Académique Documents
Professionnel Documents
Culture Documents
NO
RT
H
dra
in 62'
- 8"
wid
e ro
ad
100KVA
CAR PARKING GENSET
ENTRY/ EXIT
E
S L O P
5M WIDE ROAD 5M WIDE ROAD TO WA RD S PAR KI NG
R A L
00
glass facade till false ceiling level
up up
ADITYA AUTO PRODUCTS & ENGG P. LTD.
N A T U
+300
S I T E
WAITING +300
LOUNGE SEATING
DISCUSSION ROOM
D
CABIN CABIN
DESIGNERS TEAM OPERATIONS TEAM
RECEPTION
A
green
shaft CUST. TOILET
G
A
AS PER REQ.
D
S
shaft
I
A
BOARD ROOM
W
shower
P
TOILET
partition
PROPERTY
up
to first floor
RESTRICTED TILL LOADING/UNLOADING AREA
ROOM - STAY
DINING AREA
FOR 20 PAX
partition wall/ showcase
PANTRY
+300
STAIRS
HEAVY VEHICLE MOVEMENT
up
+300
00
West side compound wall to have
creepers and custom green wall
Site slope towards main road.
ON SEPARATE FOUNDATION ( FOUNDATION MUST
AUTOMATED LOADING AND UNLOADING OF TWO
00
up
MOLDING MACHINE - 1 UNIT
+300
PROPERTY
+300
E
N
Processing Area
LOADING /
E
UNLOADING AREA
N
R I D G E L I N E
N
ROLLING SHUTTER
A
Raw Storage
on GF & Mezzanine
Z
+300 RAMP UP 00
Z
E
S L O P E
2 WHEELER PARKING
N A T U R A L
CAR PARKING
S I T E
DEVANGIE SHRIVASTAVA
OTHER'S PRIVATE PROPERTY 04.09.2017
5M WIDE ROAD 00 5M WIDE ROAD
glass facade till false ceiling level
up up
+300
WAITING +300
LOUNGE SEATING
DISCUSSION ROOM
CABIN CABIN
DESIGNERS TEAM OPERATIONS TEAM
RECEPTION
storage DISPLAY WALL
E
green
shaft CUST. TOILET
G
A
TOILET FEMALE/ OFFICE STORE
TOILET MALE HANDICAPPED.
S
AS PER REQ.
S
shaft
A
BOARD ROOM
shower
P
WORKER'S TOI. TOILET
storage
+300
partition
up
to first floor
ROOM - STAY
DINING AREA
FOR 20 PAX
+300
STAIRS
up
+300
00
GROUND FLOOR
storage
storage
DISCUSSION ROOM
BOARD / TRAINING ROOM
WORKSTATIONS
TOI. FEMALE
PASSAGE
TOI. MALE
WORKSTATIONS
WARDROBE/
DISCUSSION ROOM STORAGE
FUTURE EXTENTION
STAIRS
ROOM
DORM STYLE
FUTURE EXTENTION
up
FIRST FLOOR
DEVANGIE SHRIVASTAVA
04.09.2017
00
up
+300 Molding machine - 1 unit
Automated loading and unloading of two type
components into the same machine.
E
on separate foundation ( foundation must
extend 1' around machine clear size)
N
Day storage of finished goods
I
Production/ (~130 sqm)
L
Processing Area
E LOADING /
UNLOADING AREA
N
R I D G E L I N E
N
ROLLING SHUTTER
A
Raw Storage
on GF & Mezzanine
Z
+300 RAMP UP
Z
E
door lock
provision lift/ shaft drop (as per vendor)
horizontal carousel on GF
DEVANGIE SHRIVASTAVA
MEZZANINE FLOOR - NEW BLOCK 04.09.2017