chemetics 4M-C060
150 RN-50-210-PMP-10 AP SULPHUR DISTRIBUTION TANK PUMP 1 35 m3/h 70 m TDH Chemetics 4M-C060
151 RN-50-210-PMP-11 AP SULPHUR DISTRIBUTION TANK PUMP 2 Chemetics 4M-C060
152 RN-50-220-CMP-01 AP BLOWER 1 236,150 Am3/h (inlet) 4,635 mm wc rise Chemetics 4M-C060
153 RN-50-220-CMP-02 AP BLOWER 2 236,150 Am3/h (inlet) 4,635 mm wc rise Chemetics 4M-C060
154 RN-60-210-PMP-81 LIME SLAKING SUMP PUMP 33 m3/h, SG 1.19, 15 m TDH Warman 40PV-SPR 3M-C030
155 RN-65-110-PMP-01 SEAWATER INTAKE PUMP 1 Flomax TM24TC 1690 m3/h, 38 m TDH, SG 1.03
156 RN-65-110-PMP-02 SEAWATER INTAKE PUMP 2 Flomax TM24TC 1690 m3/h, 38 m TDH, SG 1.03
1321 wt/h; 150 mm topsize 1.2 m W x 50 m L x 0 m
157 RN-20-310-CVY-01 REJECTS LIM HANDLING CONVEYOR lift, 2.2 m/s
1321 wt/h; 150 mm topsize 0.9 m W x 320 m L x
158 RN-20-310-CVY-02 REJECTS COMBINED HANDLING CONVEYOR 26.5 m lift, 3.5 m/s
1436 wt/h; 150 mm topsize 0.9 m W x 444 m L x 28
159 RN-20-310-CVY-03 REJECTS BUFFER STOCKPILE RECLAIM CVY m lift, 4.7 m/s
160 RN-20-310-CVY-04 REJECTS SAP HANDLING CONVEYOR