Vous êtes sur la page 1sur 2

Puente de la Unidad Monterrey, Mexico

Design and construction of an iconic cast in-situ cable-stayed bridge

Puente de la Unidad is a memorable sight in Monterrey.

A bridge that was designed to design in October 2001 and the The structure carries four lanes of
alleviate heavy traffic congestion in contractor, VSL Mexico Ltd/Garcia traffic. The main span is supported
the rapidly growing Monterrey area Ponce JV was awarded the from the north side by 14 pairs of
of Mexico has become one of the construction work in April 2002. SSI 2000 cable stays, varying in
citys most iconic sights and has size from 6-55 to 6-85.
featured on countless postcards. The project in downtown Monterrey
involved the construction of the
International Bridge Technologies bridge with its 304m main span over
began the fast-tracked projects the Santa Catarina River, together
with a 1,376m long approach viaduct.
Scope of works performed The deck varies in width from 28.2m
to 34.8m at the on and off ramps
Project management adjacent to the main pylon.
Technical and method
management VSL Mexicos scope of works in the
Production management 50-50 joint venture included project
Supply and installation of post- management, complete technical and
tensioning method support and part of the
Supply and installation of stay production management. VSL Mexico
cables also supplied and installed 300t of
Supply and installation of VSL post-tensioning and the bridges 440t
Friction Dampers of stays, using the VSL SSI 2000
ID 1090

The pylon features architectural


system. openings.
The stays are suspended from the OWNER
single asymmetric 60 pylon, which Secretaria de Desarollo Urbano y
had to be erected above a major Obras Publicas
highway. The pylon design allows
traffic on the road that runs parallel ENGINEER
to the river to pass directly through International Bridge Technologies
its base. The bridge construction
scheme involved a single-directional MAIN CONTRACTOR
cantilever built using travelling
forms and moveable supports. VSL Mexico Ltd / Garcia Ponce JV

VSLs scope of work also included VSL ENTITY


the supply and installation of 26 VSL Mexico Ltd
VSL Friction Dampers, designed to
absorb vibrations in the stay cables A launching girder was used for the main DATE
to protect them from damage. span construction. 2002-2004

Post-tensioning was installed in the


bridges concrete back-span and In addition, 50 professionals were
approach viaducts as well as involved designing and supervising
vertically for the raked pylon. the project both within and outside
The deck includes a 150m-long the country. Work took place in
composite steel and concrete round-the-clock shifts on five
structure connecting to the simultaneous fronts: pylon, stays,
north viaduct and a 185m-long in-situ transition span, main span
concrete transition span designed and end span.
to receive two access ramps.
The primary achievement of the
Production peaked 10 months after Puente de la Unidad project was
work started on the Puente de la The iconic structure was Monterreys first its delivery to a very tight
Unidad, with 300 workers, 20 full- cable-stayed bridge timescale. The design schedule
time engineers and 15 foremen on was nine months and bridge
site. Strand totalling 300km was installed on site. construction was completed in 15
months - a time frame rarely
achieved for so complex a
structure.

In 2004, Puente de la Unidad won


the bridge category of the Post-
Tensioning Institute award,
following its Grand Award from the
American Council of Engineering
Companies. Entries were based on
creativity, innovation, ingenuity,
cost-effectiveness, functionality,
buildability and aesthetics.

The bridge, which also has special


aesthetic features including
architectural lighting and the use of
Pylon foundation prior to concreting white concrete, opened in
September 2004.
Edited 2008

www.vsl.com